PWN Achieves Significantly Improved Economics for DinnerHill
Released
Released
Announcement PDF
ASX Announcement
13 January 2015
_____________________________________________________________________________________
COMPANY DETAILS
POTASH WEST ACHIEVES SIGNIFICANTLY IMPROVED ECONOMICS
FOR DINNER HILL PROJECT
ABN: 62 147 346 334
o Study confirms significant improvements in economics through
PRINCIPAL AND
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
W www.potashwest.com.au
E info@potashwest.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
OTC PINK CODE
PWNNY
CORPORATE
INFORMATION
(13 January 2015)
200M Ordinary shares
36M Partly paid shares
5M Unlisted options
8M Listed options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Gary Johnson
(Non-Executive Director)
Chew Wan Chuen
(Non-Executive Director)
integrating potash and phosphate plants
o Estimated average cash costs of A$40/tonne of ROM ore
o Estimated average revenue of A$91/tonne of ROM ore
o IRR of 30%
o NPV12% of A$652 million
o Stage 1 capital requirement of $136 million. Staged development allows
for initial cashflow to assist with expansion Capex
o Progressing towards a Definitive Feasibility Study
Potash West (the Company) (ASX: PWN) is pleased to announce the results of a
financial evaluation for the production of phosphate and potash fertilisers on its
wholly-owned Dandaragan Trough Project, located 150 km north of Perth in Western
Australia.
The study assumes the production of single superphosphate (SSP) in a standalone plant
for the first 5 years of operation. Subsequently, the glauconite concentrate and
phosphate rock will be processed in a joint facility (Integrated K-Max plant) to produce
potash products, potassium sulfate, potassium magnesium sulfate and merchant grade
phosphoric acid, as well as iron oxide and, aluminium sulfate for the remaining life of
mine.
The Scoping Study (+/- 35% accuracy) further demonstrates the robust nature of
Potash West's Dandaragan project.
The Scoping Study referred to in this report is based on low-level technical and economic assessments,
and is insufficient to support estimation of Ore Reserves, to provide assurance of an economic
development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be
realised.
Unless otherwise stated, all cashflows are in Australian dollars, are undiscounted and are not subject to
an inflation/escalation factor.
The Company has concluded that it has reasonable basis for providing the forward looking statements
included in this announcement. The detailed reasons for that conclusion are outlined throughout this
announcement and in particular in the appendix “A” headed “Forward Looking and Cautionary
Statements”.
1
Potash West NL – Dinner Hill Project Update
January 2015
OVERVIEW
Potash West has previously completed high level scoping studies evaluating the production of potash, alum
and phosphates (ASX Announcement 10 January 2013) and evaluating the production of single
superphosphate (SPP) (ASX Announcement 17 September 2013). These studies evaluated the projects as
stand-alone operations.
The synergies of combining both projects was recognised but not pursued as stand-alone projects were at
the forefront of considerations at that time.
However, as the phosphate resource lies directly above the K-Max resource, the concept of a staged
production profile was clearly identified as being cost effective and viable.
The Scoping Study is based upon the JORC compliant Mineral Resource quoted for the Dinner Hill
phosphate deposit which includes an Indicated Resource of 120Mt at 2.8% P2O5, 3.1% K2O and 8.2% CaO
(see ASX announcement 20 March 2014).
The study involves the production of SSP at a site near the Dinner Hill deposit for the first 5 years of
operation. The ore will be processed through a beneficiation and acidulation plant. The pelletised product
will be transported by road to Moora and dispatched by rail to Kwinana and / or Geraldton for local and
international distribution. The processing facility will operate using sulfuric acid delivered to site from
Kwinana, Western Australia. The beneficiation plant will produce a glauconite concentrate, which will be
stockpiled for later treatment.
During the fourth and fifth years of operation the Integrated K-Max plant (which will process the phosphate
and potassium containing minerals) will be constructed and commissioned. The mining and beneficiation
process will be unchanged. The integrated plant will receive glauconite containing magnetic concentrate
and phosphate rock from the beneficiation plant. The Integrated K-Max plant will produce potassium
sulfate (SOP), potassium magnesium sulfate (KMS), iron oxide and aluminium sulfate. A sulfur burning
acid plant will be installed to generate the acid requirements for the plant.
