Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX Announcement
31 July 2015
_____________________________________________________________________________________
JUNE 2015 QUARTERLY REPORT
COMPANY DETAILS
ABN: 62 147 346 334
HIGHLIGHTS
PRINCIPAL
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
AND
Australia
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
o
Substantial increase in the phosphate Mineral Resource at
Dinner Hill, tonneage increase 109%, grade increase 4%.
o
Further potential exists to extend potash and phosphate
Mineral Resources to the south and east of the current
resources
o
Feasibility studies to commence on Dinner Hill phosphate
project. Planning in progress
o
Continuous production of lithium carbonate achieved in LMax mini-plant
o
Planning in progress for confirmatory drilling on Küllstedt at
South Harz project.
W www.potashwest.com.au
E info@potashwest.com.au
P +61 8 9479 5386
F +61 8 9475 0847
Germany
ASX CODE
PWN
FRANKFURT CODE
A1JH27
AUSTRALIA
OTC PINK CODE
PWNNY
CORPORATE
INFORMATION
(31 July 2015)
218 M Ordinary shares
36M Partly paid shares
5M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director
Dandaragan Trough Project
Potash West NL (“Potash West” or “the Company”) has continued to advance the
Dinner Hill Potash and Phosphate Deposit, located some 200km north of Perth in
Western Australia, Figure 1. Dinner Hill forms part of the larger Dandaragan
Trough landholding having an area of over 2,600km2. Sedimentary rocks within the
trough contain glauconite, a potash rich mica, and phosphate nodules. The objective
is to produce potash and phosphate fertilisers and a range of valuable by-products
from the glauconite and phosphate present within the sediments of the Dandaragan
Trough.
During the quarter results from previous work and drilling completed in March
2015 were used to update the Potash and Phosphate Mineral Resources for the
Dinner Hill Project (ASX release 03 June 2015). Following this work an updated
Exploration Target was estimated for sparsely drilled mineralisation east and south
of the current resource area (ASX release 22 July 2015).
1
Potash West NL – Quarterly Report
June 2015
Figure 1: Location plan, Dandaragan Trough Project
2
Potash West NL – Quarterly Report
June 2015
Mineral Resource Update
The resource update uses drilling carried out in 2014 and 2015 comprising an additional 90 aircore drill holes
for 2732m. The resource now covers an area of some 27 km2. Higher grade phosphate mineralisation is
continuous to the north within the area of the new drilling significantly upgrading the inventory in both tonnes
and grade, compared with the phosphate resource estimate published in 2014, (ASX release 20 March 2014).
These results will form the basis of pit design and mine scheduling studies carried out as part of the planned
feasibility study into phosphate production at Dinner Hill, set to begin in the third quarter of 2015.
Dinner Hill Deposit Resource Summary1
Resource
Category
Phosphate
Potash
Potash resources included within
the phosphate resource area
Indicated
Tonnes
(Mt)
250
Indicated
Inferred
Totals
155
20
175
4.1
2
3.8
Indicated
18
3.8
Indicated
Inferred
Totals
175
20
195
4.2
2
3.8
Potash resource outside the phosphate
resource area
Total Potash Resources
P2O5
(%)
2.9
K 2O
(%)
Note: Totals may differ from sum of individual items due to rounding
1 – ASX (ASX release 03 June 2015).
Exploration Target Update
Mineralisation within the Dinner Hill Phosphate and Potash Deposit extends over some 70km2 to the south
and east of the recently re-estimated Phosphate and Potash Mineral Resources (ASX release 03 June 2015).
The updated Exploration Target estimate, (ASX release 22 July 2015) reflects changes to the original
Exploration Target (ASX release 07 May 2013) as a result of the additional drilling and the updated Mineral
Resource estimate.
The Exploration Target for the Dinner Hill project is 1.2 billion tonnes to 1.8 billion tonnes of greensand
containing potash mineralisation at a grade of between 3.5% and 4% K2O. This partially includes 550 million
tonnes to 800 million tonnes of phosphate mineralisation at a grade of between 2% and 2.8% P2O5.
