Extension of Potash and Phosphate Mineralisation
Released
Released
Announcement PDF
ASX Announcement
11 May 2016
_____________________________________________________________________________________
COMPANY DETAILS
POTASH WEST REPORTS EXTENSION OF POTASH AND PHOSPHATE
MINERALISATION TO THE SOUTH OF DINNER HILL
ABN: 62 147 346 334
PRINCIPAL
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
HIGHLIGHTS:
•
Thick sequences of geologically continuous, high grade potash
mineralisation confirmed at Dinner Hill South.
•
Significant intersections include
o 40m @ 4.35% K2O from 24m in PWAC 511
o 34m @ 4.71% K2O from 30m in PWAC 512
•
New discovery is some 10km south of the current Dinner Hill resource
and presents potential development alternatives.
•
Mineralisation open to the north, west and east.
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
W www.potashwest.com.au
E info@potashwest.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
OTC PINK
PWNNY
CORPORATE
INFORMATION
11 May 2016
234M Ordinary shares
36M Partly paid shares
17M Listed options
3M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director)
Potash West NL (ASX: PWN) (the Company) is pleased to report on the results
of drilling undertaken in March 2016.
The Company is progressing the Dinner Hill project within the Dandaragan
Trough area in Western Australia, which contains phosphate and potassium
rich deposits of greensands (Figure 1). The current land holding is over 2600
km2, within which the Dinner Hill resource covers an area of 20 km2 in the
north-west of the trough and is easily accessible by sealed roads.The program
consisted of 20 vertical aircore holes for a total of 676m across tenements
E70/4609 and E70/4138, (Figure 2).
The objective was to test for the southern extension of potash and phosphate
mineralisation in a geologically similar environment to the Dinner Hill Deposit.
Dinner Hill is estimated to contain an Indicated Mineral Resource of 250Mt at
2.9% P2O5 and Indicated and Inferred Mineral Resources containing 195Mt at
3.8% K2O (ASX Release 03 June 2015). The target horizons at Dinner Hill are the
upper greensand units of the Coolyena Group, the Poison Hill Greensand and
the Molecap Greensand. Of these the Molecap Greensand is host to the
majority of the phosphate and potash mineralisation and as such is the
preferred target.
1
Potash West NL – March 2016 Aircore Drilling Results
May 2016
Two areas were drilled. A road verge program on E70/4609 evaluated an area in the north of the tenement
with traverses along Badgingarra and Wolba roads between 15km and 30km south of Dinner Hill. On
E70/4138 recently concluded land access agreements permitted drilling on a freehold land, Lot 7 Mundegar,
some 10km south of Dinner Hill.
Figure 1: Dandaragan Trough
2
Potash West NL – March 2016 Aircore Drilling Results
May 2016
Potash West Managing Director, Patrick McManus, said “we are excited about the grade and thickness of
the potash mineralisation lying to the immediate south of our Dinner Hill resource. The thickness of the
mineralised units has the potential to lower strip ratios and improve mining economics. These results
demonstrate continuity of phosphate and potash mineralisation to the south. With additional drilling, the
new discovery is likely to offer alternative development options for the project. Further drilling will be
targeted at establishing a resource on Dinner Hill South”
Figure 2: Location plan, March 2016 aircore drilling
3
Potash West NL – March 2016 Aircore Drilling Results
May 2016
RESULTS
Thick sequences of high grade potash mineralisation were intersected on the central and eastern part of
Lot 7 (Figure 3). Of significance is the fact that the mineralisation is open to the north, east and south. The
base of oxidation is generally shallow with much of the profile well preserved with potash mineralisation
starting at a depth of 2m in PWAC512.
Figure 3: Summary drill intercepts Lot 7, E70/4138
Deep weathering along the road verge traverse in E70/4609 has resulted in only a single hole, PWAC502
having significant potash mineralisation (Figure 4). Phosphate intercepts were sporadic with high grades
over narrow intervals.
4
Potash West NL – March 2016 Aircore Drilling Results
May 2016
Figure 4: Summary drill intercepts road verge traverse E70/4609
GEOLOGY
E70/4138 – Lot 7
Eight holes were drilled on Lot 7, Mundegar on an approximate 800m by 1600m grid. Greensand units
thickened to the east with the Poison Hill Greensand attaining a thickness of 43m and the Molecap
Greensand being up to 16m thick. The Poison Hill Greensand is variably oxidised. Encouragingly the
preferred target unit, the Molecap Greensand is well preserved and unoxidised over much of the property
E70/4609 – Road Verge Drilling
Both host units, the Poison Hill Greensand and the Molecap Greensand were intersected in 8 out of the 10
holes drilled. The greensands were found to be up to 12-15m thick over the majority of the traverse. There
is a noticeable thinning to 3-4m in the north where elevations are reduced and large portions of the target
horizons have been removed by erosion. Much of the target sequence along the traverse has been
pervasively oxidised with an attendant decrease in both potash and phosphate grades.
