Quarterly Activities & Cashflow Reports
Released
Released
Announcement PDF
ASX
Parkway Minerals NL
ACN 147 346 334
Announcement
16 April 2020
ASX:
FSE:
Level 1, 675 Murray Street
West Perth WA 6005
PO Box 1088
West Perth WA 6872
Australia
T +61 8 9479 5386
parkwayminerals.com.au
PWN
4IP
MARCH 2020 QUARTERLY REPORT
Highlights
Significant Progress in Building aMES™ Technology Platform
•
Emphasis on expanding and leveraging the aMES™ technology platform.
•
Established Engineering & Technology Office at Victoria University.
•
Recruited experienced, technology focused, process engineering team.
•
Building aMES™ technology platform with strategic partners and clients.
Advancement & Rationalisation of Project Portfolio
•
Critically reviewed project portfolio to determine optimal advancement strategy:
o
Karinga Lakes Potash Project (KLPP) – advanced plans to commence PFS.
o
New Mexico Lithium Project (NMLP) – conducted farmout marketing process.
o
Dandaragan Trough Project (DTP) – plan to divest to eliminate holding costs.
Appointment of Non-Executive Director
•
Mr. Richard Beresford, commercialisation specialist appointed NED on 12 March 2020.
Responding to Impacts of COVID-19
•
Implementation of cost-reductions as well as range of risk mitigation strategies.
•
Strong balance sheet with $2.19m in cash and ~$1.5m in marketable securities.
Davenport Resources (ASX: DAV)
•
Parkway Minerals owns ~21% (34.3 million shares) of the issued capital in Davenport.
•
The total Inferred Resource at South Harz potash project in Germany has recently
increased to 5.27 billion tonnes @ 10.8% K2O, containing 567 Mt K2O.
•
Recently completed scoping studies yielded excellent technical and economic results.
Parkway Minerals NL (ASX: PWN) (“Parkway Minerals” or the “Company”) is pleased to
report its activities for the quarter ending 31 March 2020.
Significant Progress in Building aMES™ Technology Platform
In order to support the goal of transforming global brine processing methods through the
innovative aMES™ technology, during the quarter, the Company established a Parkway
Minerals – Engineering & Technical Office, at Victoria University’s Werribee Campus, colocated within the Institute for Sustainable Industries & Liveable Cities.
Two engineering roles were created to develop a more comprehensive aMES™ technology
related engineering capability and to improve interfacing between the R&D team and thirdparty collaborators, including major engineering, procurement, construction (EPC) and
equipment (OEM) partners, as well as prospective clients, two engineering roles were created.
The newly created roles include a Senior Process Innovation Engineer and a Senior Process
Integration Engineer, both of which were recently filled with highly credentialled candidates
with extensive EPC company experience, working for major energy, mining and industrial
clients.
In addition to ongoing discussions with prospective end-users of the aMES™ technology
where significant progress was made, major efforts were concentrated on building the
aMES™ technology platform, with focus on the following key areas:
•
aMES™ Pilot Plant Facility – Detailed design activities were substantially completed
with vendor engagement for key equipment supply currently underway. This state-ofthe-art pilot plant will provide larger scale and versatile process piloting capabilities.
•
aMES™ Process Simulation Capabilities – The Parkway Minerals process
engineering team commenced development of digital process simulation models to
assist with process design and to further optimise key flowsheets.
•
aMES™ Technoeconomic Modelling – A comprehensive technoeconomic model
was developed as a master template, to evaluate the performance and cost
parameters of flowsheets applicable to a broad range of projects in different sectors.
•
aMES™ Flowsheet Development – In addition to existing brine-based flowsheets
(typical in the production of various potash, lithium, borates and magnesium salts),
detailed testwork on a high-value refinery waste stream considered to be highly
problematic, was recently completed with encouraging initial results and will form the
basis of subsequent discussions with the refinery owner, a major global mining
company.
•
aMES™ Partnerships – Continuing to advance potential partnerships with key
partners including a major EPC company, which would provide Parkway Minerals with
an accelerated deployment capability, as well as a structured profit share framework.
The activities outlined above provide Parkway Minerals with an important capability, to be able
to efficiently advance various project opportunities (business development) from a preliminary
assessment, through to process simulation, validation (piloting) and technoeconomic
evaluation, in a relatively short period of time. Although each aMES™ project opportunity
invariably has its own intricacies, the aMES™ technology platform the Company is building,
will enable Parkway Minerals to participate in more projects as a technology solution provider.
