PWN Reports Upgrade to Dinner Hill Exploration Targets
Released
Released
Announcement PDF
ASX Announcement
22 July 2015
_____________________________________________________________________________________
COMPANY DETAILS
ABN: 62 147 346 334
PRINCIPAL
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
POTASH WEST REPORTS UPGRADE TO DINNER HILL EXPLORATION TARGETS
HIGHLIGHTS:
•
•
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
W www.potashwest.com.au
E info@potashwest.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
OTC PINK
PWNNY
CORPORATE
INFORMATION
22 July 2015
230M Ordinary shares
36M Partly paid shares
5M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director)
•
The updated Exploration Target for the Dinner Hill Phosphate Project is:
o 550 million tonnes to 800 million tonnes of phosphate mineralisation
at a grade of between 2% and 2.8% P2O5 .
o An increase of approximately 50% in tonneage and 5% in grade
This partially overlaps a Potash Exploration Target of:
o 1.2 billion tonnes to 1.8 billion tonnes of greensand containing potash
mineralisation at a grade of between 3.5% and 4% K2O.
o An approximate increase in tonneage of 20% and a decrease in grade
of 15%.
Potential to extend Potash and Phosphate Mineral Resources to the south and
east of the current resources.
The potential quantity and grade of the targets are conceptual in nature, as there has
been insufficient exploration to estimate Mineral Resources over their areas and as it
is uncertain if further exploration will result in the estimation of Mineral Resources.
Mineralisation within Potash West NL’s (“Potash Wests”) Dinner Hill Phosphate and
Potash Deposit, located in the Midwest wheat belt of Western Australia, some 225km
by road north of Perth, has been shown by past and recent drilling to extend over some
70km2 to the south and east of the recently re-estimated phosphate and potash Mineral
Resources (ASX release 03 June 2015). This updated Exploration Target estimate reflects
changes to the original Exploration Target (ASX release 07 May 2013) as a result of the
additional drilling and the updated Mineral Resource estimate (ASX release 03 June
2015). Both the Exploration Target and the JORC compliant resources have increased.
Within the central section of the Exploration Target (between about 6,630,000N and
6,636,500N) the contained potash mineralisation is of higher grade, between 4% and
4.6% K2O. North of 6,637,500N, phosphate grades are higher, ranging from 4% and 5%
P2O5, with an average thickness of about 9m. See figures 3 and 5.
Potash West Managing Director Patrick McManus said “the increased resource reported
to the ASX in early June 2015 will support a very long-lifed project producing phosphate
fertilizer from the Dandaragan Trough. These Exploration Targets indicate that the
resource could increase significantly with further drilling”.
“Western Australia and SE Asia imports the bulk of our phosphate requirements from
overseas. This is an opportunity to establish a fertilizer project in Western Australia,
meeting the needs of local and regional farmers. We have commenced feasibility studies
to confirm the commercial viability of the Phosphate Project, planned to produce single
1
superphosphate”.
Potash West NL – Exploration Target update
July 2015
The Dinner Hill Deposit is easily accessed from Perth via the Brand Highway. (Figure 1). The project is
estimated to contain an Indicated Phosphate Mineral Resource of 250Mt at 2.9% P2O5. Indicated and
Inferred Potash Resources are 195Mt at 3.8% K2O including 175Mt of Indicated Resources at 4.0% K2O in
the target Molecap Greensand (ASX release 03 June 2015).
Figure 1: Location plan, Dandaragan Trough Project
2
Potash West NL – Exploration Target update
July 2015
Continental Resource Management Pty Ltd (“CRM”) carried out this Exploration Target estimate for
extensions to the Dinner Hill Potash and Phosphate Deposits. The estimate was made by John Doepel,
Principal Geologist. It is reported in accordance with the 2012 Edition of the JORC Code.
The estimate is based upon air-core drilling carried out by Potash West between 2011 and 2015. Only those
holes within or adjacent to the target area were used for input into the estimation. The relevant holes are
listed in Appendix 2 and are shown on Figures 3 and 5.
POTASH EXPLORATION TARGET ESTIMATION
Target Area
The boundaries to the target area were set by the limits to the fresh Molecap Greensand encountered in
the Potash West drill-holes. The area of the fresh greensand is bounded by topography, with lower ground
surfaces being associated with weathering or erosion of the target horizon, as is illustrated in Figure 3, a
cross-section along 6,635,400N that shows:
• The 400m spaced 2012 drill-holes in the west that define the Dinner Hill resource;
• The 800m spaced 2013 drill-holes that show the continuation of the fresh greensand in the east;
and the lower topography further east that is associated with weathered greensand; and
• A valley slope to the west that has, by erosion, limited the extent of the greensand in this direction.
