SEPTEMBER 2026 – QUARTERLY REPORT
HIGHLIGHTS
Operations
§ Award of $2.10 million mine dewatering related project bolstered diversified revenue base.
§ Record quarterly revenue underpinned $1.08 million of positive operating cash flow for quarter.
§ Growing project pipeline providing increased confidence in medium-term revenue outlook.
Technology
§ Secured key approvals for QBMC including EA and Development Application (DA).
§ Advancing key pre-development activities for QBS Brine Management Complex (QBMC).
§ Active stakeholder engagement and evaluation of additional project sites to expand ecosystem.
Corporate
§ Strong cash balance of $3.36 million at end of period (plus $0.92 million R&DTI refund in Oct).
§ Discussions with strategic partners to support project development and corporate growth.
§ Quarterly investor webinar scheduled for 12:00pm AEDT on Friday 30 October 2026.
Ongoing Testing to
Expand Range of
Feed Brine Options
Evaluation of additional
sources of non-CSG brine.
Record Quarterly
Operating Revenue
of $7.71 million
Bolstered by major new
project awards.
Group Profitability
Underpinned by
$0.45 million EBITDA
Diversified contribution
underpinning earnings.
Awarded Critical
Mine Dewatering
Project
Delivering complex scope
for global mining major.
Evaluating Major
Brownfield Project
Development Sites
Assessing sites with key
ecosystem synergies.
Secured Key
Approvals for
QBMC Project
Commenced key pre-
development activities.
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 2
MELBOURNE, Australia – Parkway Corporate Limited (Parkway or the Company) (ASX: PWN, FSE:
4IP) is pleased to report its activities for the quarter ending 30 September 2026.
Introduction
Parkway is a leading Australian water & wastewater treatment and process technology company
primarily operating through two strategically integrated divisions:
§ Industrial Operations
§ Process Technologies
In addition to providing specialised engineering solutions for industry, Parkway’s Industrial Operations
division also provides an inhouse project delivery platform to support the commercialisation of a portfolio
of proprietary technologies developed by Parkway’s Process Technologies division.
INDUSTRIAL OPERATIONS
Parkway’s Industrial Operations are performed through Parkway Process Solutions (PPS) and
predominantly focused on the provision of conventional water and wastewater treatment related
products and specialty project execution related services. In addition, PPS also provides leading
industrial companies including energy, mining and major engineering contractors as well as municipal
water authorities, with a range of specialised water infrastructure related engineered solutions.
Integrated Project Delivery Capabilities
PPS leverages core capabilities across the entire project lifecycle, from early-stage process
development and optimisation, through to equipment selection, fabrication, installation and ultimately
commissioning, to deliver successful project outcomes. Additional details about the core capabilities,
integrated solutions and an extensive list of project references are outlined in the latest PPS Capability
Statement1
.
Operating Performance
Parkway’s focus on complex and high-value infrastructure projects requiring specialised engineering
solutions, continues to drive ongoing strategic growth, whilst also expanding inhouse capabilities.
As previously disclosed2
, PPS is the key SMP (structural, mechanical & piping) contractor for a major
resource recovery project currently under construction. This high-profile project showcases the
strategically valuable project delivery capabilities of PPS in delivering complex wastewater treatment
related infrastructure at an industrial scale.
Despite site activities for the major infrastructure project ramping down in recent months as the project
approaches completion, Parkway continued to generate record operating revenue of $7.71 million and
strong operating cash flow during the period. Additional details about the financial performance of
Parkway are outlined in the Corporate section.
Mine Dewatering Contract
On 31 August 2026, Parkway announced3
the award of a mine dewatering related contract by a major
global mining company. The scope awarded to Parkway predominantly involves the design,
engineering, fabrication and supply of industrial scale mine pit dewatering equipment packages (refer
Figure 1) for a significant mine rehabilitation related project operated by the global mining company. At
peak operating capacity, the Parkway scope will enable the transfer and/or processing of up to 5 million
litres per hour (5ML/hr) of wastewater, including highly acidic and complex mine pit wastewater,
highlighting the substantial scale of the project.