The potential quantity and grade of the target is conceptual in nature, as there has been insufficient
exploration to estimate a Mineral Resource over its area and as it is uncertain if further exploration will
result in the estimation of a Mineral Resource
The location of Dinner Hill resource and the potash and phosphate Exploration Target areas are shown in
figures 2 and 3.
Within the central section of the Exploration Target (between about 6,630,000N and 6,636,500N in figure 2)
the contained potash mineralisation is of higher grade, between 4% and 4.6% K 2O. North of 6,637,500N in
figure 3, phosphate grades are higher ranging from 4% to 5% P2O5, with the mineralisation attaining an
average thickness of about 9m.
3
Potash West NL – Quarterly Report
June 2015
Figure 2: Dinner Hill Potash Exploration Target Area and Blocks showing drill-holes used for estimation
4
Potash West NL – Quarterly Report
June 2015
Figure 3: Dinner Hill Phosphate Exploration Target Area and Blocks showing drill-holes used for estimation
5
Potash West NL – Quarterly Report
June 2015
The Dandaragan Trough project has unique advantages of excellent connectivity to transport facilities,
infrastructure and proximity to local and regional markets. The Dinner Hill resource is located less than
200km from two major bulk export ports, Kwinana and Geraldton and is well situated in relation to major
project infrastructure.
Dinner Hill Scoping Study
A revision of the mining plan is in progress, using the updated resource. This will form the basis of a revised
financial model, which will be completed in the September quarter.
Technology
The K-Max process has been developed by our technology partners, Strategic Metallurgy (SM). The
development was financed by the Company and the IP is 100% owned by Potash West. SM have built upon
the K-Max technology and developed an innovative process to extract Lithium from micas such as Lepidolite
and Zinnwaldite.
SM has licensed the technology to Cobre Montana (ASX:CXB) (refer CXB announcement 26 September
2014). Cobre Montana is pursuing opportunities to use the technology to meet the demands of a rapidly
growing Lithium market. SM is also investigating other avenues to commercialise its Lithium extraction
technology.
In recognition of the importance of the K-Max process as a base for Lithium extraction, SM has agreed to
vest 25% ownership of the Lithium technology to Potash West. PWN and SM will work together to maximize
the value of this IP to the benefit of both parties.
GERMANY
South Harz Project
The Company has earned a 55% interest in a company, East Exploration Pty Ltd (EE), which holds
exploration licences in the South Harz region of Germany, (Figure 4). The South Harz region has a long
history of potash mining, dating back to the late 1890s. Extensive exploration work and R&D was carried
out in the period from the 1960s to the 1980s. This confirmed that substantial potash deposits in the form of
sylvinite (KCl/NaCl) and carnallite (KCl/MgCl) still remain in this region.
A review of some the archived exploration data relating to historical drilling on Küllstedt has been completed
and an Exploration Target estimated, as shown below.
6
Potash West NL – Quarterly Report
June 2015
The potential quantity and grade of the Exploration Target is conceptual in nature, as there has been
insufficient exploration to estimate a Mineral Resource over its area and as it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
Tonnage
(MMT)1
4,055 – 5,141
Küllstedt Exploration Target
Grade Range Grade Range Potash (K2O) Tonnage
%K2O2
%KCl3
(MMT)4
7.2 - 25
11.8 - 41
292 – 1,285
1 - The volume of the potash seam was estimated from the geological model which has been constructed using
historical drillhole data. The tonnage was derived from the style of mineralisation and its characteristic density
which can vary between 1.83 t/m3 and 2.32 t/m3. This amounts to a tonnage range of between 4,055 million
metric tonnes and 5,141 million metric tonnes of mineralized rock.
2 – The grade range was estimated from assayed drill intersections of the potash seam which range from 7.2%
to 25% K2O
3 – Conversion of assay K2O to KCl product multiply by 1.6393
4 - The tonnages of K2O were obtained by multiplying the tonnage of mineralized material with the corresponding
K2O grade of the potash seam, which range from 7.2% to 25%. Accordingly, the minimum K2O tonnage is 292
million metric tonnes and the maximum K2O tonnage is 1,285 million metric tonnes
A more detailed report is contained within the ASX announcement of 4 March 2015. Planning is in progress
for a verification drilling program which is expected to consist of a 3 to 4 confirmatory holes which could
allow reporting of a JORC compliant inferred resource.
