ASX Announcement
8 August 2018
_____________________________________________________________________________________
PARKWAY MINERALS (ASX: PWN) ANNOUNCES COMPLETION OF
DRILLING PROGRAMME ON LAKE BARLEE
COMPANY DETAILS
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Parkway Minerals NL
Level 1, 675 Murray St.
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6872
W www.parkwayminerals.com.au
Highlights
Parkway Minerals NL (ASX: PWN) releases the results of proof of concept
drill program on its Lake Barlee Project.
Palaeochannels identified.
Potassium levels were lower than the target level
The drill program was designed to test the geology and collect brine samples from
palaeochannels identified by passive seismic surveys undertaken across the lake by
the company. (Refer ASX announcement 8 November 2017).
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
CORPORATE
INFORMATION
8 August 2018
595M Ordinary shares
123M Partly paid shares
18M Listed Options
13M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director
Nine drillholes were completed for a total of 782 metres of drilling. Three of the
seven passive seismic lines surveyed were tested (Figure 1). Drilling was completed
using Ausdrill’s Lake Walker rig, which is specially modified for drilling on salt lake
surfaces. Due to deep horizons and running sands, a number of the holes failed to
penetrate into the basement.
The drilling intersected two continuous sand aquifer units containing brine. An
upper sand aquifer approximately 60 metres below the lake surface that averaged
approximately 5 meters thick, and a basal sand aquifer sitting on the paleo surface
which was up to 23 metres thick but the majority of the drillholes failed to
penetrate through the horizon. The aquifers are confined by lake clays and sit on
a weathered granite or acid volcanic basement. In addition, the drilling intersected
a number of thinner sand units that are less continuous. In total 28 separate water
samples were collected from the programme, composite samples of the drill spoil
were also submitted for analysis.
The result of the geochemical sampling of the brine waters have been received.
The results are universally low, averaging 1619 mg/l K. This concentration of
potassium is significantly below results reported by similar salt lake potash projects
and is unlikely, in the company’s opinion, to form the basis of an economic project.
The company is completing a review prior to making a decision on the project.
Parkway Minerals NL Lake Barlee Drilling Results
August 2018
Figure 1 Lake Barlee Project Showing Drill Collars
Table 1 Drill Collar Table
Hole ID
LBAC001
LBAC002
LBAC003
LBAC004
LBAC005
LBAC006
lBAC007
LBAC008
LBAC009
Northing
6780730
6780550
6780270
6780420
6780260
6780040
6779080
6778800
6778430
Easting
751050
751050
751050
749020
749020
749020
746960
746960
746960
RL
400
400
400
400
400
400
400
400
400
Azi
0
0
0
0
0
0
0
0
0
Dip
-90
-90
-90
-90
-90
-90
-90
-90
-90
TD
99
125
111
110
102
84
99
123
119
Parkway Minerals NL Lake Barlee Drilling Results
August 2018
Table 2: Sand Aquifer Units
Hole
LBAC001
LBAC002
LBAC003
LBAC004
Upper Sand, M
From To
Thickness From
67
72
5
95
Basal Sand, M
To
Thickness
99
4
73
74
95
94
94
106
106
110
11
12
14
79
102
23
98.5
109
111
3.5
11
14
81
84
8
10
LBAC005
LBAC006
68
81
13
LBAC007
LBAC008
LBAC009
77
75
83
79
6
4
95
98
97
Interval
From
71
47
80
95
74
83
97
110
92
95
107
83
53
77
92
98
53
68
77
80
98
101
107
71
77
86
107
116
Interval
To
72
48
81
96
75
84
98
111
93
96
108
84
54
78
93
99
54
69
78
81
99
102
108
72
78
87
108
117
Comment
Hole abandoned at 99
before hitting basement
Hole abandoned at 110
before hitting basement
Hole abandoned at 102
before hitting basement
Hole
abandoned
in
swelling clays
Basement not intersected
Table 3: Water Analysis
Sample
Number
LBW001
LBW002
LBW003
LBW004
LBW005
LBW006
LBW007
LBW008
LBW009
LBW010
LBW011
LBW012
LBW013
LBW014
LBW015
LBW016
LBW017
LBW018
LBW019
LBW020
LBW021
LBW022
LBW023
LBW024
LBW025
LBW026
LBW027
LBW028
Hole ID
LBAC001
LBAC002