1
PPS Capability Statement, available at: https://pwnps.com/collections/pps-capability-statement
2
Refer to ASX announcement: https://pwn.investorhub.com/announcements/7021813
3
Refer to ASX announcement: https://investorhub.pwnps.com/announcements/YNNZJx-parkway-awarded-dewatering-contract-by-global-mining-company
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 3
Figure 1: Mine Dewatering Project – Limited Selection of Project Equipment Packages in Production
(i) Fabrication of specialised pump skids (1 of 6). (ii) Transport of pump pontoons for mine pit water. (iii) Fabrication of VSD equipment controls (1 of 2).
The project is being delivered through Parkway’s integrated project delivery platform, leveraging
Parkway’s established supplier network and involves project management by PPS-Melbourne,
fabrication and containerisation by PPS subsidiary Tankweld and local project support by PPS-Darwin.
The scale of the dewatering project has incrementally increased to approximately $2.1 million with the
contracted scope expected to be finalised in the December quarter, demonstrating the professional and
highly efficient project delivery capabilities of Parkway.
As part of current discussions to evaluate opportunities to expand the longer-term dewatering related
scope, Parkway is also exploring the potential to provide an integrated solution for the acidic and
metalliferous drainage (AMD) wastewater produced by the mine, based on proprietary Parkway
technologies. Additional details are outlined in the Acid & Metalliferous Drainage (AMD) Opportunities
section, under Process Technologies.
Business Development & Outlook
In addition to the mine dewatering project outlined above, PPS continues to experience significant
growth by systematically securing new business from diverse clients, for the provision of specialised
water & wastewater treatment related products, services and solutions. During the period, PPS
expanded its accredited vendor status with several major organisations, which continues to build a
strong growth platform and provide increased confidence in the medium-term revenue outlook.
PROCESS TECHNOLOGIES
Parkway’s Process Technologies related activities are performed through Parkway Process
Technologies (PPT) and predominantly focused on innovative process technology related R&D,
process development, evaluation and optimisation, as well as a range of technology scale-up and
commercialisation related activities.
Technology Development
Through PPT, Parkway continues to build a portfolio of proprietary technologies, capable of providing
highly integrated process solutions, for a range of complex wastewater and industrial process streams
traditionally considered difficult to treat. PPT has developed innovative applications for these
technologies, including in the processing and treatment of challenging industrial wastewater streams,
particularly for large scale industrial, oil & gas, mining and mineral processing related operations.
PPT Priorities
The development and commercialisation of a portfolio of proprietary process technologies remains a
priority for Parkway, with a range of ongoing activities focused on realising the substantial advantages
of the PPT technology portfolio. As a near term priority, Parkway is progressing the commercialisation
of these technologies in the context of coal seam gas (CSG) related applications through Queensland
Brine Solutions (QBS). Given these technologies have broader applications beyond CSG derived brine
processing, Parkway is also concurrently pursuing additional development opportunities with
established partners, particularly given Parkway’s growing project delivery capabilities.
Further details are provided in the Technology Commercialisation – Industrial section, below.
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 4
Technology Commercialisation – Queensland Brine Solutions (QBS)
Background
Since the large-scale development of the CSG industry in Queensland in 2010 and the corresponding
establishment and subsequent transition to the export of liquified natural gas (LNG) commencing in
2015, the CSG industry has been a significant part of the Queensland economy.
Over the life of currently operating CSG projects in Queensland, an estimated 6 million tonnes of waste
salts are forecast to be produced by these projects. A significant proportion of these salts have already
been produced, in the form of waste brine and are currently being stored in regulated waste brine
storage ponds, awaiting a viable long-term disposal solution. The disposal of waste brine and salts
through salt encapsulation as contemplated by the CSG industry, present extensive environmental risks
and challenges and remains deeply unpopular, with significant opposition from many stakeholders.
Developing an Integrated Solution
Following more than a decade of systematic process development, Parkway has developed a roadmap
for providing an industry-wide solution for the waste brine and salt related challenges facing the
Queensland CSG industry. Parkway intends to lead the development of strategic brine processing
related infrastructure, by leveraging its proprietary technologies to address significant industry
challenges (provision of liquid waste management services), whilst concurrently creating significant
value through the production of industrial chemicals.
