Exploration Target for Dambadgee Prospect, Dandaragan Trough
Released
Released
Announcement PDF
ASX Announcement
7 January 2019
_________________________________________________________________________________
COMPANY DETAILS
PARKWAY MINERALS ANNOUNCES EXPLORATION TARGET FOR DAMBADGEE
PROSPECT WITHIN DANDARAGAN TROUGH PROJECT
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Parkway Minerals NL
Level 1, 675 Murray St.
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6872
W www.parkwayminerals.com.au
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
CORPORATE
INFORMATION
7 January 2019
595M Ordinary shares
123M Partly paid shares
68M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Natalia Streltsova
(Non-Executive Director
HIGHLIGHTS:
Exploration Target estimated at Dambadgee
Complements Dinner Hill JORC Indicated Resource of 630 Million
tonnes at 4.4% K2O and 1.9% P2O5 (Note 1)
Dambadgee and Dinner Hill tenure to be converted to Retention
Licences
(Note 1 refer ASX release 26 September 2017)
Parkway Minerals NL (“Parkway” or the “Company”) is pleased to inform
shareholders of the upgrade of the Exploration Target for the Dambadgee
Prospect and the results of a recent review of the company’s Dandaragan
Trough Project.
The Dambadgee Prospect is located approximately 40 km south of the
company flagship Dinner Hill Deposit and 8 km southeast of the Dandaragan
Township (Figure 1).
Exploration Target Statement
The potash mineralisation within Parkway’s Dambadgee Prospect is
reported as being within an Exploration Target of between 6 billion tonnes
and 8 billion tonnes at a grade of between 3.0% and 3.5% K2O and between
0.9% and 1.3% P2O5. The potential quantities and grades of the target are
conceptual in nature, as there has been insufficient exploration to estimate
Mineral Resources over their areas and as it is uncertain if further
exploration will result in the estimation of one or more Mineral Resources.
Parkway Managing Director, Patrick McManus stated: “The large
Exploration Target at Dambadgee, its grade, relative thickness and
amenability to low-cost bulk sand mining techniques (ASX release 21 August
2018), makes it a valuable asset within the Dandaragan Trough Project. This
announcement confirms the potential of the Trough as a region containing
significant tonneages of fertiliser feedstocks, potash and phosphates. Our
K-Max technology will produce Sulphate of Potash and Phosphoric Acid.
Both these commodities have a ready demand, both locally and regionally.”
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
-Figure 1 Dandaragan Trough Project location
Parkway had previously released an Exploration Target for the Prospect based on historical drilling
and on limited drilling completed by Parkway (refer ASX release 28 September 2017 “New Exploration
Targets for Dandaragan Trough“).
During May 2018 Parkway undertook a 17 hole (1678 m) air-core program across the Dambadgee
Prospect. The drilling intersected significant thicknesses of fresh greensands in both the Poison Hill
Greensand and the Molecap Greenstone units. In addition, the drilling increased the known extent of
the greensand units and greatly improved the company’s understanding of the geology and structure
of the Prospect (refer ASX Release 21 August 2018 “Recent Dandaragan Trough Drilling”).
As a consequence of the success of the program the company engaged its resource consultants
Continental Resource Management Pty Ltd (“CRM”) to update the Exploration Target for the
Dambadgee Prospect area incorporating the new drill data. The methodology used to prepare the
estimate is detailed below.
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
Tenement Consolidation and Rationalisation.
With the definition of a substantial exploration target at Dambadgee, as well as the existing JORC 2012
resources of potash and phosphate at Dinner Hill, the company has defined sufficient resources of
greensand material to support a long-life fertiliser manufacturing project. In order to maximise the
use of funds going forward, the company has decided to relinquish lesser prospective ground to
concentrate on its two core areas at Dinner Hill and Dambadgee. The company has commenced the
process of converting the Dinner Hill tenure to retention status and will shortly commence converting
Dambadgee to similar status. The result will be the company’s landholding in the Dandaragan Trough
will reduce to approximately 150 sq km. This will result in substantially lower holding costs of the
Project. The Company will continue to refine the process flow sheet to improve recoveries, as well as
to complete further metallurgical testwork to attempt to extract greater value from the magnesium,
aluminium and iron, which are not optimised in the current K-Max® flowsheet.
