MARCH 2017 QUARTERLY REPORT
Global Highlights
•
•
Several corporate transactions in progress in fertiliser feedstock sector.
Fundamentals for agri-chemicals appear strong in medium term.
Dandaragan Trough Project (“DTP”)
•
•
Process design in progress at Kemworks.
No further drilling required to complete Preliminary Feasibility Study.
W www.parkwayminerals.com.au
E info@parkwayminerals.com.au
Lake Barlee Project
P +61 8 9479 5386
•
•
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
OTC PINK CODE
PWNNY
CORPORATE
INFORMATION
28 April 2017
353M Ordinary shares
123M Partly paid shares
17M Listed Options
5M Unlisted options
Purchase of key licence completed in period.
PWN now has coverage over 90% of lake surface.
Technology
•
PWN has agreed to sell its 97 M Lepidico shares to Lithium Australia.
Davenport Resources (26% holding)
•
•
•
Local approval for Küllstedt drilling in progress.
Data Review of Gråfentonna nearing completion.
Data review of Southern Cross Bore indicates strong copper-gold
mineralization.
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director
1
Parkway Minerals NL – Quarterly Report
March 2017
DANDARAGAN TROUGH PROJECT
Parkway Minerals NL (“PWN”,“Parkway” or “the Company”) has continued to advance the Dinner Hill
Potash and Phosphate Deposit, located some 200km north of Perth in Western Australia, (Figure 1).
Dinner Hill forms part of the larger Dandaragan Trough Project (DTP), where Parkway holds over
2,000km2 of exploration tenure. Sedimentary rocks within the trough contain glauconite, a potash rich
mica, and phosphate nodules. The objective is to produce phosphate and potash fertilisers and a range of
valuable by-products from the phosphate and glauconite present within the sediments of the Dandaragan
Trough. The Dinner Hill Project covers some 60 km2 within the DTP.
Figure 1: Location plan, Dandaragan Trough Project
2
Parkway Minerals NL – Quarterly Report
March 2017
The DTP has unique advantages of excellent connectivity to transport facilities, infrastructure and
proximity to local and regional markets. It is located within an easy drive from Perth, and is less than
200km from two major bulk export ports, Kwinana and Geraldton. It is well situated in relation to major
project infrastructure, and significant local and regional markets for its products.
Dinner Hill Prefeasibility Study (PFS)
Process design testwork is now in progress, with Florida based Kemworks Technology Inc (Kemworks).
Kemworks are phosphate process design specialists, with many years of focused phosphate process
development experience. Testwork has been delayed, by factors outside our control. Results are now
expected in the June quarter.
LAKE BARLEE PROJECT
Parkway has a number of exploration licence applications covering Lake Barlee, north-east of Southern
Cross in Western Australia. During the period PWN purchased EL 77/2347 which covers the key central
portion of the lake (Figure 2). Lake Barlee is prospective for potassium salts in the brine. A
reconnaissance trip, and planning for an exploration programme will take place in the June quarter.
3
Parkway Minerals NL – Quarterly Report
March 2017
Figure 2 Lake Barlee Project area.
DAVENPORT RESOURCES
Parkway owns 26% of Davenport Resources (DAV), which holds exploration licences in the South Harz
region of Germany (Figure 3). The South Harz region has a long history of potash mining, dating back to
the late 1890s. Extensive exploration work and R&D was carried out in the period from the 1960s to the
1980s. This confirmed that substantial potash deposits still remain in this region. An Exploration Target
for the Küllstedt licence was reported to the ASX by PWN on March 4, 2015. A drilling programme within
that Target is in the approval stage with the Thuringian Mining Authority.
Work is in progress analyzing the results from several drilling programs carried out on the Gråfentonna
licence. A report is expected from our consultants shortly.
A review of previous exploration work at the Southern Cross Bore project was completed and released to
the ASX on 28th March. This project, approximately 600km2 75 km NE of Alice Springs has recorded
significant intersections of gold and copper. Planning for geophysical surveys is in progress.
4
Parkway Minerals NL – Quarterly Report
March 2017
DAV has a programme of ongoing identification and evaluation of opportunities to advance the
company’s objectives. If a proposal advances, details would be announced in accordance with it’s
continuous disclosure obligations.
Figure 3: South Harz Project Location
5
Parkway Minerals NL – Quarterly Report
March 2017
LEPIDICO LTD (FORMERLY PLATYPUS MINERALS)
Parkway owned 97 million Lepidico (LPD) shares. On 6 February Lithium Australia (LIT) announcd a
takeover bid for LPD. It offered 1 LIT share for every 13.25 LPD shares. that ratio was a premium of 13%
to the relative share prices on that date. PWN signed a binding pre-bid agreement to accept the offer,
subject to conditions typical for this form of transaction. On 28 March 2017 PWN accepted the LIT offer.