An overview of the integrated brine management solution being developed by QBS through the QBMC
project is outlined in Figure 2. It should be noted that the QBMC’s capacity to process non-CSG sources
of brine, is highly attractive given the significant challenges associated with brine disposal by industry.
Figure 2: Queensland Brine Solutions (QBS) – QBMC Integrated Brine Management Solution
QBMC Scope & Roadmap
Whilst the primary long-term focus of the QBMC is to process CSG derived brines, as outlined in Figure
2, the QBMC development configuration will also enable the processing of other industrial and municipal
waste brines. In addition to the extensive testwork already performed in relation to a range of CSG
derived brines, Parkway has also been actively testing and evaluating other problematic waste brines
available in the general proximity of the planned QBMC. The strategy of ensuring QBMC is capable of
processing a diverse range of brines, provides Parkway with maximum operational flexibility as well as
broader partnering options to pursue the most optimal development roadmap.
To accelerate the path-to-market, Parkway is at the advanced stages of planning a Commercial
Demonstration Project (CDP, Stage 0) for the QBMC. In addition to processing a wide range of waste
brines and generating early revenues, the QBMC-CDP is intended to provide engineering data to
support a final investment decision (FID) for full-scale development of Stage 1.
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 5
QBMC Approvals
On 20 August 2026, Parkway announced the Western Downs Regional Council (WDRC) approved the
DA for the QBMC. The approved DA encompasses additional approvals from the Queensland
Government State Assessment and Referral Agency (SARA), including key Environmental Authority
(EA), as well as state-controlled road access permit.
These key approvals support the accelerated development of QBMC, as the scope of these approvals
covers both:
§ QBMC-CDP (Stage 0, Commercial Demonstration Project)
§ In addition to processing a wide range of waste brines, the QBMC-CDP is intended to
provide engineering data to underpin a final investment decision (FID) for full-scale
commercial development of Stage 1. The nominal capacity of QBMC-CDP is
anticipated to be 1/10th
scale of the first commercial stage, Stage 1.
§ QBMC-Commercial (Stage 1, strong financial metrics4
, NPV >$700 million, IRR >30%)
§ Stage 1 represents the first full-scale commercial development with a nominal
processing capacity of ~75,000 tonnes of contained salts, in waste brine, annually.
§ Whilst Stage 1 represents a nationally significant scale of liquid waste management
and chemical production infrastructure, the QBMC Master Plan involves the potential
for staged development of up to 4 stages, a capacity that could notionally treat all the
lifecycle waste brines produced by the coal seam gas (CSG) industry in Queensland5
.
Strategic Implications
As a result of securing key approvals, the QBMC will be the only regulated waste facility (RWF):
§ permitted to process CSG derived waste brine and salts, and
§ capable of converting the CSG derived waste brine and salts into valuable industrial chemicals,
a beneficial use pathway that is required by the existing regulatory framework (see below).
QBS is in active discussions with a range of stakeholders, including from industry in relation to how
QBMC can best provide solutions for enduring waste brine challenges, including for the CSG industry.
Regulatory Framework Report
QBS recently published6
a Regulatory Framework Report outlining the policy and regulatory
frameworks that apply to the production, storage and disposal of CSG derived brines in Queensland.
Key Findings
§ Saline brine presents long-term challenges because salt is difficult to remediate once released
and capable of creating enduring rehabilitation, residual risk and stewardship obligations.
§ Queensland’s regulatory and policy framework prioritises prevention of environmental harm,
resource recovery from waste through beneficial uses and the minimisation of waste disposal.
§ Reliance on interim brine dams and potential disposal via salt encapsulation facilities does not
resolve the underlying long-term liability associated with waste brine and salts.
§ QBMC represents a credible and timely opportunity to shift Queensland’s CSG brine
management from indefinite storage and planned disposal towards beneficial use outcomes.
§ Through QBMC, beneficial use can now be considered a practical and credible pathway.