EXPLORATION TARGET ESTIMATION
The methodology used in the estimation of the Exploration Target for the Dambadgee Prospect is
provided below. The estimation methodology differs from the September 2017 estimation in two
aspects. The September 2017 estimation was confined only to material within what was regarded as
fresh Molecap Greensand, whereas this estimation includes all material in the Poison Hill Greensand,
the Gingin Chalk and the Molecap Greensand that meet set criteria. The current estimation reports
Phosphate content within the overall Potash wireframe, whereas the earlier estimate generated
separate estimates for Potash and Phosphate mineralisation.
The estimate is based on air-core drilling undertaken by Parkway Minerals between 2011 and 2018,
and earlier drilling by other parties. Relevant holes are listed in Appendix 2. A plan showing the
Exploration Target areas and drill locations is provided as Figure 2.
The criteria used to select suitable material is based on metallurgical studies undertaken on the Dinner
Hill Deposit for potassium. The criteria set for potentially economic mineralisation used in the
estimation are a lower cut-off of 2.0% K2O, and a Fe2O3:K2O ratio of less than 9. Six separate
wireframes were constructed. Three separate wireframes were constructed west of the Dambadgee
Fault (for the Poison Hill Greensand, the Gingin Chalk, and Molecap Greensand). Two wireframes
were constructed for fresh Molecap Greensand within the Dambadgee Fault Zone. East of the fault,
a single wireframe was constructed for fresh Molecap Greensand.
The boundaries of the estimated mineralisation were constrained by the tenement boundaries and a
surface RL contour of 190m, below which erosion has removed the greensand bearing formations.
Figure 2 shows a drill plan with the Exploration Target boundary.
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
Figure 2 Dambadgee Prospect showing Drilling and Exploration Target outline (green)
The estimation was carried out using Micromine software. Tonnage was calculated by multiplying the
wireframe volume by the relevant dry specific gravity of 1.5 for Poison Hill Greensand and the Gingin
Chalk and 1.63 for Molecap Greensand.
The grade of each body was estimated from the average grade of all drill hole intersections within
each wireframe.
For further information, please contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Tel: +61 (0) 408 956 798
Email: info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
COMPETENT PERSON’S STATEMENT
The information in this report that relates to the estimation and reporting of the Exploration Target
and Mineral Resources is based on and fairly represents information and supporting documentation
prepared by J.J.G. Doepel, who is a member of the Australasian Institute of Mining and Metallurgy.
Mr. Doepel, Principal Geologist of the independent consultancy Continental Resource Management
Pty Ltd, has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration. He is qualified as a Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. This
report is issued with Mr. Doepel’s consent as to the form and context in which the Exploration Target
appears.
About Parkway Minerals
Parkway Minerals (ASX: PWN) is a company focused on developing fertiliser feedstock projects.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 1,050km2 in the greensand deposits of
the Dandaragan Trough, in Western Australia’s Perth Basin. The area is prospective for both
phosphate and potash. Previous exploration indicates glauconite sediments are widespread for more
than 150km along strike and 30km in width. The project is well situated in relation to infrastructure,
with close access to rail, power and gas. A successful commercial outcome will allow the Company to
become a major contributor to the potash and phosphate markets at a time of heightened regional
demand.
The Company owns 44M shares (31%) of Davenport Resources, which owns a potash exploration
project in the South Harz region of Thuringia, in Central Germany. The region has been a potash
producing area for over 100 years.
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
APPENDIX 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
Air-core drilling was used to obtain 1m or 2m samples from target horizons;
3kg sub-samples were split by rotary splitter or by scoop sampling. Subsample size 3 to 4kg.
Vertical NQ Air-core
Drilling
techniques
Drill sample
recovery
Logging
Sub-sampling
techniques and
sample
preparation
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
Location of data
points
Data spacing
and distribution
Orientation of
data in relation
Clay content of moist greensands ensured total recovery and retention of
all size fractions;
Holes were conditioned at completion and cyclone opened and cleaned
before next hole drilled
All intervals geologically logged directly into a field computer using a
database designed to capture relevant data including, oxidation, grainsize,
rounding, sorting, mineralisation, hardness, colour and stratigraphic unit.
All logging sample layouts are photographed and chip trays stored for
future reference.