The installation of the Integrated K-Max plant allows for the production of phosphoric acid from the
phosphate concentrate and phosphate contained in the magnetic concentrate. The production of phosphoric
acid, as opposed to SSP, is viable due to the on-site acid plant, cheaper transportation costs and larger
phosphoric acid market.
Key outcomes are:
•
•
•
•
•
•
•
Processing rate
Mine life
Average LOM revenue per year
Average LOM Operating cash costs per year (inclusive of royalties)
IRR
NPV12%
EBITDA, per year
4.2 Mtpa
+20 years
$380 million
$168 million
30%
$652 million
$212 million
Managing Director Patrick McManus said: “When conducting the earlier phosphate only Scoping Study we
recognized that synergies existed for the staged production of phosphate, potash and other commodities
with the implementation of phosphate and K-Max plants, utilizing the same mining and beneficiation plant.
This Scoping Study has demonstrated the major benefits of new economies of scale. The Stage 1 Capital
requirement is $ 136 million and a significant amount of the stage 2 Equity financing could be funded from
operating cashflows”.
He added “It is important to note that the resources underpinning this model are based on 10 sq km of the
Dinner Hill project area. Within the 60 sq km of Dinner Hill an exploration target between 1 and 1.5
Billion tonnes has been reported ( refer ASX announcement May 7 2013). The optionality to increase the
scale of the operation is very valuable”.
2
Potash West NL – Dinner Hill Project Update
January 2015
INTRODUCTION
Potash West NL is a mineral exploration company focused on developing phosphate and potassium-rich
greensand deposits in West Australia’s Perth Basin. The Company’s flagship project is the Dandaragan
Trough, which is one of the world’s largest greensand deposits. The project has unique advantages in
excellent connectivity to transport facilities, infrastructure and proximity to local markets.
The Company holds exploration licenses and applications in 12 tenements in the Dandaragan Trough
region north of Perth. The tenements cover an area of 2,628 km2 (see Figure 1).
Figure 1: Land Tenure Dandaragan Trough Project
3
Potash West NL – Dinner Hill Project Update
January 2015
The Dinner Hill Deposit is located within the Dandaragan Trough in the Mid-West of Western Australia,
some 225km by road north of Perth. The deposit is accessed from Perth via the Brand Highway (Figure 2).
Figure 2: Dinner Hill Phosphate Deposit - tenure and infrastructure
Since listing in May 2011 the Company has been working on two parallel activities:
• Establishing a JORC compliant resource; and
• Developing a process flowsheet that extracts valuable commercial products from the greensands.
Both of these targets have been achieved. In October 2012 a JORC compliant resource of 244Mt at 3.0%
K2O and 1.6% P2O5 was announced. A scoping study was completed in January 2013, which demonstrated
the technical and financial viability for the proposed development of a facility (K-Max process) at the
Dandaragan Trough Project, producing a range of commodities (ASX: 10 January 2013).
It was quickly realised by the Company that there was potential value in recovering the phosphate content
present in the greensands in a stand-alone plant. This was identified after undertaking the Potash Scoping
Study, which highlighted the value of the significant advantages of the location and geology of the
resource. The relatively short distance to ports and market, well-established infrastructure and friable
mineralisation - which sits close to surface - were all seen as key advantages over most other global
“greenfields” phosphate projects.
Work carried out to define this value consisted of the following:
• Definition of a higher grade phosphate resource from Dinner Hill drill hole data;
• Development of a processing flowsheet to produce a saleable phosphate product; and
• Conducting an initial economic assessment.
4
Potash West NL – Dinner Hill Project Update
January 2015
Specialist geological services company Continental Resource Management Pty Ltd, (CRM) conducted
geological modeling and resource estimation at the Dinner Hill Phosphate Deposit which was estimated to
contain an Indicated Mineral Resource of 120Mt at 2.79% P2O5 and 3.15 K2O above a cut-off of 2.15%
P2 O5. (ASX: 20 March 2014). Preliminary test work and economic modeling suggested commodity grade
phosphate rock could be concentrated from the greensands by conventional processing steps and the
production of single superphosphate (SPP) had favorable economics. Based on this data, a Scoping Study
to produce SSP from greensands at Dinner Hill was completed in September 2013 (ASX: 17 September
2013)
While conducting the phosphate Scoping Study, Potash West recognised the potential synergies of
processing both the phosphate rich ore and glauconite rich ore as a single operation. A Scoping Study to
produce phosphate and potash products from the Dinner Hill resource was subsequently conducted.
