Significant Upgrade to Dinner Hill Phosphate Resource
Released
Released
Announcement PDF
ASX Announcement
20 March 2014
_____________________________________________________________________________________
COMPANY DETAILS
POTASH WEST ACHIEVES SIGNIFICANT UPGRADE TO DINNER HILL
PHOSPHATE RESOURCE
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
W www.potashwest.com.au
E info@potashwest.com.au
HIGHLIGHTS:
Dinner Hill Phosphate Deposit
o Phosphate Indicated Mineral Resource increased to
120Mt @ 2.8% P2O5, 3.1% K2O, and 8.2% CaO
o Metallurgical breakthrough brings major cost benefits
o Resource tonnes increased by 33%
o Projected mine life of 20 plus years
Potash West (the Company) (ASX: PWN) is pleased to announce the results of a
re-estimation of the Dinner Hill Phosphate resource following the recent
significant improvements to the metallurgical flowsheet. The Dinner Hill
project is located 175km north of Perth in Western Australia, within the
Company’s world-class Dandaragan Trough project area (Figure 2).
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
OTC PINK
PWNNY
CORPORATE
INFORMATION
(20 March 2014)
113M Ordinary shares
4M Unlisted Options
8M Listed Options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
George Sakalidis
(Non-Executive Director)
Gary Johnson
(Non-Executive Director)
Background
Nodular phosphate mineralisation at Dinner Hill occurs within a chalk unit, the
Gingin Chalk and in upper and lower greensand units, the Poison Hill
Greensand and the Molecap Greensand.
In September 2013 Potash West announced the results of the initial Scoping
Study to produce single superphosphate on its Dandaragan Trough Project.
However, initial testing and modeling showed that without selectively mining
and removing the chalk from the process stream, commodity grade single
superphosphate could not be produced due to the high calcite content in the
phosphate concentrate. Based on this data, the calcite rich chalk layer was
rejected at the mine.
With the chalk excluded from the geological model, the Dinner Hill deposit was
estimated to contain an Indicated Mineral Resource of 90Mt at 2.65% P2O5
above a 1.85% lower cut-off grade of 1.85% P2O5 (ASX: 23 September 2013).
Potash West NL – Resource Update
March 2014
On February 12, 2014, the Company announced that a significant breakthrough in the metallurgical
testwork program demonstrated the potential to recover phosphate from the chalk by implementing a
selective flotation regime. Based on these results work progressed to revise the resource. The Dinner Hill
Phosphate Deposit is now estimated to contain an Indicated Mineral Resource of 120Mt at 2.8% P2O5,
3.1% K2O, and 8.2% CaO above a lower cut-off grade of 2.15% P2O5 (Table 1).
Overview
Patrick McManus, the Managing Director of Potash West has commented: “The metallurgical
breakthrough we have made with regard to removing the chalk through the processing stream is very
significant in that it not only increases the size of the resource and grade of the phosphate at Dinner Hill,
it potentially can lead to major mining cost savings through the creation of a simpler mining process, a
lower strip ratio and an increased mine life.”
“We look forward to further defining this breakthrough and ascertaining its potential benefits across our
very large Dandaragan Project area.”
The Dinner Hill potash resource occurs over an area of 10.3 square kilometres. Phosphate mineralisation
occurs throughout the area of the potash resource, but consistent grades averaging over 3% P2O5 are
restricted to the northern part of the area.
Drill-hole data from Potash West was used to construct the Ore Body Model (OBM) and to estimate the
resource. The data comprised drill logs and analyses for 87 air-core drill-holes totaling 3,516m and 93 SG
samples taken from four PQ diamond holes drilled in August 2012. Drill-hole locations are shown in
Figure 3.
The phosphate geological model was constrained by a 1% P2O5 envelope within wire framed subhorizontal sedimentary formations. It includes the Poison Hill Greensand, the Gingin Chalk and the
Molecap Greensand.