LBAC002
LBAC002
LBAC003
LBAC003
LBAC003
LBAC003
LBAC004
LBAC004
LBAC004
LBAC005
LBAC007
LBAC007
LBAC007
LBAC007
LBAC008
LBAC008
LBAC008
LBAC008
LBAC008
LBAC008
LBAC008
LBAC009
LBAC009
LBAC009
LBAC009
LBAC009
K
mg/l
1665
1610
1655
1685
1735
1620
1630
1740
1535
1660
1650
1635
1730
1530
1565
1605
1775
1775
1730
1695
1805
1700
1710
1035
1595
937
1605
1725
Mg
mg/l
5120
4790
5020
5230
5070
4940
5000
5210
4700
4950
4910
4880
4840
4690
4850
4920
4760
4900
4910
5160
5160
5120
5210
3320
4710
2910
4710
4880
Cl
mg/l
163000
151000
148000
157000
162000
122000
150000
165000
142000
148000
163000
149000
153000
150000
150000
157000
156000
153000
159000
164000
136000
165000
166000
97800
154000
88500
150000
156000
TDS
mg/l
254000
223000
253000
247000
281000
254000
247000
298000
249000
271000
268000
268000
281000
257000
254000
273000
272000
268000
269000
272000
255000
273000
279000
145000
185000
135000
270000
266000
SO4
mg/l
11900
11500
10400
11200
11700
8770
10900
11700
10300
11100
12100
11100
11400
11200
11400
11700
11200
10900
11800
12100
10100
12400
12400
6900
11400
6170
11000
11400
Parkway Minerals NL Lake Barlee Drilling Results
August 2018
For further information contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Email: info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
Peter Nesveda
Investor Relations
+61 (0) 412 357 375
peter.nesveda@parkwayminerals.com.au
About Parkway Minerals
Parkway Minerals (ASX: PWN) is a company focused on developing fertiliser feedstock projects. The
Company holds 1,900km2 of exploration licenses and applications over Lake Barlee, where it is exploring a
sulphate of potash project from the brines in the lake, north of Southern Cross in Western Australia.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 1,050km2 in the greensand deposits of the
Dandaragan Trough, in Western Australia’s Perth Basin. The area is prospective for both phosphate and
potash. Previous exploration indicates glauconite sediments are widespread for more than 150km along
strike and 30km in width. The project is well situated in relation to infrastructure, with close access to rail,
power and gas. A successful commercial outcome will allow the Company to become a major contributor to
the potash and phosphate markets at a time of heightened regional demand.
The Company owns 44M shares (32%) of Davenport Resources, which owns a potash exploration project in
the South Harz region of Thuringia, in Central Germany. The region has been a potash producing area for
over 100 years.
Competent Person Statement
The information in this report that relates to interpretation of geological and geophysical data to define
target areas was compiled by Mr Trevor Haig. Mr. Haig is a consultant of Groundwater Development
Services (GDS) Pty Ltd. GDS is employed as a consultant to Parkway Minerals Limited. Mr Haig has sufficient
experience which is relevant to the types of aquifers under consideration to qualify as a Competent Person
as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (“JORC2012”). Mr Haig consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
Attachments
Appendix 1 JORC Tables
Parkway Minerals NL Lake Barlee Drilling Results
August 2018
Appendix 1 JORC Tables
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples should not be taken
as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Drilling
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
techniques
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
Drill sample Method of recording and assessing core and chip sample recoveries
recovery
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Sampling
techniques
Commentary
Brine and mineral sampling was completed via Air core (AC) drilling
technique
Air Core drilling was competed by Ausdrill using a specialized
Lakewalker drill rig. Holes were drilled to blade refusal, hole diameter
was 85mm
Mineral samples were collected on a metre basis via a cyclone fitted
on the rig. Intervals were no samples were recovered due to ground
conditions were recorded.