GENERAL
Potash West commissioned Strategic Metallurgy to generate a process package for the treatment of Dinner
Hill ore in an integrated phosphate and potash plant (Integrated K-Max plant). The process package which
formed the basis of this scoping study, is based on the results of previous testwork programs and recent
computer modeling. The documentation included process flow diagrams, process design criteria, mass
balance, process description and capital and operating cost estimates for a project treating 4.2 Mtpa of
Dinner Hill greensands.
The study was based on the production of SSP at a site near the Dinner Hill deposit for the first 5 years of
operation. During the fourth and fifth years of operation the Integrated K-Max plant will be constructed
and commissioned. This plant will receive glauconite rich magnetic concentrate from the beneficiation
plant from year 6 for the remaining life of mine. It will also treat the phosphate rich coarse (+ 0.5mm
material) via grinding flotation and acid treatment. This scale of operation produces an average of 390
ktpa of single superphosphate in the first 5 years and 152 ktpa SOP, 136 ktpa KMS, 152 ktpa merchant
grade phosphoric acid, 223 ktpa iron oxide and 764 ktpa aluminium sulfate for the remaining life of mine.
CRU had previously been commissioned to investigate potential sale volumes and prices for single
superphosphate, SOP, KMS, iron oxide and aluminium sulfate for the Potash Scoping Study, which was
reported in January 2013. These values were utilized in this study. The phosphoric acid price used for this
study was derived from CRU’s weekly fertiliser pricing reports. A price discount was applied over the first
five years for each plant to allow for market penetration.
MINING AND PRIMARY BENEFICIATION
The greensand deposits of the Dandaragan Trough are an unconsolidated mixture of silica, glauconite and
apatite, not dissimilar in physical characteristics to mineral sand deposits that are mined close by at Cataby
and Eneabba. Mining will be carried out by techniques that are well established in those deposits. Topsoil
and overburden will be mined by scrapers, with topsoil replaced as soon as practical.
Mineralisation will be mined by a bulldozer, which feeds an in-pit slurry unit. The slurry will be pumped
to a concentrator, where material will be screened and de-slimed. Plus 0.5 mm material contains the bulk
of the phosphate and will be milled prior to being fed to the flotation plant.
As part of the rehabilitation process, flotation tailings and slimes will be de-watered and returned to the
mine void, covered with overburden and then contoured and covered with topsoil. It is estimated that it
will take approximately 5 years from mining to return to end-use, although this might be slightly longer as
operations are established.
5
Potash West NL – Dinner Hill Project Update
January 2015
PROCESSING
During the first 5 years, the mined greensands will be treated in a superphosphate processing plant
consisting of conventional unit operations, including scrubbing, screening, de-sliming, magnetic separation
and flotation to produce phosphate rock containing >30% P2O5. The phosphate rock will be acidulated
using purchased sulfuric acid to produce SSP containing >18% P2O5. A diagram of the process is
presented in Figure 3.
Figure 3: Phosphate Process Flowsheet
The key operating parameters include:
• Screening at 0.5 mm recovers approximately 63% of the contained phosphate for direct feed to the
flotation plant.
• De-sliming and magnetic separation recovers a further 7% of the contained P2O5 for direct feed to
the flotation plant.
• Flotation, reverse flotation (for calcite removal) and magnetic separation recovers 83% of the
phosphate from the flotation feed to the phosphate concentrate.
• Acidulation recovers 100% of the phosphate from the phosphate concentrate to the SSP product
• An overall phosphate recovery of 58.1%.
The major attributes of the processing plant include the relatively simple and low cost upgrade of the
phosphate mineralisation from an average head grade of 2.79% P2O5 to approx. 5.4% P2O5 for feed to the
flotation plant. This involves a phosphate recovery of 70% to only 36% of the mass. These processing
steps, which include screening, de-sliming and magnetic separation, are low cost and relatively easy to
operate. The significant upgrade allows for smaller downstream processing units.
The main reagents required include sulfuric acid, for the acidulation process, and fatty acid, for flotation. It
6
Potash West NL – Dinner Hill Project Update
January 2015
is assumed that the reagents will be delivered to site by road from Kwinana. Slimes will contain a
significant fraction of calcite. Neutralization of excess gas scrubber water will be effectively managed by
reaction with part of the slimes material.