Whilst the Company has experienced some delays in interactions with several parties as a
result of COVID-19 related disruptions, the activities outlined above are expected to proceed
Page 2
substantially uninterrupted, as the majority of these tasks can be advanced with limited
physical interaction with external parties.
Karinga Lakes Potash Project – Pre-Feasibility Study (KLPP-PFS)
The KLPP-PFS represents an attractive opportunity for the Company to develop significantly
expanded piloting and aMES™ based simulation capabilities as well as an opportunity to
demonstrate the significant advantages of the aMES™ technology.
•
The Company has received a formal proposal from the preferred engineering services
provider to lead the preparation of the KLPP-PFS.
•
The PFS process will incorporate:
o
the development of an updated resource estimate and mine plan (based on
desktop studies given extensive geological database),
o
the design, assembly and testing of a scaled-up aMES™ pilot plant at Victoria
University to generate important engineering and performance data, and
o
engineering design and technoeconomic analysis.
>> additional information about the Karinga Lakes Potash Project (KLPP) is outlined
in the Advancement & Rationalisation of Mining Project Portfolio section.
Advancement & Rationalisation of Mining Project Portfolio
Parkway Minerals currently holds an equity interest in three mining exploration projects
(outlined below). During the quarter no substantive mining exploration activities occurred in
relation to these projects.
i.
Karinga Lakes Potash Project (KLPP), acquired 15%, right to earn 40%,
ii.
iii.
i)
New Mexico Lithium Project (NMLP), acquired 70%, right to earn 100%, and
Dandaragan Trough Project (DTP), holds 100%, in the process of divesting.
>> a summary of each of these projects is outlined below, with details of the relevant
tenements outlined in the Tenement Interests table at the end of this report.
Karinga Lakes Potash Project (KLPP, 15% interest, earning 40%)
The KLPP is a JV with Verdant Minerals in the Northern Territory (Figure 1). CPC (now a
wholly owned subsidiary of the Company) acquired an initial 15% interest in the KLPP by
completing a scoping study in February 2019. Parkway Minerals is collaborating with Verdant
Minerals in order to determine a suitable scope to complete a PFS for the project based on
the strategic application of the aMES™ technology.
Verdant Minerals is currently undertaking a tenement rationalisation process focused on
holding essentially a very similar project area, but consolidating the exploration licences from
7 to 3 contiguous licences, therefore simplifying dealings with relevant stakeholders as well
as potentially reducing holding costs.
Page 3
Figure 1: Karinga Lakes Potash Project (KLPP) Location
ii)
New Mexico Lithium Project (NMLP, 70% interest, earning 100%)
The NMLP is based on the large central portion of the Lordsburg Playa in the Animas Valley
in SW New Mexico (Figure 2). Parkway Minerals has earned a 70% interest in the project by
funding tenement renewals and early stage exploration activities and has the right to move to
100% ownership. The project is located in a region of high heat-flow as evidenced by regional
geothermal activity and is highly prospective for lithium and potash in brines interpreted to be
present beneath the playa surface. Parkway Minerals is currently evaluating potential
opportunities to drill-test the project. During the quarter, the Company conducted a farmout
marketing initiative, to identify potential farminees. The Company received several
expressions of interest, however, is still assessing options to move the project forward,
particularly in light of COVID-19 related challenges.
Figure 2: New Mexico Lithium Project (NMLP) Location
Page 4
iii)
Dandaragan Trough Project (DTP, 100% interest)
Parkway Minerals holds 100% of the Dinner Hill Potash and Phosphate Deposit, located some
200km north of Perth in Western Australia, (Figure 3). Dinner Hill forms part of the larger
Dandaragan Trough Project (DTP), where Parkway Minerals holds approximately 130km2 of
exploration tenure. Sedimentary sequences within the trough contain glauconite, a potash
rich mica, and phosphate nodules. Parkway Minerals has been evaluating the feasibility of
producing phosphate and sulphate of potash (SOP) fertilisers and a range of valuable byproducts from the phosphate and glauconite present within the sediments of the DTP. The
Dinner Hill Project covers approximately 40km2 within the DTP. Following a detailed project
review, given the relatively high holding costs and the lack of synergies with the aMES™
technology portfolio, the Company has deemed the DTP to be non-core and has accordingly
decided to divest the project.
Figure 3: Dandaragan Trough Project (DTP) Location
Appointment of Non-Executive Director
On 10 March 2020, the Company announced that Richard Beresford, an experienced
technology commercialisation executive with extensive global experience, had been
appointed a non-executive director of the Company, effective 12 March 2020 and has also
been appointed to the Remuneration and Nomination Committee.