RESULTS
E70/4138 – Lot 7
Significant widths of potash mineralisation were intersected in Lot 7 with a best intersection of 40m @
4.35% K2O from 24m in PWAC511. Depth to potash mineralisation from surface is on average 19m varying
from only 2m, (PWAC512) to 35m (PWAC513). Encouragingly, the mineralised Molecap Greensand
continues to thicken to the south. On Lot 7 it averages around 14m thick compared with the Dinner Hill
resource area where the unit was, on average, some 9m thick.
5
Potash West NL – March 2016 Aircore Drilling Results
May 2016
Nodular phosphate mineralisation was restricted to the east of the property. The best result was 30m
@2.24% K2O from 29m in PWAC512.
Hole
East (m)
North (m)
RL (m)
From (m)
To (m)
PWAC509
PWAC511
371106
372725
6627991
6627993
334
344
16
24
30
2
30
29
35
47
34
19
33
64
46
19
64
59
42
59
53
31
PWAC512
372837
6626389
341
PWAC513
372011
6625927
347
PWAC514
371263
6626449
329
Interval
(m)
17
40
16
17
34
30
7
12
19
12
K 20 %
P205
%
4.98
4.35
1.99
4.81
4.71
2.24
5.39
5.23
1.98
4.37
Table 1: E70/4138 Significant intersections
Note:
Coordinate system is the MGA94, Zone 50
All holes drilled vertical
Composite parameters
Lower cut-off grade 2% K2O
Fe/K ratio <4.75 (to exclude oxidised material)
Al/K ratio <2.5 (to exclude refractory potash from feldspars)
Lower cut-off grade 1% P2O5
CaO/ P2O5 ratio >0.66 to exclude currently unrecoverable secondary phosphate
E70/4609 – Road Verge
Significant potash mineralisation was only intersected in a single hole, PWAC502, 13m @ 4.78% K2O from
22m. This reflects the deep weathering along the traverse with resulting leaching of potash from the profile.
Phosphate grades were generally above the Dinner Hill resource grade but intersections were generally
narrow.
East
(m)
PWAC497 371166
PWAC498 371856
PWAC502 369562
Hole
North
(m)
6610251
6610550
6615141
RL (m)
289
257
311
From
(m)
36
15
23
22
To (m)
41
18
35
34
Table 2: E70/4609 Significant intersections
Note:
Composite parameters are detailed with Table 1
6
Interval
(m)
5
3
12
13
K2 0 %
P205 %
4.89
4.38
2.87
4.78
Potash West NL – March 2016 Aircore Drilling Results
May 2016
For further information, contact:
Potash West NL:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Email: info@potashwest.com.au
Web: www.potashwest.com.au
Attachments:
Appendix 1 JORC CODE ,2012 EDITION- Table1
Appendix 2- March 2016 drill hole details
About Potash West
Potash West (ASX:PWN) is an exploration and development company focused on developing large
greensand deposits in West Australia’s Perth Basin. The Company aims to define a substantial resource
base and investigate how best to recover phosphate, potash and other minerals from the Dandaragan
Trough. The project is well situated in relation to infrastructure, with close access to rail, power and gas. A
successful commercial outcome will allow the Company to become a major contributor to the potash and
phosphate markets at a time of heightened regional demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 2,600km2. Previous exploration indicates
glauconite sediments are widespread for more than 150km along strike and 30km in width. Current JORC
compliant Indicated Mineral Resources stand at 250Mt at 2.9% P2O5 of phosphate mineralisation and
175Mt at 4.2% K2O, amenable to processing by the K-Max process. A pre-feasibility is in progress for stage
1, production of phosphate fertilisers.
The company has 55% of a potash exploration project in the South Harz region of Thuringia, in Central
Germany. The region has been a potash producing area for over 100 years
Competent Person’s Statement:
The information in this report that relates to Exploration Results is based on information compiled by Lindsay
Cahill, who is a member of the Australian Institute of Geoscientists. Mr. Cahill is a consultant to the mining
industry, and has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration. He is qualified as a Competent Person as defined in the 2012 edition of the “Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. This report is issued with
Mr. Cahill’s consent as to the form and context in which the exploration results appears.
7
Potash West NL – March 2016 Aircore Drilling Results
May 2016
APPENDIX 1 - JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
Criteria
Commentary
Sampling techniques
• Air-core drilling was used to obtain 1m samples from target horizons;
• Hole spacing varied from 800m to 1600m
Drilling techniques
• Vertical NQ Air-core
Drill sample recovery
• Clay content of moist greensands ensured acceptable recovery and
retention of all size fractions;
• Holes were flushed and conditioned at completion of each 3m rod
• Cyclone opened and cleaned at the completion of each rod
Logging
• All intervals geologically logged directly into a field computer using a
database designed to capture relevant data including, oxidation, grainsize,
rounding, sorting, mineralisation, hardness, colour and stratigraphic unit.
