Update of Resources and Exploration Target for Dinner Hill
Released
Released
Announcement PDF
ASX Announcement
26 September 2017
_____________________________________________________________________________________
COMPANY DETAILS
PARKWAY MINERALS (ASX:PWN) REPORT UPDATE OF RESOURCES AND
EXPLORATION TARGET FOR THE DINNER HILL DEPOSIT
ABN: 62 147 346 334
PRINCIPAL
REGISTERED OFFICE
Parkway Minerals NL
Ground floor
675 Murray Street
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6782
HIGHLIGHTS:
Indicated plus inferred Phosphate Resource of 630 Mt at 1.9% P2O5
o Tonnage increase of 150% (from 250 Mt)
Indicated and Inferred Potash Resources now 910 Mt at 3.8% K2O
o Tonnage increase of 370% (from 195 Mt)
Resource expansion potential remains
Exploration Target updated
W www.parkwayminerals.com.au
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
OTC PINK
PWNNY
CORPORATE
INFORMATION
26 September 2017
Parkway Minerals NL (“the Company” or “Parkway”) (ASX: PWN) is pleased to
announce an update to the phosphate and potash resources at its wholly owned
Dinner Hill Deposit located 175 km north of Perth within the Company’s 100%
Dandaragan Trough Fertiliser Project area (Figure 1). The Dinner Hill Deposit
area comprises Exploration Licence’s E70/3987 and E70/4138 which cover a
combined area of 332 km2. Within this, the resource covers an area of
approximately 52 km2 and the Exploration Target covers an additional 40 km2.
The resource and exploration target update uses drilling carried between 2011
and 2016 and takes into account recent metallurgical testing commissioned by
Parkway.
444M Ordinary shares
123M Partly paid shares
17M listed Options
5M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director)
1
Figure 1: Location Plan, Dandaragan Trough Fertiliser Project
The project tenements cover two virtually horizontal greensand formations within the
Cretaceous Coolyena Group: the Poison Hill Greensand and the Molecap Greensand. Over
most of the area of the deposit they are separated by the Gingin Chalk and in places are
underlain by a thin pebble horizon containing phosphatic nodules. An average thickness of
about 11m of surficial, mostly sandy, cover overlies the greensand units. The greensands and
the chalk contain significant amounts of phosphate as grains and nodules of fluorapatite. They
also contain significant potash within the mineral glauconite. Figure 2 is a cross section
through the deposit showing the geology and summary intersections through potash and
phosphate mineralization.
2
Figure 2 Dinner Hill Deposit – Cross-section 663 7200N – showing geological formations
and intersection grades
The Dinner Hill Deposit (Figure 3) has an Indicated and Inferred Phosphate Mineral Resource
of 630 Mt at 1.85% P2O5. Within this phosphate resource there is an Indicated Mineral
Resource of 160 Mt at 2.45% P2O5 and an Inferred Mineral Resource of 470 Mt at 1.7% P2O5
(refer to Table 1). This compares to a previous Indicated Resource of 250 Mt at 2.9% P2O5
completed in June 2015 (ASX release 3 June 2015).
The principal potash mineralization is associated with the Phosphate Resources within the
Molecap Greensand which contains Indicated and Inferred Potash Mineral Resources of
630Mt at 4.4% K2O. A 250% increase in tonnes and a 16% grade increase compared to the
estimate published in June 2015, (ASX release 3 June 2015). An additional Indicated and
Inferred Mineral Resource of 280 Mt at 2.6% K2O occurs marginal to the phosphate resource
(see Table 1).
The resource update reflects metallurgical testwork carried out as part of prefeasibility studies
for the Dinner Hill Deposit. This work looked at the flotation response of material from
different parts of the Dinner Hill resource and found that the response was affected by:
Degree of oxidation of the material, in particular by an increase in fine iron oxides
liberated by oxidation of glauconite; and
Flotation response of high chalk material, where there is incomplete differentiation
between chalk and phosphates.
The resource has been adjusted to remove mineralization with high levels of oxidation, and
high ratios of calcium to phosphate. Testwork recently completed at KEMWorks (refer ASX
release 5 September 2017) indicates that there are potential improvements in process design
that could be achieved. This will be investigated as part of future work for the prefeasibility
testwork.