The OBM block grades were estimated by geostatistical interpolation using the inverse distance squared
method. Parent block sizes were 100m x 100m x 1m vertical. The Dinner Hill Phosphate Deposit is now
estimated to contain an Indicated Mineral Resource of 120Mt at 2.8% P2O5, 3.1% K2O, and 8.2% CaO
above a lower cut-off grade of 2.15% P2O5 (Table 1).
Mineral Resource Estimate
Geology
The project tenements cover two virtually horizontal greensand formations within the Cretaceous
Coolyena Group: the Poison Hill Greensand, and the Molecap Greensand. Over most of the area of the
deposit they are separated by the Gingin Chalk. An average thickness of about 11m of surficial, mostly
sandy, cover overlies the greensand units. The greensands contain significant amounts of potash within
the mineral glauconite and also significant phosphate contents. Figure 4 is an east-west cross-section
through the deposit displaying phosphate intersections and geological units. Figure 5 is the same section
showing the distribution of block grades.
Potash West NL – Resource Update
March 2014
Mineralisation
Within the area of Potash West’s Dinner Hill drilling the lower portions of the Poison Hill Greensand, the
Gingin Chalk, and the Molecap Greensand consistently contain more than 1% P2O5 (see 1% envelope in
Figure 4), with the grades being higher and more consistent in the north of the area. The distribution of
phosphatic drill-hole intervals averaging >2.2% P2O5 along 6,638,000N in the northern portion is shown on
Figure 4.
Exploration
An aircore drilling programme of 83 vertical NQ holes for 3,215m was carried out in June 2012 over a
10km2 area immediately to the east of Wathingarra Rd (Figure 3). The drilling was undertaken to enable
the estimation of Mineral Resources within the greensand units. The programme was based on a 400m
by 400m grid, with a small area of infill drilling on 200m x 200m spacing.
A total of 2,262 samples (1m splits) were submitted for assay to Genalysis from this drilling. Two drilling
contractors were used during this programme:
• Bostech Drilling Australia completed 32 holes for 1288m, using a Bostech DrillBoss 200 truckmounted aircore rig with a rig-mounted cyclone and rotary splitter;
• Easternwell Minerals completed 51 holes for 1927m, using a Rotomec R50 truck-mounted aircore
rig.
A diamond core programme of four holes for 148m was carried out during August 2012. The programme
was primarily to obtain core samples for bulk density determinations of the greensand units.
The holes, PWDD001 to 004, were drilled close to June 2012 aircore holes The drill contractor was
MacroDrill Pty Ltd, which used a G&K 850 rig and PQ3 coring to recover core with nominal 83mm
diameter.
Sampling
Sampling and logging was supervised at all times by experienced geological personnel. Aircore drill
samples of between 3 and 4kg were collected from each meter of drill advance using either a scoop
sample or a rig mounted rotary splitter.
Samples preparation was at Genalysis Laboratory Services Pty Ltd facility in Maddington, using their
method FB1, a Phosphate Major Element Suite. Analyses were reported for K2O, P2O5, Al2O3, SiO2, Na2O,
MgO, CaO, TiO2, MnO, Cr2O3, Fe2O3, SO3, and LOI.
Quality Control
Duplicate field splits were taken at the rate of 1 in 18 samples. Certified reference materials were
inserted into the sample run at the same frequency. CRM has reviewed the results and is of the opinion
that the sampling process and laboratory precision are robust.
Density
A total of 75.1m of core was collected from the lower portions of the four holes and 93 samples were
submitted to for density determinations. The core samples selected for density determination,
approximately 15cm in length were wrapped in glad-wrap. The remaining core was inserted into a
plastic sleeves for transport and storage for possible metallurgical test-work. The density determinations
were carried out by Metallurgy Labs, Welshpool
Survey Control
Drill-hole collars were located using hand held GPS units.
appropriate for the style of mineralisation.
The degree of accuracy is considered
Potash West NL – Resource Update
March 2014
Estimate Techniques
Nodular phosphate occurs in the Poison Hill Greensand, Gingin Chalk and the Molecap Greensand. A 1%
P2O5 lower cutoff wireframe was used to constrain mineralisation.