§ Regulatory settings require operators to consider beneficial use, before reliance on lower-order
brine storage or disposal pathways likely to require stronger, evidence-based justification.
4
Indicative financial metrics, including basis outlined in the 2025 AGM Presentation: https://investorhub.pwnps.com/announcements/7280044
5
Based on annual processing capacity of 75ktpa of contained salts in waste brine, across each of Stages 1 – 4, over nominal 20-year project life, for each
stage. The cumulative processing capacity would result in the processing of approximately 6 million tonnes of contained salts.
6
The Regulatory Framework Report is available at the QBS website, https://www.qldbs.com.
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 6
Technology Commercialisation – Industrial
In parallel with the commercialisation of process technologies being advanced through QBS, Parkway
is also progressing the commercialisation of PPT’s proprietary flowsheets, with applications in industrial,
mining and other major industries.
Modular Process Equipment Systems
Parkway is leveraging its core process technology related capabilities to develop a core product range
focused on complex brine, i) pre-treatment, ii) concentration, iii) crystallisation and iv) chemical
synthesis. These modular process equipment (product) packages will support the rapid development
of Parkway projects including (but not limited to) the QBMC project, as well as provide an efficient go-
to-market capability to offer these packaged equipment systems to third parties.
Parkway is collaborating with multiple leading global equipment (OEM) and engineering (EPC)
contractors, to develop this state-of-the-art offering based on pre-engineered and qualified systems.
Industrial Brine Management Facilities
The modular process equipment systems developed by Parkway for core brine processing flowsheets
including for QBMC are also applicable to a broader range of industrial waste brine related applications.
Parkway is currently collaborating with several interstate operators of major industrial scale liquid waste
management facilities, to evaluate the potential to co-locate industrial brine management facilities
based on PPT technologies. These established liquid waste facilities generally face existing onsite
waste brine challenges, providing attractive co-development opportunities for Parkway. The most
attractive partnership opportunities being advanced by Parkway, involve the establishment of dedicated
joint ventures to address existing (onsite) brine challenges, as well as provide regional brine
management solutions to industry. The proposed industrial brine management facilities would be based
on PPT technologies and leverage the modular process equipment systems, developed by Parkway.
Whilst the proposed brine management facilities are not intended to be a substitute for the strategically
important QBMC, the proposed facilities provide Parkway with an opportunity to accelerate project
development and technology roll-out, given they could potentially be developed on existing (brownfield)
project sites with significant existing infrastructure in place.
Parkway Hitachi – Ultra-High Brine Concentration Systems
As previously announced7
, Parkway is collaborating with Hitachi to develop state-of-the-art ultra-high
brine concentration systems. The initial focus of the collaboration is the development of standardised
modular brine concentration systems (PH-UHBCS) intended to provide compact, modularised, high-
performance and energy-efficient brine concentration capabilities. During the period, significant
progress was made in advancing the engineering design, in preparation for production of the first
system to commence in the near-term. Parkway is in discussions with several parties regarding options
for offsite brine concentration with PH-UHBCS, including for the co-development opportunities outlined
above.
Acid & Metalliferous Drainage (AMD) Opportunities
With the support of the modular process equipment systems, the proprietary flowsheets developed by
Parkway have applications in addressing AMD mine rehabilitation related challenges prevalent across
the mining industry. As outlined above, Parkway is exploring potential opportunities to provide a
technology-based solution (PPT flowsheet) to address AMD related challenges for the project where
Parkway is currently providing a critical mine dewatering solution. One of the potential development
concepts being assessed involves onsite mine pit water pre-treatment and concentration, before the
concentrate is transported to a regional brine processing hub being evaluated by Parkway. This project
would support broader mine rehabilitation related objectives being pursued by the Northern Territory
government, as well as potentially support the development of greenfield mining projects and the
sustainable expansion of existing operating mines in the region.
7
Refer to 19 May 2026 ASX announcement, available at Parkway Investor Hub: https://investorhub.pwnps.com/announcements/7543378
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 7
CORPORATE
Financial Summary
Parkway generated record group operating revenues of approximately $7.71 million during the period,
a 114% increase from the prior corresponding period ($3.61 million, Q1-FY26).