Water samples were collected in a 9 litre bucket from intervals within
the hole where sand aquifers were intersected. Brine samples were
collected by air lifting the water sample using the rig compressor.
Drilling was completed with care, the cyclone was cleaned regularly.
The majority of the solid samples were wet clays, Due to the
unconsolidated nature of the sand, sample recovery in these units was
variable. The containers collecting water samples were cleaned
regularly. Due to intermittent flow it was not possible to purge the
lines before taking water samples.
Parkway Minerals NL Lake Barlee Drilling Results
Criteria
JORC Code explanation
August 2018
Commentary
Brine samples were only collected through sand aquifer intervals. For
this preliminary work the relationship between the recovery of the solid
sample from the hole and brine sample is not considered relevant
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Sub If core, whether cut or sawn and whether quarter, half or all core taken.
sampling
If non-core, whether riffled, tube sampled, rotary split, etc and whether
techniques
sampled wet or dry.
and sample For all sample types, the nature, quality and appropriateness of the
preparation
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Logging
Qualitative lithological logging using a standard logging code was
completed with major and minor lithological units described.
Representative sample for each metre drilled was collected in a plastic
chip tray for later reference.
An estimate of the flow rate for each aquifer bed base made by
recording the time taken to fill a 9 litre bucket
No core drilling.
4 metre composite samples of drill spoil were collected. Due to the wet
and sticky nature of the clay material, standard sampling protocols
could not be followed. As the chemistry of the solid samples was
considered secondary to the brine sampling, the sample quality was
considered adequate.
Brine water samples were collected with a clean 9 litre bucket from
the rig cyclone. The sample was placed in a 250ml and 50 ml sterile
plastic contained provided by the analytical laboratory.
The collected samples was stored in an chilled esky on the rig and
transported daily to a refrigerator at the camp. Due to the remote
location, the samples were collected over the course of the program and
submitted to the laboratory at the end of the programme.
A TPS-WP-88 portable conductivity and Eh meter was used to record
electricial conductivity, Ph and temperature of each water sample at the
drill site.
No blank or duplicate samples were collected on site
The size of the water sample collected is considered sufficient for a
representative sample.
Quality
of The nature, quality and appropriateness of the assaying and laboratory All samples were submitted to ALS Laboratories for analysis
assay
data
procedures used and whether the technique is considered partial or Brine waters were analysed for major cations ( K, Ca,Mg Na) and
and
total.
anions Cl,sulphate an alakalinity ) as well as Total dissolved salts
laboratory
(TDS) and PH. As well as a multi-element suite (dissolved metals)
For geophysical tools, spectrometers, handheld XRF instruments, etc,
tests
the parameters used in determining the analysis including instrument
using technique MSI 4-REE and MSI14-ANPH
make and model, reading times, calibrations factors applied and their Solids were analysed for a multi-element suit of elements using method
derivation, etc.
ME-MS41L and MS41L-REE
Nature of quality control procedures adopted (eg standards, blanks, Standard laboratory QA/QC protocols were used by ALS for the
Parkway Minerals NL Lake Barlee Drilling Results
Criteria
JORC Code explanation
Verification
of sampling
and assaying
Location of
data points
Sample
security
Audits
reviews
or
Commentary
duplicates, external laboratory checks) and whether acceptable levels
analysis
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or Due to the preliminary nature of the program the company has not
alternative company personnel.
sought independent verification of the results
The use of twinned holes.
No twinned holes were drilled
Documentation of primary data, data entry procedures, data Sample data was collected in the field and recorded by hand in standard
verification, data storage (physical and electronic) protocols.
company format. The site geologist transferred the hard copy data to a
spreadsheet on site and it was emailed to the company offices.
Discuss any adjustment to assay data.
The sample data and laboratory results were loaded into a Access data
base and validated against the hard copy data.