Four lithology wireframes were created:
• Poison Hill Greensand:
• Gingin Chalk:
• Molecap Greensand:
• Phosphate Nodule Horizon occurring at the base of the Molecap.
Grade population studies supported the opinion that no upper cuts are necessary. Ore block dimensions
were 100m EW, 100m NS and 1m vertical. Search criteria were based on ranges and isotropy defined by
variography. Tonnage factors were allocated to blocks based on lithology using results established from
the core program.
Metallurgical Testwork
Metallurgical testwork was undertaken by Strategic Metallurgy Pty Ltd and formed the basis for the
Dinner Hill Phosphate Scoping Study.
The process package consists of beneficiation studies involving screening, magnetic separation and
flotation. The screening tests have been completed on samples from the phosphate resource with results
indicating a 63% P2O5 recovery to the coarse fraction at a grade of 11% P2O5 and final concentrate grades
in excess of 30% P2O5 after processing through a combination of screening, magnetic separation and
flotation.
Recent testwork, focusing on the chalk zone, has demonstrated the potential to recover phosphate from
the chalk by implementing a selective flotation regime. The results have shown that an overall phosphate
recovery of 58.1% can be expected when producing commodity grade SSP from processing the chalk
containing ore at Dinner Hill. The recovery has reduced compared to that in the Scoping Study (61.2%) as
a result of some phosphate reporting to the calcite concentrate.
Although, the recovery is slightly lower than previously reported, the ability to process the phosphate –
bearing chalk is expected to economically outweigh the small reduction in recovery. Processing the chalk
allows for simpler mining, a lower mining strip ratio and longer mine life to that proposed in the Scoping
Study.
Potash West NL – Resource Update
Lower Cut-off
Grade
(% P2O5)
3.25
3.00
2.75
2.50
2.25
2.20
2.15
2.10
2.05
2.00
1.75
1.50
1.25
1.00
0.00
March 2014
Million
Tonnes
Grade
(% P2O5)
Grade
(% K 2O)
Grade
(% CaO)
21
35
54
77
106
113
120
128
136
143
184
222
246
257
258
3.65
3.44
3.24
3.05
2.87
2.83
2.79
2.75
2.71
2.67
2.49
2.35
2.25
2.21
2.20
3.30
3.23
3.23
3.21
3.14
3.12
3.10
3.09
3.07
3.05
2.97
2.90
2.91
2.95
2.96
8.12
8.15
8.09
8.04
8.11
8.15
8.17
8.20
8.24
8.30
8.48
8.56
8.45
8.27
8.24
Table 1: Dinner Hill Phosphate resource at various lower cutoff grades
Note: Figures in the above table have been rounded appropriately in accordance with the Australian JORC
code 2012 guidance on mineral resource reporting
Cut-off grade -Tonnage Curve
300,000,000
250,000,000
200,000,000
Tonnes 150,000,000
100,000,000
50,000,000
0
0.5
1
1.5
2
2.5
3
Cut-off grade % P2O5
Figure 1: Dinner Hill Phosphate resource grade tonnage curve
3.5
Potash West NL – Resource Update
March 2014
For further information contact:
Media:
Potash West NL
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
info@potashwest.com.au
Web: www.potashwest.com.au
Professional Public Relations
Colin Hay
Tel: +61 (08) 9388 0944
Competent Persons’ Statements:
The information in this report that relates to the estimation of the Mineral Resources is based on and fairly
represents information and supporting documentation prepared by J.J.G. Doepel, who is a member of the
Australasian Institute of Mining and Metallurgy. Mr. Doepel, Principal Geologist of the independent consultancy
Continental Resource Management Pty Ltd, has sufficient experience relevant to the style of mineralisation and type
of deposit under consideration. He is qualified as a Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. This report is issued
with Mr. Doepel’s consent as to the form and context in which the Mineral Resource appears.
The metallurgical information in this report is based on and fairly represents information and supporting
documentation compiled by Gary Johnson, who is a Member of the Australasian Institute of Mining and Metallurgy.