The Integrated K-Max plant will involve additional equipment to process the phosphate concentrate to
phosphoric acid and glauconite to potash products, SOP and KMS, as well as iron oxide and aluminium
sulfate by-products. The Integrated K-Max plant will involve the construction and operation of a sulfur
burning acid plant, which will provide sulfuric acid and steam. A natural gas-fired boiler will be installed
to supplement the steam requirements. The production of phosphoric acid, as opposed to SSP, appears
viable due to the on-site acid plant, cheaper transportation costs and larger phosphoric acid market. A
diagram of the process is presented in Figure 4.
Figure 4: Integrated K-Max Process Flowsheet
The key operating parameters of the integrated plant will include:
• Leaching phosphate concentrate to produce phosphoric acid and gypsum cake.
• Leaching the glauconite containing magnetic concentrate to produce a leach liquor composed of
approximately 95% of the contained potassium, magnesium, aluminium, iron and phosphorus.
• Several selective crystallisation stages and a calcination stage to produce SOP, KMS, iron oxide
and aluminium sulfate.
• Potassium and magnesium recoveries of 92.9% and 83.2%, respectively, from the magnetic
concentrate to final products.
• Leaching of the phosphate containing iron oxide and selective crystallisation to recover phosphoric
7
Potash West NL – Dinner Hill Project Update
•
January 2015
acid and sale-able iron oxide.
An overall phosphate recovery of 69.5%
TAILINGS
Tailings from the process are benign, consisting of un-reacted calcite, goethite, silica and leach residue which consists mainly of amorphous silica. A small volume of acidic liquor, generated from the
acidulation plant off-gas scrubber, will be neutralized with limestone tailings prior to disposal. Tailings
from the plants will be pumped to a tailings storage facility. Tailings will be dewatered then returned to the
pit as back fill.
INFRASTRUCTURE
For the purpose of the Scoping Study, the phosphate only processing facility is assumed to be located
between the towns of Moora and Dandaragan, both towns are approximately 170 km north of Perth. It will
be well positioned with respect to road and rail access and located within 30 km of the electricity utility
corridor. The Integrated K-Max operation has been assumed to be located near the town of Moora, close to
the existing rail network. The following infrastructure has been factored into the capital and operating cost
estimates:
•
•
•
•
•
•
The processing plants power demand will be supplied from the South West Interconnecting
Network (SWIN). The sites can be serviced from existing transmission infrastructure at Moora or
Cataby.
Western Power’s Mid-West Energy Project (MWEP) will increase electrical capacity in the MidWest from the current 150 MW to 680 MW by 2018. This will provide for the power draw
required in future plant expansions.
Make-up water will be supplied from local borefields. Water will be recovered from the tailings
facility.
Glauconite and phosphate containing concentrates will be pumped from the beneficiation plant
(close to deposit) to the Integrated K-Max plant in Moora by pipeline.
The main imported reagents will be delivered to site in bulk on sealed road or the existing rail
network.
Export products will be dispatched from the site in Moora and delivered to Geraldton or Kwinana
on the existing rail network.
CAPITAL COST
The capital cost for the project was based on information contained in the Dandaragan Trough Potash
Project Scoping Study Report (Potash Scoping Study), budget quotations and process design criteria
provided by Strategic Metallurgy. Equipment costs were factored using standard industry techniques. The
costing was based on a design package prepared by Strategic Metallurgy Pty Ltd with a nominal throughput
rate of 4.2 Mtpa of ore. The design package comprised:
• A complete set of flowsheets for the process,
• Process design criteria based on the nominal throughput rate; and
• A report detailing the testwork supporting the process design.
8
Potash West NL – Dinner Hill Project Update
January 2015
The accuracy of the estimate is considered to be +/- 35%, which is appropriate for a Scoping Study. A
summary of the capital costs of the standalone phosphate plant is provided in Table 1 and additional costs
for the Integrated K-Max plant are provided in Table 2.