The eastern boundary to the north of 6,635,400N is set by the limit of fresh greensand within Block K
(374,200E) shown in Figure 3. The southern boundary of the target area is coincident with the southern
boundary of E70/3987.
Figure 2: Cross section 6,635,400N
Estimation Methodology
Within the Dinner Hill Deposit the potash grade within the Molecap Greensand increases from north to
south. Separate estimates of tonnes and grade were made for individual sections or blocks of the target
area. The estimates incorporated the average potash grade of the greensand within drill-holes immediately
adjacent to or within each block. Volumes were estimated by multiplying the average intersection thickness
within these drill-holes by the area of the block. Tonnages assumed an SG of 1.63 for the fresh greensand.
3
Potash West NL – Exploration Target update
July 2015
Figure 3: Dinner Hill Potash Exploration Target Area and blocks showing drill-holes used for estimation
4
Potash West NL – Exploration Target update
July 2015
PHOSPHATE EXPLORATION TARGET ESTIMATION
Target Area
The boundaries to the target area were set by the limits to the fresh phosphate mineralisation encountered
in the Potash West drill-holes. This area is bounded by topography, with lower ground surfaces being
associated with weathering or erosion of the target horizon. Within the Dinner Hill Deposit the phosphate
grade within decreases from north to south (Figure 4).
To the north of 6,640,400N the target area is limited to the east by a Department of Conservation Reserve.
The eastern boundary between 6,640,400N and 6,635,800N (373,400E) is set by the limit of phosphate
mineralisation within Block PN, Figure 5. The southern boundary of the target area is 6,629,800N, to the
south of which no recoverable phosphate mineralisation was intersected in the Dinner Hill area. It should
be noted however that significant phosphate mineralisation has been intersected further south within
other Potash West tenements.
Estimation Methodology
Separate estimates of tonnes and grade were made for individual sections or blocks of the target area. The
estimates incorporated the average phosphate grade of the mineralisation within drill-holes immediately
adjacent to or within each block. A lower cut-off grade of 1% recoverable P2O5 was used to constrain the
intersections. Volumes were estimated by multiplying the average intersection thickness within these drillholes by the area of the block. Tonnages assumed an SG of 1.63 for the Molecap Greensand and 1.50 for
mineralisation within the Gingin Chalk and Poison Hill Greensand.
Figure 4: OBM Long-section 370160E – displaying higher phosphate grades in the north of the target area.
5
Potash West NL – Exploration Target update
July 2015
Figure 5: Dinner Hill Phosphate Exploration Target Area and blocks showing drill-holes used for estimation
6
Potash West NL – Exploration Target update
July 2015
COMPETENT PERSON’S STATEMENT
The information in this report that relates to the estimation of the Mineral Resources and Exploration
Targets is based on and fairly represents information and supporting documentation prepared by J.J.G.
Doepel, who is a member of the Australasian Institute of Mining and Metallurgy. Mr. Doepel, Principal
Geologist of the independent consultancy Continental Resource Management Pty Ltd, has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration. He is qualified
as a Competent Person as defined in the 2012 edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. This report is issued with Mr. Doepel’s consent as to the
form and context in which the Mineral Resource and Exploration Target appears.
For further information contact:
Potash West NL:
Patrick McManus
Managing Director
Tel: +61 (0)8 9479 5386
info@potashwest.com.au
Web:
www.potashwest.com.au
Professional Public Relations:
Colin Hay
Tel: +61 (0)8 9388 0944
E: colin.hay@ppr.com.au
About Potash West
Potash West (ASX: PWN) is an exploration company focused on developing potassium-rich glauconite deposits in West
Australia’s Perth Basin. The Company aims to define a substantial resource base and investigate how best to recover
phosphate and potash from the mineral. The project is well situated in relation to infrastructure, with close access to
rail, power and gas. A successful commercial outcome will allow the Company to become a major contributor to the
potash and phosphate markets at a time of heightened regional demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with exploration
licenses and applications covering an area of 2,600km2. Previous exploration indicates glauconitic sediments are
widespread for more than 150km along strike and 30km in width.
7
Potash West NL – Exploration Target update
July 2015
APPENDIX 1 - JORC CODE, 2012 EDITION – TABLE 1
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
Commentary
Sampling
techniques
• Air-core drilling was used to obtain 1m samples from target horizons;
• 3kg sub-samples were split by rotary splitter or by scoop sampling.
Sub-sample size 3 to 4kg.