All logging sample layouts are photographed and chip trays stored for future
reference.
Sub-sampling
techniques and sample
preparation
• Samples were split by rig mounted rotary splitter to a sub-sample size of 3
to 4kg for dispatch to commercial laboratory for assay
Quality of assay data
and laboratory tests
• Analysis by Genalysis Laboratory Services Pty Ltd by Phosphate Major
Element Suite FB1 method (XRF after lithium borate fusion)
• Internal laboratory checks reported with assays
Verification of
sampling and assaying
• Sampling and logging verified by site visits by Exploration Manager. Logging
checked against major element assays and sample photography;
• Field duplicate samples were collected from the rotary splitter at the rate of
1 for every 18 routine samples.
• Certified Reference samples submitted blind at the rate of 1 for every 18
routine samples.
• Analysis of quality control data indicates a high level of repeatability of the
elements of interest,
• Assay entry by digital capture of laboratory files, with later verification of
significant intervals against original files.
Location of data points
• Holes located by hand held GPS;
• Grid MGA_GDA94, Zone 50;
• Elevation data is based on a topographic contour set produced from SRTM
imagery at 5m vertical resolution.
Data spacing and
distribution
• 1m samples collected and analysed throughout mineralized horizons;
• Hole spacing varied from 800m to 1600m
Orientation of data in
relation to geological
structure
• Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
Sample security
• Samples bagged and labelled by Potash West personnel
• Samples transported to laboratory by approved commercial contractor
8
Potash West NL – March 2016 Aircore Drilling Results
May 2016
Criteria
Commentary
Audits or reviews
• Historical sample techniques, logs, and data reviewed positively by
independent consultant geologist.
Section 2 Reporting of Exploration Results
Criteria
Commentary
Mineral tenement and
land tenure status
• E70/4609 is held and operated by Potash West NL
• The drilling in E70/4609 was conducted along Wolba and Badgingarra Roads
and approved by the Shire of Dandaragan
• E70/4138 is held and operated by Potash West NL
• The drilling in E70/4138 is located on private freehold land owned by KLK
Farms Pty Ltd with whom compensation agreements have been signed, with
the mineral sub-surface rights subsequently being granted both above and
below 30m below surface.
Exploration done by
other parties
•
•
Exploration for phosphate in the area of the current E70/4609 dates back
to the 1940’s.
Potash West has carried out drill drilling in E70/4138 north of the current
program
Geology
• The phosphate is present as fluorapatite nodules and grains concentrated
within particular horizons of horizontal greensand and chalk formations;
• The potash is present as the mineral glauconite, which is a major constituent
of the Molecap and Poison Hill Greensands and a minor constituent of the
Gingin Chalk.
Drill hole Information
• See Appendix 2.
Data aggregation
methods
• For composited intersections the following parameters have been adopted
Lower cut-off grade 2% K2O
Fe/K ratio <4.75 (to exclude oxidised material)
Al/K ratio <2.5 (to exclude refractory potash from feldspars)
Lower cut-off grade 1% P2O5
CaO/ P2O5 ratio >0.66 to exclude currently unrecoverable secondary
phosphate
No upper cut used
• No metal equivalent values used.
Relationship between
mineralisation widths
and intercept lengths
Diagrams
• Vertical drilling through virtually horizontal stratigraphy resulted in
intersected thicknesses equivalent to true thickness.
Balanced reporting
• Grades are consistent across deposit;
• Intersection grades shown on diagrams show consistent hole to hole grades.
• Diagrams are included in the report
Other
substantive • There is no unreported substantive exploration data
exploration data
Further work
• Infill drilling will be planned for Lot 7 in E70/4138
• Step out drilling around positive intersections in E70/4609 will commence
when agreement with landowners have been completed.
9
Potash West NL – March 2016 Aircore Drilling Results
May 2016
Appendix 2: March 2016 drill hole details
Note:
Coordinate system is the MGA94, Zone 50
All holes drilled vertical
Hole
PWAC496
PWAC497
PWAC498
PWAC499
PWAC500
PWAC501
PWAC502
PWAC503
PWAC504
PWAC505
PWAC506
PWAC507
PWAC508
PWAC509
PWAC510
PWAC511
PWAC512
PWAC513
PWAC514
PWAC515
East (m)
369415
371166
371856
370866
369925
369660
369562
369554
369474
369485
369346
369103
370276
371106
371887
372725
372837
372011
371263
370412
North (m)
6610233
6610251
6610550
6611280
6612743
6613737
6615141
6615983
6616562
6617595
6618458
6619160
6628001
6627991
6627994
6627993
6626389
6625927
6626449
6626401
10
RL (m)
290
289
257
282
285
299
311
290
286
291
283
272
307
334
365
344
341
347
329
302
Depth (m)
63
54
24
30
18
27
39
18
15
21
9
6
15
41
32
73
69
59
39
24
Share your feedback
Discover