With the increased level of confidence in the deposit and metallurgical treatment part of the
exploration target for the deposit (refer ASX announcement 22 July 2015) has been
reclassified as Inferred Resource. This has necessitated a revision of the Dinner Hill
Exploration Target, which is included in this announcement.
Managing Director, Patrick McManus said “The restrictions to the Resource, caused by
metallurgical constraints, has caused the removal of some areas, previously included as
Indicated Resource, from the resource inventory. These have been replaced with areas which
3
have not been drilled to the same density and which are classified as Inferred Resource. The
Resource area now covers 52 km2 within the Dinner Hill project area.”
“Based on the positive testwork carried out by KEMWorks we believe that further testwork
may allow some of the material removed from the resource to be re-included”
Figure 3 Dinner Hill Resource and Exploration Target Plan
4
DINNER HILL RESOURCE
Table 1 Dinner Hill Deposit Resource Summary
Resource
Category
Phosphate
Indicated
Inferred
Total
Tonnes
(Mt)
160
470
630
Indicated
Inferred
Total
160
470
630
4.2
4.4
4.4
Potash Resource outside the
Phosphate Resource area
Indicated
Inferred
Total
50
230
280
2.65
2.6
2.6
Total Potash Resources
Indicated
Inferred
Totals
210
700
910
3.8
3.8
3.8
Potash
Potash Resources included within
the Phosphate Resource area
P2O5
(%)
2.45
1.7
1.85
K2O
(%)
Note: Totals may differ from sum of individual items due to rounding
The Mineral Resource estimate has been reported in accordance with the guidelines of the
JORC Code (2012 edition). A significant amount of the current phosphate resource is in the
Indicated Mineral Resource category, which will enable the estimation of a Probable Ore
Reserve and the completion of a Feasibility Study.
Geological models were constructed by Continental Resource Management (“CRM”). CRM
has visited the project on several occasions and undertook the work necessary to complete
the resource estimate.
Resource drilling has utilized NQ air-core exclusively, which is the preferred technique in
unconsolidated formations. The data comprised drill logs and analyses for 222 vertical aircore drill-holes totaling 8143m and 93 SG samples taken from four PQ diamond holes drilled
in August 2012. Occasional water, mainly from perched water tables, has been observed, but
the minor quantities have not impacted sample integrity. Hole collars were located using a
hand-held GPS, which provides sufficient accuracy for the style of the deposit.
Duplicate field re-splits were collected at the rate of 1 for every 18 routine samples and
analysis indicates that repeatability for potash and phosphate is within industry standards.
Commercial phosphate standards, inserted at the same ratio, were used to monitor the
quality of laboratory data for elements of interest.
The block model has been constructed using a 100mN by 100mE by 1mRL parent block cell.
Variography on potash and phosphate assays was used determine appropriate search
distances for interpolation of grades to the parent blocks using an inverse distance squared
relationship.
5
The cut-off grades used for both potash and phosphate are based on 1% P2O5 and K2O
wireframes. These grades are based on ongoing metallurgical and economic studies and were
set at levels that ensure continuity of mineralization throughout the deposit.
Contract earthmoving representatives are familiar with the deposit and have been present
during drilling operations. The lithological sequence appears mostly to be amenable to the
use of scrapers for overburden removal and “dozer” traps for ore mining with operations
similar to those of well-established operations in the mineral sands industry.
The geological dataset that has been used to estimate the Dinner Hill Mineral Resources is
comprehensive and represents a valid representation of the in-situ mineralization. The
geology of the Coolyena Group is predictable and well understood over the resource area.
Additional work to extend the range of bulk density measured is planned. Portions of the
resource will be infill drilled to elevate those areas to the Measured Mineral Resource
category.
DINNER HILL EXPLORATION TARGET
An Exploration Target for the Dinner Hill Deposit had previously been reported (ASX release
22 July 2015). As a consequence of the recent work on the Indicated and Inferred Resources,
the Exploration Target at Dinner Hill has been revised, as some material within the previously
announced Exploration Target has been reclassified as Inferred Resource. The target has also
been expanded to the south to include material contiguous with the revised Resources where
recent drilling completed by the Company has established sufficient confidence in the
continuity of mineralization to warrant classification as an Exploration Target.