A$ millions
Mining plus mobilisation
Total
Process Plant
Beneficiation (screening, magnetic separation, flotation)
Acidulation and product handling
Services
Total
Infrastructure
On-site
Off-site
Total
Indirect costs (including 12% contingency)
Total
$4.3
$35.8
$28.1
$3.1
$67.0
$26.0
$7.2
$33.2
$31.2
TOTAL
$135.7
Table 1: Capital Cost Estimate for Stage 1, Phosphate Plant
A$ millions
Process Plant
Leaching and recovery
Product handling
Reagents and Services
Total
$166.3
$9.1
$184.4
$359.8
Total
$45.0
$45.4
$90.4
Total
$140.0
TOTAL
$590.3
Infrastructure
On-site
Off-site
Indirect costs (including 12% contingency)
Table 2: Capital Cost Estimate for Stage 2, Integrated K-Max Plant
9
Potash West NL – Dinner Hill Project Update
January 2015
OPERATING COST
The operating costs for the projects were estimated from first principles based on the Process Design
Criteria in Strategic Metallurgy's design package. Contained in the operating costs are estimates for:
• Personnel Requirements
• Reagent Consumption and Consumables
• Power Consumption
• Maintenance Materials
The operating costs are summarised in Table 3.
A$/tonne of ROM ore
1-5 years
6-20 years
Mining and Rehabilitation (including overburden)
Total
Process Plant (including transport of reagents)
Labor
Reagents
Consumables, fuel and vehicles
Maintenance materials
Power
Total
Railing and shipping
National road and rail
International shipping
Total
Royalties
Total
TOTAL
$3.56
$3.89
$2.31
$7.60
$0.66
$1.12
$1.63
$13.33
$6.96
$15.27
$0.66
$4.16
$6.65
$33.70
$1.13
$0.70
$1.83
$4.12
$2.70
$6.82
$1.76
$2.75
$20.47
$47.16
Table 3: Operating Cost Estimate
ENVIRONMENT AND PERMITTING
Land use in the Dandaragan Trough region is principally farming, and the Company’s tenements are
exclusively within freehold land and road reserves.
A desktop study was completed over the Dinner Hill area (proposed mine site) and a broader region in the
east of the Project Area (proposed plant site). The study objectives were to identify any key environmental
issues associated with the sites.
Environmental constraints consistent with the locality were identified as typical for an agricultural region
of Western Australia. As most of the mining site land use is agricultural and pastoral, constraints are likely
to be localised to stands of remnant vegetation. These are typically managed by rehabilitation methods
well established at other mining operations in the region.
There is flexibility in the processing plant sites, so they can be located to manage the environmental
impacts, consistent with good planning practice.
10
Potash West NL – Dinner Hill Project Update
January 2015
MARKETING AND PRODUCT PRICING
CRU was commissioned by Potash West in November 2012 to undertake a marketing and pricing study for
products generated from the K-Max study, which included data for SSP. CRU is a respected, independent
research company with deep experience in the fertiliser industry and in the supply, demand and pricing of
fertiliser products.
At a mining rate of 4.2 Mtpa an average of 390 ktpa SSP will be produced in the first 5 years. From year 6
onwards an average of 152 ktpa SOP, 136 ktpa KMS, 152 ktpa merchant grade phosphoric acid, 223 ktpa
iron oxide and 764 ktpa aluminium sulfate will be produced for the remaining mine life. The CRU
recommended sales price are listed in Table 4 for SSP and Table 5 for the products generated from the
Integrated K-Max plant. These prices are listed as CFR and, as such, domestic and international
transportation costs have been taken into account in the economic analysis.
In addition, a discount on sales revenue was applied for the first 5 years of each operation, in recognition of
a discount considered necessary to achieve market penetration. It is anticipated that sales volumes and
prices will be better defined as part of the feasibility study.
Year
1
2
3
4
5
Sales price (US$/t)
$350
$350
$350
$350
$350
Discount
10%
8%
6%
4%
2%
Exchange rate
0.88
0.88
0.88
0.88
0.88
Sales Price A$/t
$358
$366
$374
$382
$390
Table 4: Single Superphosphate sales prices and discounts
Commodity
Phosphoric acid
SOP
KMS
Iron oxide
Aluminium sulfate
Year 6-10
Sales price Exchange
Sales
(US$/t)
rate
price A$/t
$800
0.88
$909
$500
0.88
$568
$280
0.88
$318
$0
0.88
$0
$128
0.88
$145
Year 11-20
Sales price Exchange
(US$/t)
rate
$900
0.88
$700
0.88
$300
0.88
$100
0.88
$170
0.88
Sales
price A$/t
$1023
$795
$341
$114
$193
Table 5: Integrated K-Max plant product sales prices and discounts
FINANCIAL MODEL
A high level production model was developed based on yields achieved in testwork, operating and capital
costs estimates provided by Strategic Metallurgy and selling prices from CRU. Capital and operating costs
and sales revenues have been derived in A$.