The Independent Directors of Parkway believe that joining together of LIT and LPD would produce a
significantly stronger group, better able to exploit the opportunities to apply new technology to the
lithium supply chain. It is for that reason that Parkway accepted the offer.
CORPORATE
Parkway monitors activities and opportunities that may be relevant to the companies objectives. This
may include expanding or changing the scope of existing projects or engaging with third parties on other
projects. If a proposal advances, details would be announced in accordance with the Company’s
continuous disclosure obligations.
ANNOUNCEMENTS
The following ASX announcements were made during the quarter:
• 28-March-2017 PWN Accepts Lithium Australia Offer for Lepidico Shares
• 15-March-2017 Half Year Accounts
• 24-February-2017
s708 Notice, Appendices 3B and 3Y's
• 22-February-2017
Investor Presentation
• 22-February-2017
DKO: Sale of Tenement E77/2347
• 22-February-2017
Parkway Minerals Consolidates WA Salt Lake Project
• 09-February-2017
Securities Trading Policy
• 08-February-2017
LPD: Substantial Shareholder Notice Concerns
• 08-February-2017
Expiry of Options
• 06-February-2017
PWN Enters Agreement with LIT Regarding LPD Shareholding
• 02-February-2017
Ceasing to be a substantial holder
• 31-January-2017
Quarterly Activities and Cashflow Reports
• 20-January-2017
Becoming a substantial holder for DAV
• 19-January-2017
Davenport Resources to Commence Trading on ASX on 20 January
No announcements were made subsequent to 31 March 2017:
CASH ON HAND
At 31 March 2017, $2.137 million cash was available.
6
Parkway Minerals NL – Quarterly Report
March 2017
TENEMENT SUMMARY
The following information is provided in accordance with ASX Listing Rule 5.3.3:
Country
Tenement
Tenement
Interest held at 1
January 2017
WA
E70/3987
100%
WA
E70/3988
WA
E70/3989
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
E70/4137
E70/4138
E70/4139
E70/4471
E70/4609
E70/4687
E29/985
E29/1003
E29/1015
E57/1051
E77/2347
E77/2406
E77/2407
E77/2408
E77/2409
E77/2445
E77/2446
E77/2447
100%
100%
100%
100%
100%
100%
100%
100%
0%
Interest acquired
/ disposed of
during quarter
Tenement Interest
held at 31 March
2017
(1)
N/A
100%
(1)
N/A
100%
(1)
N/A
100%
N/A
N/A
N/A
N/A
N/A
N/A
100%
100%
100%
100%
100%
100%
Pending
Pending
Pending
Pending
100%
Pending
Pending
Pending
Pending
Pending
Pending
Pending
100%
(1) Denotes Beneficial holding of the Mineral Rights to Glauconite & Phosphate, and any by-products resulting
For further information contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Email: info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
About Parkway Minerals
Parkway Minerals (ASX: PWN) is an exploration company focused on developing large greensand deposits
in West Australia’s Perth Basin. The Company aims to define a substantial resource base and investigate
how best to recover phosphate, potash and other minerals from the Dandaragan Trough. The project is
well situated in relation to infrastructure, with close access to rail, power and gas. A successful
commercial outcome will allow the Company to become a major contributor to the potash and phosphate
markets at a time of heightened regional demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 2,000km2. Previous exploration indicates
7
Parkway Minerals NL – Quarterly Report
March 2017
glauconite sediments are widespread for more than 150km along strike and 30km in width. A prefeasibility study is in progress for stage 1, production of phosphate fertilisers.
The company owns 25% of Davenport Resources, which owns a potash exploration project in the South
Harz region of Thuringia, in Central Germany. The region has been a potash producing area for over 100
years.
8
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Parkway Minerals NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
31 March 2017
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date
(9 months)
$A’000
(182)
(715)
(d) staff costs
(78)
(335)
(e) administration and corporate costs
(137)
(538)
3
11
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
134
(394)
(1,443)
(6)
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (Equity Raising Costs)
(207)
3.10
Net cash from / (used in) financing
activities
3,098
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
(6)
3,305
2,531
488
(394)
(1,443)
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(6)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
3,098
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
+ See chapter 19 for defined terms
1 September 2016
2,137
2,137
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,137
2,531
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,137
2,531
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
78
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation Contributions.
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
87
9.5
Administration and corporate costs
150
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
+ See chapter 19 for defined terms
1 September 2016
Tenement
reference
and
location
$A’000
210
447
Nature of interest
Interest at
beginning
of quarter
Interest
at end of
quarter
E77/2347
-
0%
100%
E29/985
E29/1003
E29/1015
E57/1051
E77/2406
E77/2407
E77/2408
E77/2409
E77/2445
E77/2446
E77/2447
Applications
0%
0%
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here:
Date: 28 April 2017
(Director/Company secretary)
Print name: Patrick McManus
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity that wishes to
disclose additional information is encouraged to do so, in a note or notes included in or attached
to this report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5