Duplicate field splits at a 1:18 ratio returned R2 correlation coefficient of
0.96 for P2O5 for 2012 drilling and 0.98 for more recent drilling, indicating
robustness of sampling process;
Duplicate field splits at a 1:18 ratio returned R2 correlation coefficient of
0.99 for K2O for 2012 drilling and 0.98 for more recent drilling, again
indicating robustness of sampling process;
Sample preparation by Genalysis Laboratory Services Pty Ltd via drying and
total pulverisation
Analysis by Genalysis Laboratory Services Pty Ltd by Phosphate Major
Element Suite FB1 method (XRF after lithium borate fusion);
Three alternate phosphate standards were submitted with samples at a
1:18 ratio. For the P2O5 analyses the respective means of the analytical
results of the standards were 19.3%, 9.74%, and 4.94% as against the
nominal standard means of 19.3%, 9.72%, and 4.94%;
Three alternate potash standards were submitted with samples at a 1:18
ratio. For the K2O analyses the respective means of the analytical results of
the standards were 1.55%, 3.02%, and 3.76% as against the nominal
standard means of 1.55%, 3.02%, and 3.75%;
Sampling and logging verified by site visits by Exploration Manager and
Independent Consultant. Logging checked against major element assays
and sample photography;
Assay entry by digital capture of laboratory files, with later verification of
significant intervals against original files.
Holes located by GPS;
Grid MGA_GDA94, Zone 50;
Elevation data is based on a topographic contour set produced from SRTM
imagery at 5m vertical resolution.
1m or 2m samples collected and analysed throughout mineralized
horizons;
Geological continuity across mineralisation.
Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
Parkway Minerals NL Announcement: Dambadgee Prospect
Criteria
January 2019
Commentary
to geological
structure
Sample security
Samples transported from site to laboratory by Parkway staff.
Audits or reviews Sample techniques, logs, and data reviewed positively by independent
consultant geologist.
Section 2 Reporting of Exploration Results
Criteria
Commentary
Mineral
tenement and
land tenure
status
Exploration done
by other parties
Geology
The Exploration Target is within the granted Exploration Licences
E70/4137, 4609, and 5102, registered in the name of Parkway Minerals
NL;
E70/4137 was granted on 22/05/2012 for a period of five years and an
extension of a further five years has been approved. The required first six
years’ expenditures have been met;
E70/4609 was granted on 31/03/2015 for a period of five years. The
required first three years’ expenditures have been met;
E70/5102 was granted on 7/12/2017 for a period of five years.
Drilling has been carried out within the area by Dempsey Minerals Ltd, by
Agerton Phosphate Pty Ltd, and by Australian Fertilizers Ltd;
Results from these programmes have been incorporated into Parkway’s
database and into the Exploration Target estimations.
The phosphate is present as fluorapatite nodules and grains concentrated
within particular horizons of horizontal greensand and chalk formations;
The potash is present as the mineral glauconite, which is a major
constituent of the Molecap and Poison Hill Greensands and a minor
constituent of the Gingin Chalk.
See Appendix 2.
Drill hole
Information
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept lengths
Diagrams
Balanced
reporting
Other
substantive
exploration data
Further work
No data aggregation of analyses used;
No metal equivalent values used.
Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
Diagrams are included in the report.
Grades are consistent across deposit;
Intersection grades show consistent hole to hole grades.
There is no unreported substantive exploration data.
Further metallurgical test-work is expected to be carried out to confirm
expected recoveries of potash and phosphate.
Further drilling is expected to be carried out in order to enable the
estimation of Mineral Resources.
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
Section 3 Estimation and Reporting of Mineral Resources
Criteria
Commentary
Database integrity Assay data copied digitally from laboratory files; significant intersections
Site visits
Geological
interpretation
Dimensions
checked; Micromine drill-hole verification performed.
Competent person visited project area during drilling programmes in June
and August 2012, April 2013, and in March 2015.
High degree of confidence in geological interpretation, as stratigraphy is
both visually and chemically distinct and continuous.
The Dambadgee Exploration Target has a north-south length of 7.5km and
an east-west width of 11km.
The mineralisation is beneath an east-west trending set of low-hills and
is constrained by tenure and by weathering and erosion to the west,
north, and south;
Estimation and
modelling
techniques
The fresh potash mineralisation has an average thickness of 62m and is
about 45m below surface.
Estimation of Exploration Target K2O grade by weighted average of grades
within wireframes based on fresh mineralisation above 2% K2O;
Estimation of Exploration Target P2O5 grade by weighted average of grades
within wireframes based on fresh potash mineralisation above 2% K2O.
Moisture
Tonnages estimated on dry basis.
Cut-off
parameters
Mining factors or
assumptions
Not applicable
Metallurgical
factors or
assumptions
Glauconite to be retained during process by wet high intensity magnetic
separation (WHIMS) and stockpiled for later production of potash products
within K-Max plant;
The processing route for production of single superphosphate is
conventional; consisting of wet scrubbing, screening, desliming, magnetic
separation, grinding, flotation, and reaction with sulphuric acid to produce
single superphosphate.