Financial results are presented in Table 6:
NPV12
Capital costs (Phosphate plant)
Capital costs (Integrated K-Max plant)
Average Opex, per annum
Average Revenue, per annum
IRR%
$652 million
$135 million
$590 million
$168 million
$380 million
30%
Table 6: Financial results, summary
11
Potash West NL – Dinner Hill Project Update
January 2015
For further information contact:
Media:
Potash West NL
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
info@potashwest.com.au
Web: www.potashwest.com.au
Professional Public Relations
Colin Hay
Tel: +61 (08) 9388 0944
About Potash West
Potash West (ASX:PWN) is an exploration company focused on developing phosphate and potassium-rich
greensand deposits in West Australia’s Perth Basin. The Company aims to define a substantial resource
base and investigate how best to recover potash from the mineral. The project is well situated in relation to
infrastructure, with close access to rail, power and gas. A successful commercial outcome will allow the
Company to become a major contributor to the fertiliser market at a time of heightened demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of more than 2,600km2. Previous exploration
indicates glauconite sediments are widespread for more than 150km along strike and 30km in width.
Appendix A - Forward Looking and Cautionary Statements
The Scoping Study referred to in this report is based on low-level technical and economic assessments and
is insufficient to support any estimation of Ore Reserves or to provide assurance of an economic
development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be
realised.
The use of the word “ore” in the context of this report does not support the definition of “Ore Reserves” as
defined by the 2012 Edition of the ‘Australasian Code for reporting of Exploration Results, Mineral
Resources and Ore Reserves. The word ‘ore’ is used in this report to give an indication of quality and
quantity of mineralized material that would be fed to the processing plant and it is not to be assumed that
‘ore ‘will provide assurance of an economic development case at this stage, or to provide certainty that the
conclusions of the scoping study will be realized.
Certain statements contained in this announcement, including information as to the future financial or
operating performance of Potash West and its projects, are forward-looking statements. Such forwardlooking statements are necessarily based upon a number of estimates and assumptions that, whilst
considered reasonable by Potash West, are inherently subject to significant technical, business, economic,
competitive, political and social uncertainties and contingencies; involve known and unknown risks and
uncertainties that could cause actual events or results to differ materially from estimated or anticipated
events or results reflected in such forward-looking statements; and may include, among other things,
statements regarding targets, estimates and assumptions in respect of potash and phosphate production
and prices, operating costs and results, capital expenditures, ore reserves and mineral resources and
anticipated grades and recovery rates, and are or may be based on assumptions and estimates related to
future technical, economic, market, political, social and other conditions.
Forward-looking statements are necessarily based upon a number of estimates and assumptions related to
future business, economic, market, political, social and other conditions that, while considered reasonable
by Potash West, are inherently subject to significant uncertainties and contingencies
12
Potash West NL – Dinner Hill Project Update
January 2015
Potash West disclaims any intent or obligation to update publicly any forward-looking statements, whether
as a result of new information, future events or results or otherwise. The words “believe”, “expect”,
“anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”,
“may”, “will”, “schedule” and other similar expressions identify forward-looking statements. All forwardlooking statements made in this announcement are qualified by the foregoing cautionary statements.
Investors are cautioned that forward looking statements are not guarantees of future performance and
accordingly investors are cautioned not to put undue reliance on forward-looking statements due to the
inherent uncertainty therein.
The Company is of the opinion that it has reasonable basis for providing the forward looking statements
included in this announcement, including with respect to production targets, based on the information
contained in this announcement and in particular the JORC 2012 Mineral Resource for Dinner Hill as of
March 2014. This estimate was compiled by Continental Resource Management Pty Ltd with independent
metallurgical studies, determination of mining inventory, mine design and scheduling, external commodity
price and operating cost data,.
Competent Person’s Statement:
The production targets and other information in this announcement that relates to Mineral Resources is
based on, and fairly represent, the Mineral Resources and information and supporting documentation
extracted from the report which was prepared by a Competent Person in compliance with the JORC Code
(2012) and released to ASX by the Company on 20 March 2014. Potash West confirms that it is not aware
of any new information or data that materially effects the information included in the original
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimates in that previous ASX release continue to apply and have not materially changed.