A summary of key financial metrics achieved during the last 15 months, is outlined below in Figure 3.
Figure 3: Group Financial Summary (Q1-FY26 – Q1-FY27)
Note: All financial metrics for the reporting period are based on management accounts and have not been audited, therefore are subject to revision. It should
be noted that EBITDA is a non-GAAP measure. Parkway calculates this excluding non-recurring and non-operational items such as profit or loss on sale of
assets, impairments, redundancies and share-based compensation.
Revenue
Group operating revenue of approximately $7.71 million during the period was Parkway’s highest ever
quarterly revenue result, highlighting the scale of growth achieved by Parkway.
EBITDA
As outlined in Figure 3, the record quarterly operating revenue, underpinned strong underlying earnings
resulting in $0.45 million in underlying EBITDA for the period.
Cash Flow
Cash receipts from customers reached $9.10 million during the quarter. During the same period,
Parkway generated $1.08 million in operating cash flow, whilst $0.41 million was consumed by investing
activities (inclusive of capitalised R&D) and $0.25 million for financing activities. Further details on group
cash flow are outlined in items 1.9, 2.6 and 3.10 of the attached Appendix 5B, respectively. As of 30
September 2026, the company held $3.36 million in cash reserves.
R&D Expenditure
As an industrial technology focused company, Parkway continues to invest in a range of commercially
oriented, industrial research and development related initiatives through the Process Technologies
division. As a result of these ongoing activities, Parkway is eligible for certain, Australian Government
research and development tax incentive (R&DTI) related reimbursements. Subsequent to the reporting
period, in October Parkway received a $0.92 million R&DTI reimbursement for eligible costs incurred
during FY26.
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 8
Inventory
The supply of specialised industrial water treatment related products continues to be an important
component of Parkway’s go-to-market and digital strategy for the Industrial Operations division
operated by PPS. On this basis, PPS carries significant inventory (stock on hand) across its various
operations with the estimated value of inventory at the end of the period of approximately $1.65 million.
Other Items
Investor Relations
The Q1-FY27 quarterly investor webinar is scheduled for 12:00pm AEDT on Friday 30 October 2026.
Further details are outlined in the Activities Subsequent to Reporting Period section, below.
Payments to Related Parties
As outlined in the attached Appendix 5B (item 6.1), during the quarter $0.17 million in payments were
made to related parties and their associates for director and key management personnel salaries,
consultancy fees, superannuation, and other related costs.
Activities Subsequent to Reporting Period
FY26 R&DTI Reimbursement
As a result of ongoing research and development related activities, Parkway is eligible for certain,
Australian Government research and development tax incentive (R&DTI) reimbursements. In October
2026, Parkway received a $0.92 million R&DTI reimbursement for eligible costs incurred during FY26.
Proposed Share Consolidation
To improve the appeal of shares in the Company to both institutional and international investors, on 21
October 2026, Parkway announced the proposed consolidation of the share capital of the Company.
Additional details are outlined in the Notice of Meeting8
. Following the consolidation of shares, Parkway
intends to list its ordinary shares on the US OTCQB. In time, the secondary cross-listing is expected to
increase liquidity, improve price discovery and provide Parkway with access to deeper pools of capital,
including institutional investors familiar with technology-based investment opportunities.
2026 Annual General Meeting
The Annual General Meeting of the Company will be held virtually via Xcend Registry's platform on
Wednesday, 25 November 2026 at 12.00pm (AEDT).
Quarterly Investor Webinar
Parkway will be livestreaming the Q1-FY27 quarterly investor webinar.
Details of the Q1-FY27 quarterly investor webinar with short Q&A are as follows:
Date: 12:00pm AEDT on Friday 30 October 2026.
Presenters: Bahay Ozcakmak (Group MD & CEO)
Mike Hodgkinson (Group CFO & Co-Company Secretary)
Register: To register (registration will require registration at the Parkway Investor Hub), visit:
https://investorhub.pwnps.com/webinars/PBJglP-q1-fy2027-investor-webinar-
parkway-corporate-asx-pwn
8
Refer to ASX announcement: https://investorhub.pwnps.com/announcements/jznlL7-notice-of-annual-general-meeting-proxy-form.