The Company, and the other owners of East Exploration, opened negotiations with Petratherm Limited
(ASX:PTR) on 11 May 2015 . The objective was to sell 100% of East Exploration into Petratherm, in return
for shares. This did not eventuate and discussions ceased in June ( ASX announcement 12 June 2015)
7
Potash West NL – Quarterly Report
June 2015
Figure 4: South Harz Project Location
8
Potash West NL – Quarterly Report
June 2015
CORPORATE
Potash West shares commenced trading on the Frankfurt Stock Exchange during the quarter, under the stock
code A1JH27.
Mr. Gary Johnson stepped down as NED during the quarter. Mr. Johnson is the majority owner of Strategic
Metallurgy, which has carried out process development activities for Potash West, and has developed an
innovative process for lithium production. Gary and his team have been a significant asset in our process
development. His resignation will:
Allow Mr. Johnson to focus on development of the lithium technology, jointly owned by Strategic
Metallurgy and Potash West (refer ASX announcement 27 February 2015).
Avoid conflicts of interest in the commercialization of this technology.
Announcements
The following ASX announcements were made during the quarter:
30/06/2015
Director Change, Appendix 3Z and 3Y
25/06/2015
Completion of $1.8m Placement
23/06/2015
Trading Halt
22/06/2015
Resource Roadhouse Article
12/06/2015
PWN East Exploration Update
11/06/2015
Question and Answer Session
03/06/2015
PWN Significant Increase in Resources at Dinner Hill Project
21/05/2015
Successful Commissioning World First L-Max Mini-Plant
15/05/2015
Potash West RIU Sydney Resources Round Up Interview
12/05/2015
Updated Investor Presentation
12/05/2015
Investor Presentation
11/05/2015
PTR: Agreement to Acquire Potash Project
11/05/2015
South Harz Potash Project To Receive Major Funding Boost
07/05/2015
Trading Halt
24/04/2015
Quarterly Activities and Cashflow Reports
20/04/2015
Inclusion in German Investment Newsletters
20/04/2015
PWN Frankfurt Listing
17/04/2015
Analyst Coverage - Arrowhead Report
14/04/2015
s708A Notice, Appendix 3B & 3Y's
The following announcements were made subsequent to 30 June 2015:
06/07/2015
s708A Notice, LR3.10.5A Notice and Appendix 3B
06/07/2015
s708A Notice and Appendix 3B
22/07/2015
Exploration Target Update
Cash on Hand
At 30 June 2015, $1.5 million cash was available. $0.4 M, before costs, was raised in late June and the
balance of $1.4M subsequent to 30 June 2015.
9
Potash West NL – Quarterly Report
June 2015
Tenement Summary
The following information is provided in accordance with ASX Listing Rule 5.4.3:
Country
Tenement
Tenement
Interest held at 1
January 2015
Interest acquired
/ disposed of
during quarter
Tenement Interest
held at 31 March
2015
WA
E70/3418
100% (1)
N/A
100%
WA
E70/3987
100% (1)
N/A
100%
WA
E70/3988
100% (1)
N/A
100%
WA
E70/3989
(1)
N/A
100%
WA
WA
WA
WA
WA
WA
WA
E70/4124
E70/4137
E70/4138
E70/4139
E70/4471
E70/4609
E70/4687
N/A
N/A
N/A
N/A
N/A
100%
N/A
Pending
100%
100%
100%
100%
100%
Pending
100%
Pending
100%
100%
100%
100%
0%
Pending
(1) Denotes Beneficial holding of the Mineral Rights to Glauconite & Phosphate, and any byproducts resulting
For further information contact:
Potash West NL:
Media:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Web: www.potashwest.com.au
Professional Public Relations
Colin Hay
Tel: +61 (08) 9388 0944
About Potash West
Potash West (ASX:PWN) is an exploration company focused on developing large greensand deposits in West
Australia’s Perth Basin. The Company aims to define a substantial resource base and investigate how best
to recover potash and other minerals from the Dandaragan Trough. The project is well situated in relation
to infrastructure, with close access to rail, power and gas. A successful commercial outcome will allow the
Company to become a major contributor to the potash and phosphate markets at a time of heightened
regional demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 2,600km2. Previous exploration indicates
glauconite sediments are widespread for more than 150km along strike and 30km in width. Current JORC
compliant Indicated Mineral Resources stand at 250Mt at 2.9% P2O5 of phosphate mineralisation and
175Mt at 4.2% K2O, amenable to processing by the K-Max process.