The Dinner Hill South Phosphate Exploration Target is 250 to 300 Million tonnes at a grade
of 1.5% and 1.8% P2O5. The Dinner Hill South Potash Exploration Target is 800 to 1600
Million tonnes at a grade of between 3.8% and 4.4% K2O.The potential quantities and grades
of the targets are conceptual in nature, as there has been insufficient exploration to estimate
Mineral Resources over their areas and as it is uncertain if further exploration will result in the
estimation of one or more Mineral Resources.
The Exploration Target for both Phosphate and Potash has been based on wide spaced drilling
that has established geological continuity of the host greensand formations. The same
metallurgical criteria used for the resource estimation were applied to the exploration target
estimation. Potentially economic mineralization intersected in the drilling was enclosed
within separate wireframes models. The boundaries of the wireframes were constrained by
topography and overburden thickness. Grade estimation within the exploration target area
was calculated by weighted average grade for all drill-hole intersections fitting the
metallurgical model within the wireframe.
NEXT STEPS
The testwork carried out at KEMWorks has indicated areas where we can improve the grade
and recovery of the phosphate circuit, this will be the priority for the flowsheet development
as part of the feasibility study for Dinner Hill.
The Dinner Hill Deposit Resources remain open to the South within the Exploration Target. As
the current delineated resources indicate a long life at the envisaged mining rate of 4 Mtpa,
the ongoing exploration priority will be to convert some of the current Indicated Resource to
a Measured Resource. This will be carried out as part of the Bankable Feasibility Study.
6
COMPETENT PERSON’S STATEMENT
The information in this report that relates to the estimation of the Mineral Resources is based
on and fairly represents information and supporting documentation prepared by J.J.G. Doepel,
who is a member of the Australasian Institute of Mining and Metallurgy. Mr. Doepel, Principal
Geologist of the independent consultancy Continental Resource Management Pty Ltd, has
sufficient experience relevant to the style of mineralisation and type of deposit under
consideration. He is qualified as a Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. This report is issued with Mr Doepel’s consent as to the form and context in which
the Mineral Resource appears.
For further information contact:
Potash West NL:
Patrick McManus
Managing Director
Tel: +61 (0)8 9479 5386
info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
About Parkway Minerals
Parkway Minerals (ASX: PWN) is a company focused on developing fertiliser feedstock projects.
The Company holds 1,900km2 of exploration licenses and applications over Lake Barlee, where it
is exploring a sulphate of potash project from the brines in the lake, north of Southern Cross in
Western Australia.
The Company has a major land holding over one of the world’s largest known glauconite deposits,
with exploration licenses and applications covering an area of over 1,050km2 in the greensand
deposits of the Dandaragan Trough, in Western Australia’s Perth Basin. The area is prospective
for both phosphate and potash. Previous exploration indicates glauconite sediments are
widespread for more than 150km along strike and 30km in width. A pre-feasibility study is in
progress for stage 1, production of phosphate fertilisers. The project is well situated in relation to
infrastructure, with close access to rail, power and gas. A successful commercial outcome will
allow the Company to become a major contributor to the potash and phosphate markets at a time
of heightened regional demand.
The Company owns 19.25M shares (26%) of Davenport Resources, which owns a potash
exploration project in the South Harz region of Thuringia, in Central Germany. The region has
been a potash producing area for over 100 years.
7
APPENDIX 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
Air-core drilling was used to obtain 1m samples from target horizons;
3kg sub-samples were split by rotary splitter or by scoop sampling.
Sub-sample size 3 to 4kg.
Drilling
techniques
Vertical NQ Air-core
Drill
sample Clay content of moist greensands ensured total recovery and
retention of all size fractions;
recovery
Holes were conditioned at completion and cyclone opened and
cleaned before next hole drilled
Logging
All intervals geologically logged directly into a field computer using a
database designed to capture relevant data including, oxidation,
grainsize, rounding, sorting, mineralisation, hardness, colour and
stratigraphic unit. All logging sample layouts are photographed and
chip trays stored for future reference.