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 9
On behalf of Parkway Corporate Limited.
Bahay Ozcakmak
Group Managing Director & CEO
The attached Appendix 5B has been authorised for release by Bahay Ozcakmak (Group MD &
CEO) and Mike Hodgkinson (Group CFO and Joint Company Secretary).
ADDITIONAL INFORMATION
For further information or investor enquiries, please contact:
Bahay Ozcakmak General Enquiries
Group Managing Director & CEO 1300 7275929
solutions@pwnps.com 1300 PARKWAY
www.pwnps.com SEPTEMBER 2026 | QUARTERLY REPORT | 10
PARKWAY INVESTOR HUB
To stay up to date with the latest news, access additional investor related resources including research reports and
interact with Parkway by posting questions and feedback through a Q&A function, we encourage investors to sign-
up to the Parkway Investor Hub.
How to sign-up to the Parkway Investor Hub
1. navigate to https://investorhub.pwnps.com/welcome
2. follow the prompts to sign up for an Investor Hub account.
3. complete your account profile.
or Scan QR Code to visit the Parkway Investor Hub.
ABOUT PARKWAY CORPORATE LIMITED
Parkway is a leading Australian water & wastewater treatment and process technology company. Parkway is
focused on the commercialisation of a portfolio of innovative process technologies in key industrial markets, as
Parkway believes this is an important and effective strategy for addressing various global water related
sustainability challenges.
In recent years, Parkway has made significant investments in groundbreaking research and development (R&D)
related activities, including in the acquisition, development, validation and optimisation of a comprehensive portfolio
of cutting-edge industrial water treatment related process technologies.
In support of Parkway’s accelerated technology commercialisation strategy, Parkway primarily operates through
two strategically integrated capacities:
§ Industrial Operations business division is focused on the provision of conventional water and
wastewater treatment related products & services, including fabrication as well as project delivery related
services including installation, for a broad range of predominantly commercial, municipal and industrial
clients.
§ Process Technologies business division is primarily focused on innovative process technology related
R&D, including process screening, evaluation, optimisation and piloting, as well as a range of technology
commercialisation related activities.
Integrated Capabilities
Parkway has assembled a fully integrated inhouse project delivery capability, including for the innovative process
technologies being developed and commercialised by Parkway.
Additional information regarding Parkway, including an overview of the corporate structure of Parkway and the
companies in its corporate group, can be found at: www.pwnps.com
FORWARD-LOOKING STATEMENTS
This announcement may contain certain “forward-looking statements”. The words “continue”, “expect”, “forecast”,
“potential” and other similar expressions are intended to identify “forward-looking statements”. Indications of (and
any guidance on) future earnings, financial position, capex requirements and performance are also “forward-
looking statements”, as are statements regarding internal management estimates and assessments of market
outlook.
Where Parkway expresses or implies an expectation or belief as to future events or results, such expectation or
belief is expressed in good faith and believed to have a reasonable basis. However, “forward-looking statements”
are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors,
many of which are beyond the control of Parkway, its officers, employees, agents and advisors, that may cause
actual results to differ materially from those expressed or implied in such statements. There can be no assurance
that actual outcomes will not differ materially from these statements. There are usually differences between forecast
and actual results, because events and actual circumstances frequently do not occur as forecast and their
differences may be material.
Parkway does not undertake any obligation to publicly release any revisions to any "forward-looking statements"
to reflect events or circumstances after the date of this announcement, or to reflect the occurrence of unanticipated
events, except as may be required under the applicable securities laws.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Parkway Corporate Limited
ABN Quarter ended (“current quarter”)
62 147 346 334 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
9,104 9,104
1.1 Receipts from customers (inclusive of GST)
1.2 Payments (inclusive of GST) for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (858) (858)
(e) administration and corporate costs (164) (164)
1.3 Dividends received (see note 3) - -
1.4 Interest received (see below*)
1.5 Interest and other costs