Not applicable.
Environmental
factors or
assumptions
Bulk density
Classification
Audits or reviews
Exploration Target Potash mineralisation has Fe2O3:K2O ratio <9.
Density determinations carried out on 93 PQ core samples by Metallurgy
Pty Ltd and reported as dry densities;
Poison Hill Greensand: 12 samples, median SG 1.45, mean SG 1.55, SG of
1.50 used;
Gingin Chalk: 7 samples, median SG 1.53, mean SG 1.50, SG of 1.50 used;
Molecap Greensand: 68 samples, median SG 1.64, mean SG 1.64, SG of
1.63 used;
All mineralisation is classified as an Exploration Target, as it is the
Competent Person’s view that the drill-holes from which the target is
estimated are not spaced closely enough to imply both geological and
grade continuity throughout the area.
Exploration Target estimation peer reviewed by Parkway Exploration
Manager
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
Criteria
Commentary
Discussion of
relative accuracy /
confidence
The relative accuracy of the Exploration Target estimate is reflected in the
reporting of the Exploration Target as per the guidelines of the 2012 JORC
Code.
Parkway Minerals NL Announcement: Dambadgee Prospect
January 2019
APPENDIX 2 –DRILL-HOLE DETAILS
Table 4 details the drill-holes used for the exploration target estimate.
Table 1 Dambadgee Drill-hole Locations (all holes vertical)
HOLE
EASTING NORTHING
DGAC0002 378486
6599551
DGAC0003 375338
6600150
G1
382018
6598325
G2
383106
6598362
G3
383531
6598343
G4
382379
6598600
G5
382000
6599107
G6
382445
6599522
G7
382834
6599543
G8
382241
6599744
G9
382846
6599949
G10
382816
6600329
G11
382398
6600347
G12
381983
6600359
G14
381992
6599538
G15
381607
6598205
G16
381207
6598178
G17
381960
6598596
G18
381629
6598601
G19
381595
6599045
G20
383890
6598651
MA1
381672
6599541
MA2
381964
6599961
MA3
381937
6602051
MA4
381960
6601226
MA5
381627
6600397
MA6
381594
6599987
MA7
381084
6601175
PWAC133
375324
6597689
PWAC297
381986
6598617
PWAC298
381989
6599109
PWAC299
381983
6599477
PWAC300
382002
6599939
PWAC301
381991
6600362
PWAC516
377206
6599582
PWAC517
377899
6599542
PWAC518
378582
6599527
PWAC519
379269
6599518
PWAC520
379958
6599505
PWAC521
380650
6599497
RL
261
257
253
217
245
237
242
231
239
232
250
254
251
249
244
246
237
246
249
245
233
254
244
241
260
265
256
250
219
245
243
247
243
249
243
264
263
225
246
265
DEPTH
90
84
66
60
66
51
60
48
72
57
63
72
69
60
66
75
50
66
72
66
60
66
54
51
63
69
63
57
39
72
87
108
75
78
110
125
140
62
140
149
Parkway Minerals NL Announcement: Dambadgee Prospect
PWAC522
PWAC523
PWAC524
PWAC525
PWAC526
PWAC527
PWAC528
PWAC529
PWAC530
WAD9
WAD10
WAD13B
WAD35B
WAD36
WAD37
WAD38B
WAD39
WAD46
WAD47
WAD54
WAD55
WAD57
WAD58
WAD59
WAD60
WAD70
WAD71
WAD72
WAD73
WAD74
WAD75
WAD76
381334
381995
382714
383396
384066
384771
385459
386155
386841
376769
382161
378932
380543
383518
382056
380742
383116
379211
380661
377816
382762
382155
382198
377141
376013
378765
382155
381262
379787
379093
378194
377686
6599485
6599478
6599397
6599390
6599414
6599422
6599429
6599438
6599426
6599701
6599366
6599658
6599658
6599546
6598015
6598003
6598034
6596168
6596274
6599689
6600166
6599013
6597712
6597885
6596038
6600761
6600786
6600786
6600767
6597997
6597984
6596162
January 2019
262
244
231
237
245
246
247
262
260
276
240
245
259
245
236
232
220
238
229
251
254
234
221
242
233
243
262
262
253
247
267
230
149
132
80
97
110
85
80
88
86
55
74
77
87
64
88
68
38
75
63
81
90
54
60
75
60
50
66
81
62
80
83
77
Share your feedback
Discover