Drilling
techniques
• Vertical NQ Air-core
Drill sample
recovery
• Clay content of moist greensands ensured total recovery and
retention of all size fractions;
• Holes were conditioned at the completion of each sample interval and
the cyclone was opened and cleaned at the end of each three metre
rod.
Logging
• All intervals geologically logged directly into a field computer using a
database designed to capture relevant data including, oxidation,
grainsize, rounding, sorting, mineralisation, hardness, colour and
stratigraphic unit. All logging sample layouts are photographed and
chip trays stored for future reference.
Sub-sampling
techniques and
sample
preparation
• Duplicate field splits at a 1:18 ratio returned R2 correlation coefficient
of 0.96 for P2O5 for 2012 drilling and 0.98 for more recent drilling,
indicating robustness of sampling process;
• Duplicate field splits at a 1:18 ratio returned R2 correlation coefficient
of 0.99 for K2O for 2012 drilling and 0.98 for more recent drilling,
again indicating robustness of sampling process;
• Sample preparation by Genalysis Laboratory Services Pty Ltd via
drying and total pulverisation
Quality of assay
data and
laboratory tests
• Analysis by Genalysis Laboratory Services Pty Ltd by Phosphate
Major Element Suite FB1 method (XRF after lithium borate fusion);
• Three alternate phosphate standards were submitted with samples
at a 1:18 ratio. For the P2O5 analyses the respective means of the
analytical results of the standards were 19.3%, 9.74%, and 4.94% as
against the nominal standard means of 19.3%, 9.72%, and 4.94%.
• Three alternate phosphate standards were submitted with samples
at a 1:18 ratio. For the K2O analyses the respective means of the
analytical results of the standards were 1.55%, 3.02%, and 3.76% as
against the nominal standard means of 1.55%, 3.02%, and 3.75%.
Verification of
sampling and
assaying
• Sampling and logging verified by site visits by Exploration Manager
and Independent Consultant. Logging checked against major
element assays and sample photography;
• Assay entry by digital capture of laboratory files, with later verification
of significant intervals against original files.
Location of data
points
• Holes located by GPS;
• Grid MGA_GDA94, Zone 50;
• Elevation data is based on a topographic contour set produced from
SRTM imagery at 5m vertical resolution.
Data spacing
and distribution
• 1m samples collected and analysed throughout mineralized
horizons;
• Geological continuity across deposit.
8
Potash West NL – Exploration Target update
July 2015
Criteria
Commentary
Orientation of
data in relation
to geological
structure
• Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
Sample security
• Samples transported from site to laboratory by Potash West staff.
Audits or
reviews
• Sample techniques, logs, and data reviewed positively by
independent consultant geologist.
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Commentary
Mineral
tenement and
land tenure
status
• The Exploration Target is within E70/3987 and E70/4138;
• E70/3987 is held by Richmond Resources Pty Ltd. A deed is place
between Richmond Resources and Potash West, whereby Potash
West holds the rights to the glauconite and phosphate minerals and
to any by-products produced processing these minerals.
• E70/3987 was granted on 26/07/2011 for a period of five years. The
required expenditure has been met for the first three years.
• E70/4138 is held by Potash West
• E70/4138 was granted on 26/05/2012 for a period of five years. The
required expenditure was met for the first two years.
• The target is beneath farm land owned by Roseville Nominees,
Ronald Shane Love, J.W & W.V. Fordham and Alidade Pty Ltd, with
whom compensation agreements have been signed, with the mineral
sub-surface rights subsequently being granted both above and below
30m below surface.
Exploration
done by other
parties
•
Geology
• The phosphate is present as fluorapatite nodules and grains
concentrated within particular horizons of horizontal greensand and
chalk formations;
• The potash is present as the mineral glauconite, which is a major
constituent of the Molecap and Poison Hill Greensands and a minor
constituent of the Gingin Chalk.
Drill hole
Information
• See Appendix 2.
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
Diagrams
• No data aggregation of analyses used;
• No metal equivalent values used.
Balanced
reporting
• Grades are consistent across deposit;
• Intersection grades shown on diagrams show consistent hole to hole
grades.
No exploration work was carried out in the area of the deposit
prior to that by Potash West.
• Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
• Diagrams are included in the report.
9
Potash West NL – Exploration Target update
July 2015
Criteria
Commentary
Other
substantive
exploration data
Further work
• There is no unreported substantive exploration data.
• Further bulk density work is expected to be carried out.
SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES
Criteria
Commentary
Mineral
tenement and
land tenure
status
• The deposit is within E70/3987 held by Richmond Resources Pty Ltd.