Richard brings over 30 years of international experience in strategic planning, business
development, M&A, operations and general management and governance experience, to his
appointment with Parkway Minerals.
Richard spent 12 years with British Gas in a number of senior roles, before joining Woodside
Petroleum in 1996 where he was general manager of business development, before being
appointed the managing director of Metasource, Woodside’s green energy subsidiary, until
2001. Richard subsequently joined CLP Power Hong Kong up until 2007 as the Head of Gas
Strategy and Development. More recently, Richard has held a number of director and
Page 5
chairman roles with ASX-listed companies including Eden Innovations and Green Rock
Energy.
Richard is currently a non-executive director of LNG Limited (ASX: LNG), the owner of the
OSMR® liquefaction technology, and was the chairman from 2010 – 2016, during which time
the company underwent significant growth, including expansion into North America, which
was underpinned by significant equity capital market support and resulted in the establishment
of a number of key investor, OEM and EPC relationships. He is also the non-executive
chairman of unlisted Bombora Wave Power Pty Ltd. Richard’s experience in navigating the
rapid growth of process technology companies, including the engagement of strategic partners
and investors will be a valuable addition to the Parkway Minerals board.
As announced on 10 March 2020, non-executive director Patrick McManus will retire from the
board on 30 April 2020.
Responding to Impacts of COVID-19.
On 24 March 2020, the Company provided details regarding the implementation of social
distancing rules and further risk mitigation strategies including the cancellation of all nonessential travel and implementation of work-from-home arrangements for all employees.
Further to these safety related measures, in light of the increasingly uncertain operating
environment, the Company has continued to implement a number of additional cost-saving
measures including:
•
Reduction in corporate overheads, including >80% reduction in office rent compared
to CY2019.
•
Leveraging previously awarded Australian Research Council grant funding (remaining
gross balance of ~$0.5 million) as well as recently applied grant funding application, to
fund majority of R&D related activity being performed at Victoria University.
•
Full participation by the board and CFO in the Parkway Minerals Salary Sacrifice Share
Plan (SSSP), which involves electing to accept 30% of remuneration by way of
issuance of Parkway Minerals shares based on the VWAP during the relevant period.
Effective commencement date 1 April 2020, with an initial duration of 3 months.
Strategic Investment – Davenport Resources (ASX: DAV)
Davenport Resources is an ASX listed junior mining company which has assembled a portfolio
of advanced potash projects in Germany, which collectively represent one of the largest
undeveloped potash project inventories in Europe, a region which is a net-importer of potash.
Davenport Resources is focused on the appraisal and potential development of the South
Harz potash field in Thuringia, Central Germany, where Davenport Resources owns 2
exploration and 3 mining licences (Figure 4). The mining licences were purchased from the
German Government in late 2017 and are perpetual, with no expenditure or royalty
commitments. The mining licences were subject to detailed drilling in the 1960’s and 80’s,
when the field was owned by the state-owned Potash Mining Corporation of East Germany.
A technical review of extensive drill hole data has enabled the reporting of significant historic
resources. The current JORC compliant inferred resources as reported by Davenport
Resources on 23 December 2019, now total approximately 5.27 billion tonnes, as outlined in
Table 1. In late December 2019 as well as on 26 February 2020, Davenport Resources
announced that recently completed technical studies yielded positive results.
Parkway Minerals owns ~21% of Davenport Resources (as of 31 March 2020) and is therefore
the largest shareholder of the company. Recent corporate activity in the potash sector has
highlighted the deep value in the sector. Given the globally significant scale of the potash
Page 6
resource delineated by Davenport Resources in an existing potash producing region, Parkway
Minerals believes there is an opportunity to create and unlock substantial value. Parkway
Minerals is in discussions with both Davenport Resources and other significant shareholders
on a range of initiatives which would potentially be value accretive for all stakeholders.
Figure 4: South Harz Project Location
LICENCE
Tonnage (Mt)
K2O (%)
Sylvinite
Carnallitite
MUHLHAUSEN-KEULA
Sylvinite
Carnallitite
NOHRA-ELENDE
Sylvinite
Carnallitite
KULLSTEDT
Hartsalz (Sylvinite + SO4)
Carnallitite
OHMGEBIRGE
Sylvinite
Carnallitite
324
253
15.6
7.5
834
296
12.1
8.2
101
1,597
14.2
9.4
333
1,205
13.0
10.1
261
64
13.9
9.8
TOTAL
5,268
10.8
EBELEBEN
Table 1: South Harz JORC Inferred Resources
Page 7
Other Items
GENERAL MEETING
On 5 March 2020, at a General Meeting of Shareholders, all resolutions put to the meeting
were passed.