Mr. Johnson has sufficient experience relevant to the activity being undertaken to qualify as a Competent Person as
defined in the 20012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves”. Mr. Johnson is a Non- executive Director of Potash West and Managing Director of Strategic
Metallurgy Pty Ltd. This report is issued with Mr. Johnson’s consent as to the form and context in which the results
appear.
About Potash West
Potash West (ASX:PWN) is an exploration company focused on developing potassium-rich glauconite deposits in West Australia’s
Perth Basin. The Company aims to define a substantial resource base and investigate how best to recover phosphate and potash
from the mineral. The project is well situated in relation to infrastructure, with close access to rail, power and gas. A successful
commercial outcome will allow the Company to become a major contributor to the fertilizer market at a time of heightened
demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with exploration licenses and
2
applications covering an area of more than 2,000km . Previous exploration indicates glauconite sediments are widespread for
more than 150km along strike and 30km in width
Potash West NL – Resource Update
March 2014
Figure 2: Dandaragan Project location plan
Potash West NL – Resource Update
Figure 3: Plan of aircore drill-holes at Dinner Hill Deposit
March 2014
Potash West NL – Resource Update
Figure 4: Dinner Hill Deposit – Cross-section 663 8000N
Figure 5: Dinner Hill Deposit OBM – Cross-section 663 8000N
(P2O5 Grade: 1%-2.15% blue; 2.15 to 2.8% green; >2.8% red)
March 2014
Potash West NL – Resource Update
APPENDIX 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
• Air-core drilling was used to obtain 1m samples from target
horizons;
• 3kg sub-samples were split by rotary splitter or by scoop sampling.
Sub-sample size 3 to 4kg.
Drilling
techniques
• Vertical NQ Air-core
Drill sample
recovery
• Clay content of moist greensands ensured total recovery and
retention of all size fractions;
• Holes were conditioned at completion and cyclone opened and
cleaned before next hole drilled
Logging
• All intervals geologically logged directly into a field computer using
a database designed to capture relevant data including, oxidation,
grainsize, rounding, sorting, mineralisation, hardness, colour and
stratigraphic unit. All logging sample layouts are photographed and
chip trays stored for future reference.
Sub-sampling
techniques and
sample
preparation
• Duplicate field splits at a 1:18 ratio returned R2 correlation
coefficient of 0.96 for P2O5 indicating robustness of sampling
process;
• Sample preparation by Genalysis Laboratory Services Pty Ltd via
drying and total pulverisation
Quality of assay
data and
laboratory tests
• Analysis by Genalysis Laboratory Services Pty Ltd by Phosphate
Major Element Suite FB1 method (XRF after lithium borate fusion);
• Two alternate phosphate standards were submitted with samples at
a 1:18 ratio. For the P2O5 analyses the respective means of the
analytical results of the standards were 9.74% and 4.94% as
against the nominal standard means of 9.72% and 4.94%.
Verification of
sampling and
assaying
• Sampling and logging verified by site visits by Exploration Manager
and Independent Consultant. Logging checked against major
element assays and sample photography;
• Assay entry by digital capture of laboratory files, with later
verification of significant intervals against original files.
Location of data
points
• Holes located by GPS;
• Grid MGA_GDA94, Zone 50;
• Elevation data is based on a topographic contour set produced from
SRTM imagery at 5m vertical resolution.
Data spacing
and distribution
• 1m samples collected and analysed throughout mineralized
horizons;
• Geological continuity across deposit;
o
o
• Grade continuity over 1100m in 20 /300 orientation and 750m in
o
o
110 /290 orientation. As the holes were drilled on 400m spacing
the geological and grade continuity is appropriate for the estimation
procedure and the resource classification.
Orientation of
data in relation
to geological
• Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thickness equivalent to true thickness.
March 2014
Potash West NL – Resource Update
Criteria
Commentary
structure
Sample security
• Samples transported from site to laboratory by Potash West staff.
Audits or
reviews
• Sample techniques, logs, and data reviewed positively by
independent consultant geologist.