Accuracy and quality of surveys used to locate drill holes (collar and The collar coordinates for each drillhole were recorded by hand held
down-hole surveys), trenches, mine workings and other locations used
GPS
in Mineral Resource estimation.
The datum was GDA 94 zone 50.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing Data spacing for reporting of Exploration Results.
and
Whether the data spacing and distribution is sufficient to establish the
distribution
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Orientation
of data in
relation
to
geological
structure
August 2018
The drill lines were spaced approximately 2000m apart along line
previously surveyed as part of the passive seismic survey.
Holes were spaced approximately 400m apart along the lines
It was not anticipated that any samples collected from the program
would be used to calculate geological resources.
By the nature of the sample, the water samples collected were
composite samples. 4 metre composite samples were collected from
the drill spoil as well.
Whether the orientation of sampling achieves unbiased sampling of The drill lines were orientated perpendicular to the long axis of the
possible structures and the extent to which this is known, considering
palaeochannels, as defined by the passive seismic survey.
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
All samples were collected and stored on site. At the completion of the
program all the samples were transported to the laboratory sample
receival centre in Perth by company contracted personnel.
The results of any audits or reviews of sampling techniques and data. No audits or data reviews were completed.
Parkway Minerals NL Lake Barlee Drilling Results
August 2018
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
Type, reference name/number, location and ownership including
tenement and
agreements or material issues with third parties such as joint ventures,
land tenure
partnerships, overriding royalties, native title interests, historical sites,
status
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a license to operate in the area.
Exploration
Acknowledgment and appraisal of exploration by other parties.
done by other
parties
Geology
Drill
hole
Information
Data
aggregation
methods
Commentary
Drilling was completed on granted tenement E77/1051
The tenements is held 100% by Parkway Minerals NL
The Wutha People are the traditional owners over the north-eastern part
of the project area (approximately 10% of the project area). The
remainder of the project area is currently not under native title claim.
Limited work has been completed on the project area for potash in the
past.
Jervios Mining Limited and Soraway Development Pty Ltd have both
in recent times held tenure over parts of the Lake Barlee Project. Work
completed by both companies was restricted to processing government
geophysical data sets, shallow auger drilling and chemical analysis and
taking hand held scintillator readings
Deposit type, geological setting and style of mineralisation.
The principal commodity being explored for is potassium within arid
salt lakes. The principal deposit tested by this program are
aquipotassium rich brines within sand aquifers that were developed on
the palaeosurface and within the lake profile.
A summary of all information material to the understanding of the The location of all drill collars are reported in table 1 in the body of
exploration results including a tabulation of the following information
this report
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Brine water results for K, Mg, Na, Cl, SO4 are reported in Table 3 in
In reporting Exploration Results, weighting averaging techniques,
the body for the text. The remaining elements reported by the
maximum and/or minimum grade truncations (eg cutting of high
laboratory are not regarded as significant to the principal commodity
grades) and cut-off grades are usually Material and should be stated.
being explored for and have not been released. The analytical results
Where aggregate intercepts incorporate short lengths of high grade
of the lake sediment samples have not been reported as they are not
results and longer lengths of low grade results, the procedure used for
considered relevant.
such aggregation should be stated and some typical examples of such
Parkway Minerals NL Lake Barlee Drilling Results
Criteria
JORC Code explanation
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle
is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
August 2018
Commentary
The brine samples collected through intervals where the rig geologist
or driller observed water flows or sand intervals were recorded. No
metal equivalent results are reported
Brine deposits are located within tabular sand bodies that are in part
controlled by the topography of the basin floor.
Vertical drillholes are considered the most appropriate method to
determine the thickness of the aquifer sands
Appropriate plans and maps are provided in the body of the report
The geochemistry of the principal elements of SOP including K, Mg,
Cl, Na, SO4 have been reported.
No other exploration data is currently being collected by the company
The drill program was a proof of concept drill program to confirm the
presence of palaeochannel sands and determine the concentration of
potassium in the brine waters. The results of the drill program
confirmed the presence of aquifer sands but the concentration of K was
considered low and unlikely to develop into an economic deposit. The
company intend to review its options on the overall project.