10
Potash West NL – Quarterly Report
June 2015
Competent Person’s Statement:
Dandaragan Trough Project
The production targets and other information in this announcement that relate to Mineral Resources, and
Exploration Targets are based on, and fairly represent, the Mineral Resource and Exploration Target
information and supporting documentation extracted from the reports which have been prepared by a
Competent Person in compliance with the JORC Code (2012) and released to ASX by the Company on 03
June 2015 and 22 July 2015. Potash West confirms that it is not aware of any new information or data that
materially affect the information included in the original announcements. All material assumptions and
technical parameters underpinning both the Mineral Resource estimate and the Exploration Target in those
previous ASX releases continue to apply and have not materially changed.
South Harz Project
The information in this announcement that relates to an Exploration Target is based on, and fairly represents,
the information and supporting documentation extracted from the report which was prepared by a Competent
Person in compliance with the JORC Code (2012) and released to the ASX by the Company on 04 March
2015. Potash West confirms that it is not aware of any new information or data that materially affect the
information included in the original announcement. All material assumptions and technical parameters
underpinning the Exploration Target estimate in that previous ASX release continue to apply and have not
materially changed.
11
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
Potash West NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
30 June 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (Government grant and R&D refund)
Net Operating Cash Flows
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 1
Current quarter
$A’000
Year to date
(12 months)
$A’000
(127)
(662)
(382)
(1,521)
3
24
(506)
(2,159)
(125)
(325)
(125)
(631)
(325)
(2,484)
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
1.13
(631)
(2,484)
379
4,100
(2)
377
(250)
3,850
Net increase (decrease) in cash held
(254)
1,366
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
1,784
164
1.22
Cash at end of quarter
1,530
1,530
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (Equity Raising Costs)
Net financing cash flows
Payments to directors of the entity, associates of the directors,
related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
113
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation Contributions.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available
$A’000
3.1
Loan facilities
3.2
Credit standby arrangements
Amount used
$A’000
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluation
300
4.2
Development
4.3
Production
4.4
Administration
300
Total
600
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 3
Current quarter
$A’000
Previous quarter
$A’000
1,530
2,292
1,530
2,292
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
6.1
6.2
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
Interests in mining
tenements and
petroleum tenements
acquired or increased
Tenement
reference
and
location
Nature of interest
(note (2))
E70/3360
EXPIRY
E70/4609
GRANT
Interest at
beginning
of quarter
Interest at
end of
quarter
100%
0%
0%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks
+Convertible
debt
securities
(description)
Number quoted
Issue price per
security (see
note 3) (cents)
Amount paid up
per security (see
note 3) (cents)
200,929,615
35,960,024
200,929,615
35,960,024
Fully paid
$0.05
Fully paid
$0.001
473,402
20,913
31,250
473,402
20,913
31,250
$0.045
$0.048
$0.040
$0.045
$0.048
$0.040
+ See chapter 19 for defined terms.
Appendix 5B Page 4
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
100,000
100,000
1,350,000
1,000,000
500,000
1,992,188
-
Exercise price
$0.400
$0.600
$0.355
$0.130
$0.150
$0.087
Expiry date
8 September 2016
8 September 2016
13 November 2015
25 October 2015
7 February 2017
6 November 2017
Issued during
quarter
Exercised
during quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
Patrick McManus
31 July 2015
............................................................
Date: ............................
(Director/Company secretary)
Print name:
Patrick McManus
.........................................................
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements and petroleum tenements acquired, exercised or
lapsed during the reporting period. If the entity is involved in a joint venture
agreement and there are conditions precedent which will change its percentage
interest in a mining tenement or petroleum tenement, it should disclose the
change of percentage interest and conditions precedent in the list required for
items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6
01/05/2013