Section 2 Reporting of Exploration Results
Criteria
Commentary
Mineral
tenement and
land tenure
status
• The deposit is within E70/3987 held by Richmond Resources Pty
Ltd. A deed is place between Richmond Resources and Potash
West, whereby Potash West holds the rights to the glauconite and
phosphate minerals and to any by-products produced processing
these minerals.
• The tenement was granted on 26/07/2011 for a period of five years.
The required expenditure has been met for the first two years.
• The deposit is beneath farm land owned by Roseville Nominees,
with whom compensation agreements have been signed, with the
mineral sub-surface rights subsequently being granted both above
and below 30m below surface.
Exploration
done by other
parties
•
No exploration work was carried out in the area of the deposit
prior to that by Potash West.
Geology
• The phosphate is present as fluorapatite nodules and grains
concentrated within particular horizons of horizontal greensand and
chalk formations.
Drill hole
Information
• See Appendix 2.
Section 3 Estimation and Reporting of Mineral Resources
Criteria
Commentary
Database
integrity
• Assay data copied digitally from laboratory files; significant
intersections checked; Micromine drill-hole verification performed.
Site visits
• Competent person visited site during drilling programmes in June
and August 2012.
Geological
interpretation
• High degree of confidence in geological interpretation as
stratigraphy is both visually and chemically distinct and continuous.
Dimensions
• Resource has north-south length of 1200m and east-west length of
2850m. Minimum depth is 5m and maximum depth is 50m with
majority of resource between 20m and 40m below surface;
• Mineralisation is closed to west by topography and tenure; open to
north and to east; and of low grade to south.
Estimation and
modelling
techniques
• Estimation of P2O5 ore block grades by IDS within 1% P2O5
wireframe using Micromine software;
• Block size 100m x 100m x 1m vertical (sample spacing 400m x
400m x 1m);
o
o
o
o
• Search criteria 1100m to 20 ; plunge 0 ; 650m to 110 ; dip 0.7 to
March 2014
Potash West NL – Resource Update
Criteria
Commentary
o
•
•
•
•
110 ; and 2.5m vertical;
Geological boundaries checked against grade shell;
Previous report of same estimate using lower block cut of 1.85%
P2O5. No previous estimates or mine production records carried out;
No upper cuts as no outlying values;
OBM grades validated by comparison with assay values.
Moisture
• Tonnages estimated on dry basis.
Cut-off
parameters
• Estimate initially reported above a range of grades. Final report
grade of above 2.15% P2O5 selected on basis of on-going Potash
West studies;
Mining factors or
assumptions
• Topsoil and overburden to be mined by scrapers and mineralisation
to be mined by bulldozer feeding in-pit slurry unit.
Metallurgical
factors or
assumptions
• The processing route is conventional, consisting of wet scrubbing,
screening, desliming, magnetic separation, flotation, and reaction
with sulphuric acid to produce single superphosphate.
Environmental
factors or
assumptions
• Waste and de-watered flotation tailings and slimes to be returned to
mine-void and covered with stored topsoil.
Bulk density
• Density determinations carried out on 93 PQ core samples by
Metallurgy Pty Ltd and reported as dry densities;
• Poison Hill Greensand: 12 samples, median SG 1.45, mean SG
1.55, SG of 1.50 used;
• Gingin Chalk: 7 samples, median SG 1.53, mean SG 1.50, SG of
1.50 used;
• Molecap Greensand: 68 samples, median SG 1.64, mean SG 1.64,
SG of 1.63 used;
• Nodule horizon: 6 samples, median SG 1.81, mean SG 1.80, SG of
1.80 used.
Classification
• Classified as Indicated Resource as it is the Competent Person’s
view that the drill-holes from which resource is estimated clearly
define both geological and grade continuity throughout the
resource; and that the density data adequately reflects that of the
deposit.
• The relative accuracy of the Mineral Resource estimate is reflected
Discussion of
in the reporting of the Mineral Resource as per the guidelines of the
relative accuracy
2012 JORC Code.
/ confidence
March 2014
Potash West NL – Resource Update
March 2014
APPENDIX 2 –DRILL-HOLE DETAILS
The table below details the air-core drill-holes used for the resource estimate. All holes were drilled
vertically.