ISSUANCE OF NEW SECURITIES
During the quarter, following approval at the General Meeting of Shareholders (5 March 2020),
the Company issued the following securities:
•
49,999,999 PWN unquoted $0.02 16 December 2022 options - Broker option issue
•
5,000,000 PWN unquoted $0.02 16 December 2022 options - Incentive option issue
•
42,000,000 PWN unquoted $0.02 16 December 2022 options - Director option issue
•
5,500,000 PWN unquoted $0.02 16 December 2022 options - Executive option issue
•
2,499,999 PWN unquoted $0.02 16 December 2022 options - Director SPP options
issue
•
105,583,333 PWN unquoted $0.02 16 December 2022 options - Placement
participants option issue
STRATEGIC SHAREHOLDING
Parkway Minerals owns 34,267,700 shares in Davenport Resources (ASX: DAV),
representing approximately 20.8% of the issued capital of Davenport Resources (as of 31
March 2020).
PAYMENTS TO RELATED PARTIES
As outlined in the attached Appendix 5B (section 6.1), during the quarter approximately
$123,000 in payments were made to related parties and their associates for director salaries,
consultancy fees, superannuation and other related costs.
CASH ON HAND
At 31 March 2020, the company had $2.19 million in cash reserves and approximately $1.5
million in marketable securities.
Page 8
Tenement Interests
As at 31 March 2020 Parkway Minerals held the following tenements
Tenement ID
E70/3987
E70/4137
E70/4609
E70/5102
ELRA/32206
ELRA/32207
ELRA/32208
ELRA/32209
ELRA/32210
ELRA/32211
ELRA/32212
ELA/32249
ELA/32250
ELA/32251
Name
Dinner Hill
Dandaragan
Dandaragan
Dandaragan
Location
Dandaragan
Dandaragan
Dandaragan
Dandaragan
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
Karinga Lakes
State
WA
WA
WA
WA
NT
NT
NT
NT
NT
NT
NT
NT
NT
NT
Interest
100%
100%
0% (1)
100%
15% (2)
15% (2)
15% (2)
15% (2)
15% (2)
15% (2)
15% (2)
15% (2)
15% (2)
15% (2)
(1)
E70/4609 was surrendered during the period.
(2)
15% of Karinga Lakes project acquired as part of CPC transaction. See note above under heading
“Karinga Lakes Potash Project” with respect to tenement rationalisation.
International Projects – New Mexico Lithium Project (USA)
Tenement ID
Number of
Claims
LBP 1-2, 16-29, 4360
56, 70-83, 95-110
LBP 3-15, 30-42, 5769, 84-94, 111-115,
60
129-133
LBP 111- 261
151
LBP 262-338
76
RD 1-16, 25-40, 4964, 73-80, 89-112
WP 21-32, 48-59,
70-90, 103-130
(3)
80
73
Location
State
Interest
Lordsburg
Playa
New
Mexico
70% (3)
Lordsburg
Playa
New
Mexico
70% (3)
Lordsburg
Playa
Lordsburg
Playa
Lordsburg
Playa
Lordsburg
Playa
New
Mexico
New
Mexico
New
Mexico
New
Mexico
70% (3)
70% (3)
70% (3)
70% (3)
70% of Lordsburg Playa Project acquired as part of CPC transaction, total area ~40km2.
Page 9
Activities Subsequent to Reporting Period
Full participation by the board and CFO in the Parkway Minerals Salary Sacrifice Share Plan
(SSSP), which involves electing to accept 30% of remuneration by way of Parkway Minerals
shares based on the VWAP during the relevant period. Effective commencement date 1 April
2020, with an initial duration of 3 months.
On behalf of Parkway Minerals NL,
Bahay Ozcakmak, MD
The attached Appendix 5B has been authorised for release by Bahay Ozcakmak (MD)
and Robert Van der Laan (CFO).
Additional Information
For further information contact:
Bahay Ozcakmak
Managing Director
T: +61 414 596 007
E: bahay@parkwayminerals.com.au
Page 10
About aMES™ Technology
The activated Mineral Extraction System, or aMES™ is an innovative process technology that
enables the treatment of concentrated brine solutions to recover a range of valuable minerals,
reagents and fresh water. The technology utilises a proprietary multi-staged process
incorporating novel membrane technology and is based on proprietary IP, incorporating
patents, expertise and know-how acquired over more than a decade of intense process
development initiatives.