Duplicate field splits at a 1:18 ratio returned R 2 correlation coefficient
Sub-sampling
of 0.96 for P2O5 for 2012 drilling and 0.98 for more recent drilling,
techniques and
indicating robustness of sampling process;
sample
Duplicate field splits at a 1:18 ratio returned R 2 correlation coefficient
preparation
of 0.99 for K2O for 2012 drilling and 0.98 for more recent drilling,
again indicating robustness of sampling process;
Sample preparation by Genalysis Laboratory Services Pty Ltd via
drying and total pulverisation
Quality of assay Analysis by Genalysis Laboratory Services Pty Ltd by Phosphate
Major Element Suite FB1 method (XRF after lithium borate fusion);
data
and
laboratory tests Three alternate phosphate standards were submitted with samples
at a 1:18 ratio. For the P2O5 analyses the respective means of the
analytical results of the standards were 19.3%, 9.74%, and 4.94% as
against the nominal standard means of 19.3%, 9.72%, and 4.94%;
Three alternate phosphate standards were submitted with samples
at a 1:18 ratio. For the K2O analyses the respective means of the
analytical results of the standards were 1.55%, 3.02%, and 3.76% as
against the nominal standard means of 1.55%, 3.02%, and 3.75%.
Verification of Sampling and logging verified by site visits by Exploration Manager
and Independent Consultant. Logging checked against major
sampling
and
element assays and sample photography;
assaying
Assay entry by digital capture of laboratory files, with later verification
of significant intervals against original files.
Location of data Holes located by GPS;
points
Grid MGA_GDA94, Zone 50;
Elevation data is based on a topographic contour set produced from
SRTM imagery at 5m vertical resolution.
Data
spacing 1m samples collected and analysed throughout mineralized
horizons;
and distribution
8
Criteria
Commentary
Geological continuity across deposit;
Grade continuity for phosphate is 425m in both 0o/180o and 90o/270o
orientations. Grade continuity for potash is 500m in both 0o/180o and
90o/270o orientations. Vertical grade continuity is 3m for potash and
1m for phosphate. As the majority of the holes were drilled on a
square 400m spaced grid and samples were collected over 1m
intervals the geological and grade continuity is appropriate for the
estimation procedure and the resource classification.
Orientation
of Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
data in relation
to
geological
structure
Sample security
Audits
reviews
Samples transported from site to laboratory by Parkway staff.
or Sample techniques, logs, and data reviewed positively by
independent consultant geologist.
Section 2 Reporting of Exploration Results
Criteria
Commentary
The deposit and the Exploration Target is within E70/3987 and
Mineral
E70/4138;
tenement
and
land
tenure E70/3987 is held by Richmond Resources Pty Ltd. A deed is place
between Richmond Resources and Parkway, whereby Parkway
status
Exploration
done by other
parties
Geology
holds the rights to the glauconite and phosphate minerals and to any
by-products produced processing these minerals;
E70/3987 was granted on 26/07/2011 for a period of five years and
has been extended for a further five years. The required expenditure
has been met;
E70/4138 is held by Parkway;
E70/4138 was granted on 22/05/2012 for a period of five years and
has been extended for a further five years. The required expenditure
has been met;
The deposit is beneath farm land owned by Roseville Nominees,
Ronald Shane Love, and Alidade Pty Ltd. The mineral sub-surface
rights have been granted both above and below 30m below surface.
Exploration Agreements are in place with Alidade Pty Ltd and
Roseville Nominees.
An Option To Purchase Agreement is in place with Roseville
Nominees.
The Exploration Target is beneath farm land owned by Alidade Pty
Ltd.
No exploration work was carried out in the area of the deposit or
Exploration Target prior to that by Parkway.
The phosphate is present as fluorapatite nodules and grains
concentrated within particular horizons of horizontal greensand and
chalk formations;
The potash is present as the mineral glauconite, which is a major
constituent of the Molecap Greensand and a minor constituent of the
Gingin Chalk.
9
Criteria
Commentary
Drill
hole See Appendix 2.