A deed is place between Richmond Resources and Potash West,
whereby Potash West holds the rights to the glauconite and
phosphate minerals and to any by-products produced processing
these minerals.
• The tenement was granted on 26/07/2011 for a period of five years.
The required expenditure has been met for the first three years.
• The deposit is beneath farm land owned by Roseville Nominees,
Ronald Shane Love, and Alidade Pty Ltd, with whom compensation
agreements have been signed, with the mineral sub-surface rights
subsequently being granted both above and below 30m below
surface.
Exploration
done by other
parties
•
Geology
• The phosphate is present as fluorapatite nodules and grains
concentrated within particular horizons of horizontal greensand and
chalk formations;
• The potash is present as the mineral glauconite, which is a major
constituent of the Molecap and Poison Hill Greensands and a minor
constituent of the Gingin Chalk.
Drill hole
Information
• See Appendix 2.
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
Diagrams
• No data aggregation of analyses used;
• No metal equivalent values used.
Balanced
reporting
• Grades are consistent across deposit;
• Intersection grades shown on diagrams show consistent hole to hole
grades.
Other
substantive
exploration data
Further work
• There is no unreported substantive exploration data
No exploration work was carried out in the area of the deposit
prior to that by Potash West.
• Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
• Diagrams are included in the report
• Further bulk density work is expected to be carried out;
• Infill air-core drilling of the existing 400m by 400m grid is expected
within the yet to be optimized initial pit area.
10
Potash West NL – Exploration Target update
July 2015
APPENDIX 2 –DRILL-HOLE DETAILS
The table below details the air-core drill-holes used for the exploration target estimate.
• All holes are vertical
• The intersection refers to the Molecap Greensand
• Coordinate system id GDA94 Zone 50
HOLE
PWAC039
PWAC040
PWAC226
PWAC279
PWAC284
PWAC285
PWAC286
PWAC287
PWAC288
PWAC330
PWAC335
PWAC336
PWAC337
PWAC338
PWAC339
PWAC341
PWAC342
PWAC343
PWAC344
PWAC346
PWAC347
PWAC348
PWAC349
PWAC350
PWAC352
PWAC363
PWAC364
PWAC365
PWAC367
PWAC368
PWAC369
PWAC371
PWAC372
PWAC376
PWAC377
PWAC378
PWAC379
PWAC380
PWAC382
PWAC383
PWAC384
PWAC406
PWAC408
EASTING
(m)
374383
375224
370572
370554
370755
370758
370753
370756
370753
370596
370602
369799
369421
370606
369789
370610
369802
369414
369002
369803
369416
370591
369804
370628
370251
372197
372994
373802
372202
373053
373798
372240
373002
373005
373804
374602
372199
373002
372212
373007
373806
370136
370937
NORTHING
(m)
6628239
6628056
6638404
6635200
6635402
6635804
6636195
6636601
6637000
6634800
6633351
6633344
6633355
6632551
6632558
6631828
6631776
6631884
6631748
6630952
6630937
6630194
6630147
6629381
6629348
6635400
6635400
6635404
6634608
6634632
6634600
6633798
6633806
6632996
6633000
6633001
6632200
6632201
6631387
6631450
6631437
6638797
6639722
RL
(m)
309
286
366
354
354
357
356
357
348
344
348
340
336
344
329
349
355
350
327
349
330
341
335
330
311
328
321
311
323
306
305
335
325
330
300
300
318
303
345
328
310
370
359
11
INTERSECTION
From (m) Length (m)
42
18
6
14
36
3
34
9
35
11
40
4
37
7
34
7
25
6
27
11
34
13
13
15
2
14
33
13
6
9
35
13
31
16
18
16
1
11
28
14
10
10
31
13
10
13
14
14
6
6
25
9
29
9
18
6
24
10
11
9
10
14
39
12
37
10
37
13
43
5
32
11
19
19
8
19
41
11
31
20
30
21
34
4
30
3
Potash West NL – Exploration Target update
HOLE
PWAC426
PWAC430
PWAC431
PWAC433
PWAC435
PWAC438
PWAC439
PWAC441
PWAC443
PWAC444
PWAC447
EASTING
(m)
371020
370922
370542
370137
370939
371341
371614
371675
371739
371740
371620
NORTHING
(m)
6640401
6639990
6639700
6639198
6638398
6638347
6638401
6637989
6637603
6637200
6640752
July 2015
RL
(m)
351
356
361
370
358
350
350
346
345
334
345
12
INTERSECTION
From (m) Length (m)
25
3
28
4
31
2
33
4
29
6
30
7
30
7
30
5
32
5
23
9
23
2
Share your feedback
Discover