The advantages of the aMES™ technology include:
•
improvements in mineral recovery and product quality,
•
opportunity for substantial project capex & opex savings,
•
efficient use of energy and produces pure water as a by-product, and
•
improved project footprint and environmental sustainability.
Ongoing collaboration with a number of brine project developers and operators has confirmed
there are many applications where the aMES™ technology has the potential to deliver
substantial value by applying the technology to enhance existing flowsheets, in order to
improve overall project performance.
Additional Information
www.parkwayminerals.com.au/ames-technology
Page 11
About Parkway Minerals
In October 2019, Parkway Minerals (ASX: PWN) completed a transformational transaction by acquiring
an Australian unlisted public company, Consolidated Potash Corporation (CPC). Through CPC,
Parkway Minerals acquired a minority interest in the Karinga Lakes Potash Project (KLPP) in NT
Australia, as well as a majority interest in the New Mexico Lithium Project (NMLP), in the United States.
The CPC transaction, also resulted in Parkway Minerals acquiring the innovative aMES™ technology,
which has been developed to process a range of challenging brine streams from the mining industry,
in order to recover valuable minerals, reagents as well as produce fresh water.
Given the significant market opportunities, Parkway Minerals is focused on building and leveraging the
aMES™ technology platform to improve the efficiency, sustainability and ultimately the profitability of
various brine and wastewater streams, by enabling the development of more innovative project
development concepts, particularly in the mining and energy sectors.
Strategic Investment
Parkway Minerals holds a strategic investment (34.3 million shares) in Davenport Resources (ASX:
DAV), which has successfully delineated a globally significant in-situ potash resource (in excess of 550
million tonnes of contained potash) across 4 projects, at its South Harz project in Germany. Recently
completed scoping studies have delivered excellent technical and economic results and provide
Parkway Minerals with encouragement that this investment will generate significant returns as well as
provide Parkway Minerals with the opportunity to investigate a range of value-accretive initiatives.
Our Vision:
“To transform global brine processing methods, through innovative technology,
in order to improve sustainability, and create value."
Forward-Looking Statements
This ASX Release may contain certain “forward-looking statements” which may be based on forwardlooking information that are subject to a number of known and unknown risks, uncertainties, and other
factors that may cause actual results to differ materially from those presented here. Where the Company
expresses or implies an expectation or belief as to future events or results, such expectation or belief
is expressed in good faith and believed to have a reasonable basis. Forward-looking information
includes exchange rates; proposed or projected project or transaction timelines; uncertainties and risks
associated with the advantages and/or performance of the Company’s projects and/or technologies;
uncertainties and risks regarding the estimated capital and operating costs; uncertainties and risks
regarding any envisaged timelines in relations to any results, milestones, partnerships, including but
not limited to any milestones which may require obtaining approvals from third parties.
For a more detailed discussion of such risks and other factors, see the Company’s other ASX Releases.
Readers should not place undue reliance on forward-looking information. The Company does not
undertake any obligation to release publicly any revisions to any forward-looking statement to reflect
events or circumstances after the date of this ASX Release, or to reflect the occurrence of unanticipated
events, except as may be required under applicable securities laws.
Page 12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Parkway Minerals NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
31 March 2020
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(09months)
$A’000
14
35
(193)
(509)
(d) staff costs
(139)
(327)
(e) administration and corporate costs
(292)
(628)
(a) exploration & evaluation (if expensed)
(b) development
(c) production
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
99
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(610)
(1,330)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
-
-
(b) tenements
-
-
(12)
(12)
(d) exploration & evaluation (if capitalised)
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(09months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
274
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
7
2.6
Net cash from / (used in) investing
activities
(12)
269
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
3,233
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (Equity Raising Costs)
(86)
(121)
3.10
Net cash from / (used in) financing
activities
(86)
3,112
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,900
141
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(610)
(1,330)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(12)
269
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(86)
3,112
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(09months)
$A’000
-
-
2,192
2,192
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,172
2,880
5.2
Call deposits
20
20
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,192
2,900
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
123
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (Item 1.9)
8.2
Capitalised exploration & evaluation (Item 2.1(d))
8.3
Total relevant outgoings (Item 8.1 + Item 8.2)
8.4
Cash and cash equivalents at quarter end (Item 4.6)
8.5
Unused finance facilities available at quarter end (Item 7.5)
8.6
8.7
Total available funding (Item 8.4 + Item 8.5)
Estimated quarters of funding available (Item 8.6 divided by
Item 8.3)
8.8
If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
1.
$A’000
610
610
2,192
2,192
3.59
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
2.
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
3.
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance stateme
Share your feedback
Discover