Hole ID
PWAC034
PWAC035
PWAC036
PWAC037
PWAC209
PWAC210
PWAC211
PWAC212
PWAC213
PWAC214
PWAC215
PWAC216
PWAC217
PWAC218
PWAC219
PWAC220
PWAC221
PWAC222
PWAC223
PWAC224
PWAC225
PWAC226
PWAC227
PWAC228
PWAC229
PWAC230
PWAC231
PWAC232
PWAC233
PWAC234
PWAC235
PWAC236
PWAC237
PWAC238
PWAC239
PWAC240
PWAC241
PWAC242
PWAC243
PWAC244
PWAC245
E MGA Z50
(GDA 94)
368142
368148
368128
368139
368555
369363
370149
368559
369351
370154
370164
369368
368554
368554
369359
370151
368952
368538
369344
369758
370156
370572
370554
369758
368945
368167
368357
368543
368919
369369
369757
370166
370558
370556
369749
368957
368352
368154
368351
368550
368963
N MGA Z50
(GDA 94)
6637532
6636740
6636050
6635359
6636394
6636400
6636446
6635603
6635597
6635604
6637206
6637194
6637201
6638002
6637998
6638003
6638403
6638399
6638407
6638400
6638399
6638404
6638000
6638000
6637995
6637998
6637800
6637610
6637620
6637603
6637601
6637605
6637603
6637197
6637200
6637231
6637398
6637198
6636997
6636801
6636798
RL
(m)
352
362
359
353
375
367
375
365
352
359
358
383
376
348
368
361
356
338
361
365
362
366
360
363
357
340
351
364
377
370
365
361
360
350
372
391
365
357
367
375
386
Depth
(m)
80
75
78
68
48
45
55
48
39
48
48
53
45
21
43
45
21
15
39
45
39
45
48
39
30
21
12
28
45
45
42
39
44
45
48
60
24
15
33
45
60
Potash West NL – Resource Update
Hole ID
PWAC246
PWAC247
PWAC248
PWAC249
PWAC250
PWAC251
PWAC252
PWAC253
PWAC254
PWAC255
PWAC256
PWAC257
PWAC258
PWAC259
PWAC260
PWAC261
PWAC262
PWAC263
PWAC264
PWAC265
PWAC266
PWAC267
PWAC268
PWAC269
PWAC270
PWAC271
PWAC272
PWAC273
PWAC274
PWAC275
PWAC276
PWAC277
PWAC278
PWAC279
PWAC280
PWAC281
PWAC282
PWAC283
PWAC284
PWAC285
PWAC286
PWAC287
PWAC288
PWAC289
PWAC290
PWAC291
E MGA Z50
(GDA 94)
369345
369754
370158
370556
370560
369754
368956
368752
368154
368363
368352
368159
368351
368558
368355
368553
368957
369356
369755
370154
370553
370554
369757
368953
368353
368155
368357
368160
368556
368958
369361
369722
370156
370554
369356
368955
368554
368159
370755
370758
370753
370756
370753
370753
370741
370740
March 2014
N MGA Z50
(GDA 94)
6636808
6636799
6636798
6636800
6636401
6636397
6636405
6636402
6636402
6636598
6636799
6637000
6637197
6636997
6636202
6636003
6636002
6635996
6635999
6636002
6636000
6635603
6635600
6635599
6635797
6635604
6635388
6635209
6635200
6635201
6635201
6635176
6635203
6635200
6634799
6634802
6634799
6634794
6635402
6635804
6636195
6636601
6637000
6637402
6637807
6638203
RL
(m)
380
374
365
355
362
377
370
372
366
370
369
361
371
377
371
367
365
360
363
363
360
352
351
364
357
354
369
347
370
365
354
343
345
354
351
355
356
344
354
357
356
357
348
354
357
358
Depth
(m)
54
56
48
39
57
60
35
45
28
36
29
24
27
42
28
35
36
39
42
51
48
48
36
36
21
15
35
15
37
39
36
30
36
48
36
30
27
9
51
51
48
48
36
42
42
39
Share your feedback
Discover