Information
Data
aggregation
methods
Relationship
between
mineralisation
widths
and
intercept
lengths
Diagrams
No data aggregation of analyses used;
No metal equivalent values used.
Balanced
reporting
Grades are consistent across deposit;
Intersection grades show consistent hole to hole grades.
Other
substantive
exploration data
Further work
There is no unreported substantive exploration data
Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
Diagrams are included in the report
Further bulk density work is expected to be carried out;
Infill air-core drilling of the existing 400m by 400m grid is expected
within the yet to be optimized initial pit area.
Within the Exploration Target area infill air-core drilling on a 800m by
1600m grid is expected to allow confirmation of continuity of
mineralisation.
Section 3 Estimation and Reporting of Mineral Resources
Criteria
Commentary
Database
integrity
Assay data copied digitally from laboratory files; significant
intersections checked; Micromine drill-hole verification performed.
Site visits
Competent person visited site during drilling programmes in June
and August 2012, April 2013, and in March 2015.
Geological
interpretation
High degree of confidence in geological interpretation, as
stratigraphy is both visually and chemically distinct and continuous.
Dimensions
The resources have a north-south length of 13.4km and an east-west
length of 6.9km. Modelled mineralisation is between 2m and 20m
thick;
The minimum depth is 1m and the maximum depth is 70m, with the
majority of the resources being between 20m and 40m below
surface;
Mineralisation is closed to the west by topography and tenure; closed
to the north by weathering; open to the east; and thinner and of low
phosphate grade to the south.
The potash Exploration Target has a north-south length of 9km and
an east-west width of 5km. The minimum depth to mineralisation is
2m and the maximum is 35m. The average thickness of the potash
mineralisation within the target area is about 27m.
The potash Exploration Target mineralisation is closed to the west,
south, and east by topography and weathering. The mineralisation
extends to the north into the Dinner Hill Deposit.
10
Criteria
Commentary
The phosphate Exploration Target has a north-south length of 8km
and an average east-west width of 2km. The average depth to
mineralisation is about 33m.
The average thickness of the phosphate Exploration Target
mineralisation within the three holes is 17m;
The phosphate Exploration Target mineralisation appears to be
closed to the west, south, and east, being constrained by topography.
It extends to the north into the Dinner Hill Deposit.
Estimation
modelling
techniques
and
Estimation of P2O5 ore block grades by IDS using Micromine
software. Estimation within 1% recovered P2O5 wireframe restricted
to fresh Molecap Greensand that has a CaO:P2O5 ratio of <3.9 and
a Fe2O3:K2O ratio of <4.0;
Estimation of K2O ore block grades by IDS within 1% K2O (with
Fe2O3:K2O ratio <10) wireframe using Micromine software;
Block size 100m x 100m x 1m vertical (Sample spacing 400m x 400m
x 1m or 2m and, in one area, 200m x 200m x 1m for Indicated
Resources; and 800m x 800m x 1m or 2m for Inferred Resources);
Search criteria for phosphate Indicated Resources 425m to 0o;
plunge 0.2o to 180o; 425m to 90o; dip 0.65o to 90o; 1m vertical;
Search criteria for potash Indicated Resources 500m to 0o; plunge
0.2o to 180o; 500m to 90o; dip 0.65o to 90o; 3m vertical
Search criteria for Inferred Resources 1000m to 0o; plunge 0.2o to
180o; 1000m to 90o; dip 0.65o to 90o; 4m vertical;
Geological boundaries checked against grade shell;
Previous reports of similar estimates within northern portion of area,
but using different cut-off criteria;
No previous or current mine production;
No upper cuts as no outlying values;
OBM grades validated by comparison with assay values.
Estimation of Exploration Target P2O5 grade by weighted average of
grades above 1% P2O5;
Estimation of Exploration Target K2O grade by weighted average of
grades above 2% K2O;
Moisture
Tonnages estimated on dry basis.
Cut-off
parameters
Estimates carried out within 1% wireframes, but reported above 0%
lower block-cuts, as bulk mining envisaged and continuity of
mineralisation shown.
Exploration Target Potash mineralisation has Fe2O3:K2O ratio <10;
Exploration Target Phosphate mineralisation has Fe2O3:K2O ratio <4
and CaO:P2O5 ratio >1 and <3.9.
Mining factors or Topsoil and overburden to be mined by scrapers and mineralisation
to be mined by bulldozer feeding in-pit slurry unit.
assumptions
Metallurgical
factors
assumptions
or
The processing route for production of single superphosphate is
conventional; consisting of wet scrubbing, screening, desliming,
magnetic separation, grinding, flotation, and reaction with sulphuric
acid to produce single superphosphate;
Glauconite to be retained during process by wet high intensity
magnetic separation (WHIMS) and stockpiled for later production of
potash products within K-Max plant.
11
Criteria
Commentary
Waste, de-watered flotation tailings, and slimes to be returned to
Environmental
mine-void and covered with stored topsoil.
factors
or
assumptions
Bulk density
Density determinations carried out on 93 PQ core samples by
Metallurgy Pty Ltd and reported as dry densities;
Gingin Chalk: 7 samples, median SG 1.53, mean SG 1.50, SG of
1.50 used;
Molecap Greensand: 68 samples, median SG 1.64, mean SG 1.64,
SG of 1.63 used;
Classification
Resources within area of 400m x 400m spaced drilling classified as
Indicated, as it is the Competent Person’s view that the drill-holes
from which the resource is estimated clearly define both geological
and grade continuity throughout; and that the density data
adequately reflects that of the deposit.
Resources within area of 800m x 800m spaced drilling classified as
Inferred, as it is the Competent Person’s view that the drill-holes from
which the resource is estimated clearly define both geological and
grade continuity throughout; and that the density data adequately
reflects that of the deposit.
For mineralisation classified as an Exploration Target, it is the
Competent Person’s view that the drill-holes from which the target is
estimated are not spaced closely enough to imply both geological
and grade continuity throughout the area.
Audits or reviews
Resource estimation and Exploration Target reviewed Parkway
Exploration Manager.
Discussion
of The relative accuracy of the Mineral Resource estimate is reflected
in the reporting of the Mineral Resource as per the guidelines of the
relative accuracy
2012 JORC Code.
/ confidence
12
Parkway Minerals NL – Dinner Hill Resource Update
September 2017
APPENDIX 2, - LIST OF DRILLHOLES USED TO ESTIMATE THE DINNER HILL RESOURCE AND EXPLORATION
TARGET
The table below details the air-core drill-holes used for the resource estimate. All holes were drilled
vertically.
Hole ID
PWAC034
PWAC035
PWAC036
PWAC037
PWAC209
PWAC210
PWAC211
PWAC212
PWAC213
PWAC214
PWAC215
PWAC216
PWAC217
PWAC218
PWAC219
PWAC220
PWAC221
PWAC222
PWAC223
PWAC224
PWAC225
PWAC226
PWAC227
PWAC228
PWAC229
PWAC230
PWAC231
PWAC232
PWAC233
PWAC234
PWAC235
PWAC236
PWAC237
PWAC238
PWAC239
PWAC240
PWAC241
PWAC242
PWAC243
PWAC244
PWAC245
PWAC246
PWAC247
E MGA Z50
(GDA 94)
368142
368148
368128
368139
368555
369363
370149
368559
369351
370154
370164
369368
368554
368554
369359
370151
368952
368538
369344
369758
370156
370572
370554
369758
368945
368167
368357
368543
368919
369369
369757
370166
370558
370556
369749
368957
368352
368154
368351
368550
368963
369345
369754
N MGA Z50
(GDA 94)
6637532
6636740
6636050
6635359
6636394
6636400
6636446
6635603
6635597
6635604
6637206
6637194
6637201
6638002
6637998
6638003
6638403
6638399
6638407
6638400
6638399
6638404
6638000
6638000
6637995
6637998
6637800
6637610
6637620
6637603
6637601
6637605
6637603
6637197
6637200
6637231
6637398
6637198
6636997
6636801
6636798
6636808
6636799
13
RL
(m)
352
362
359
353
375
367
375
365
352
359
358
383
376
348
368
361
356
338
361
365
362
366
360
363
357
340
351
364
377
370
365
361
360
350
372
391
365
357
367
375
386
380
374
Depth
(m)
80
75
78
68
48
45
55
48
39
48
48
53
45
21
43
45
21
15
39
45
39
45
48
39
30
21
12
28
45
45
42
39
44
45
48
60
24
15
33
45
60
54
56
Parkway Minerals NL – Dinner Hill Resource Update
Hole ID
PWAC248
PWAC249
PWAC250
PWAC251
PWAC252
PWAC253
PWAC254
PWAC255
PWAC256
PWAC257
PWAC258
PWAC259
PWAC260
PWAC261
PWAC262
PWAC263
PWAC264
PWAC265
PWAC266
PWAC267
PWAC268
PWAC269
PWAC270
PWAC271
PWAC272
PWAC273
PWAC274
PWAC275
PWAC276
PWAC277
PWAC278
PWAC279
PWAC280
PWAC281
PWAC282
PWAC283
PWAC284
PWAC285
PWAC286
PWAC287
PWAC288
PWAC289
PWAC290
PWAC291
PWAC330
PWAC331
PWAC332
PWAC333
PWAC334
PWAC335
E MGA Z50
(GDA 94)
370158
370556
370560
369754
368956
368752
368154
368363
368352
368159
368351
368558
368355
368553
368957
369356
369755
370154
370553
370554
369757
368953
368353
368155
368357
368160
368556
368958
369361
369722
370156
370554
369356
368955
368554
368159
370755
370758
370753
370756
370753
370753
370741
370740
370596
369800
369796
369002
368548
370602
N MGA Z50
(GDA 94)
6636798
6636800
6636401
6636397
6636405
6636402
6636402
6636598
6636799
6637000
6637197
6636997
6636202
6636003
6636002
6635996
6635999
6636002
6636000
6635603
6635600
6635599
6635797
6635604
6635388
6635209
6635200
6635201
6635201
6635176
6635203
6635200
6634799
6634802
6634799
6634794
6635402
6635804
6636195
6636601
6637000
6637402
6637807
6638203
6634800
6634810
6634146
6634151
6634150
6633351
14
September 2017
RL
(m)
365
355
362
377
370
372
366
370
369
361
371
377
371
367
365
360
363
363
360
352
351
364
357
354
369
347
370
365
354
343
345
354
351
355
356
344
354
357
356
357
348
354
357
358
343
340
321
325
333
348
Depth
(m)
48
39
57
60
35
45
28
36
29
24
27
42
28
35
36
39
42
51
48
48
36
36
21
15
35
15
37
39
36
30
36
48
36
30
27
9
51
51
48
48
36
42
42
39
45
30
30
30
24
54
Parkway Minerals NL – Dinner Hill Resource Update
Hole ID
PWAC336
PWAC337
PWAC338
PWAC339
PWAC340
PWAC341
PWAC342
PWAC343
PWAC344
PWAC345
PWAC346
PWAC347
PWAC348
PWAC349
PWAC350
PWAC351
PWAC352
PWAC353
PWAC354
PWAC355
PWAC356
PWAC357
PWAC358
PWAC359
PWAC360
PWAC361
PWAC362
PWAC363
PWAC364
PWAC365
PWAC366
PWAC367
PWAC368
PWAC369
PWAC370
PWAC371
PWAC372
PWAC373
PWAC374
PWAC375
PWAC376
PWAC377
PWAC378
PWAC379
PWAC380
PWAC381
PWAC382
PWAC383
PWAC384
PWAC385
E MGA Z50
(GDA 94)
369799
369421
370606
369789
369379
370610
369802
369414
369002
370604
369803
369416
370591
369804
370628
369805
370251
369550
369939
370348
370351
369933
369545
369143
368748
369152
369539
372197
372994
373802
374602
372202
373053
373798
374603
372240
373002
373804
374600
372200
373005
373804
374602
372199
373002
373799
372212
373007
373806
374599
N MGA Z50
(GDA 94)
6633344
6633355
6632551
6632558
6632543
6631828
6631776
6631884
6631748
6630958
6630952
6630937
6630194
6630147
6629381
6629353
6629348
6637796
6637801
6637799
6636596
6636603
66
Share your feedback
Discover