QUARTERLY REPORT
COMPANY DETAILS
ABN: 62 147 346 334
Highlights
PRINCIPAL
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
W www.potashwest.com.au
o
o
AND
Enters into a Joint Venture exploration project in an established
German Potash field
Consolidated landholding in Dandaragan Trough, by applying for a
further 300km2
The Company has agreed to farm-in to an exploration project, in the South Harz
Potash field, in Central Germany. Potash West is earning 55% by funding
exploration licence applications and appraisal of previous work carried out.
Subsequent to the end of the quarter the Company undertook a capital raising,
raising a total of $2,900,000 before costs.
E info@potashwest.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
OTC PINK CODE
PWNNY
CORPORATE
INFORMATION
(30 October 2014)
196M Ordinary shares
36M Partly paid shares
4M Unlisted options
8M Listed options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
George Sakalidis
(Non-Executive Director)
Gary Johnson
(Non-Executive Director)
1
Potash West NL – Quarterly Report
October 2014
Dandaragan Trough Project
Potash West NL (“Potash West” or “the Company”) has continued to consolidate its holdings associated
with its flagship Dandaragan Trough project. It now holds exploration licenses and applications in the
Dandaragan Trough, covering an area of 2,140km2. Potash West applied for an additional exploration
licence during the quarter, ELA 70/4609, (Figure 1). This licence gives the Company virtually 100% of the
prospective northern parts of the Dandaragan Trough and is the site of previous surface workings for
phosphate.
Figure 1 – Dandaragan Trough Project tenure plan
Phosphate mineralisation in ELA70/4609 is present as nodular layers at the top and bottom of the Molecap
Greensand and outcrop sporadically over a distance of some 20km along the western edge of the tenement.
In areas of good exposure these deposits have been the subject of small scale mining during times of
economic constraint in the 1940s when imported supplies of rock phosphate became increasingly
expensive. Since then there has been only limited drilling along the target horizons.The stratigraphy is the
southern extension of the Company’s potash deposits at Dinner Hill some 10km to the north of
ELA70/4609. This addition presents some 40km of prospective potash and phosphate mineralisation in the
Molecap Greensand south of the Dinner Hill resources. Work has commenced on assembling historical data
in preparation for drilling programs on final grant of the tenure.
The Dandaragan Trough project is focused on exploiting the large greensands deposits, which commence
less than 100km to the north of Perth, Western Australia. The objective is to produce potash and single
superphosphate fertilisers and a range of valuable by-products from the glauconite and phosphate present
within the greensands.
2
Potash West NL – Quarterly Report
October 2014
The greensands within the Dandaragan Trough are widespread. The Dinner Hill project area covers
approximately 60km2 in the north-west of the Trough. Within the project area PWN has established an
exploration target of 1000Mt to 1500Mt of fresh greensand at a grade of between 4.0% and 4.8% K 2O, 8%
and 10% Al2O3, 12% and 14% Fe2O3, and 2.0% and 2.4% MgO. Included within the Exploration Target is
300-600Mt of phosphate mineralisation at a grade of between 1.5% and 3% P2O5. (refer ASX
announcement 7 May 2013).
The potential quantity and grade of the target is conceptual in nature, as there has been insufficient
exploration to estimate a Mineral Resource over its area and as it is uncertain if further exploration will
result in the estimation of a Mineral Resource.
An area of approximately 9km2 within Dinner Hill has been drilled to establish Indicated and Inferred
Mineral Resources for potash (K-Max) and phosphate. The higher grade portion of the K-Max resource
occurs in the Molecap Greensand. Nodular phosphate mineralisation at Dinner Hill occurs within a chalk
unit, the Gingin Chalk and in upper and lower greensand units, the Poison Hill Greensand and the Molecap
Greensand.
Current resource figures are shown in table 1:
(1)
Phosphate Resource (All Indicated)
Lower Cut-off
Million
Grade
Grade
Grade
Tonnes
(% P2O5)
(% K2O)
(% P2O5)
2.15
120
2.79
3.10
(2)
K-Max Resource
Unit
Molecap
Greensand
Category
Indicated
Inferred
Total
Grade
(% CaO)
8.17
Tonnes
(Mt)
K2O
%
P2O5
%
120
4.6
1.8
2
122
4.4
4.6
2.2
1.8
Table 1 Dinner Hill Resources
(1) Refer ASX release 20 March 2014)
(2) Refer ASX release 11 October 2012)
The Dandaragan Trough project has unique advantages of excellent connectivity to transport facilities,
infrastructure and proximity to local and regional markets. The Dinner Hill resource is located less than
200km from two major bulk export ports, Kwinana and Geraldton and is well situated in relation to major
project infrastructure.
The current time frame for commercialisation of the Dandaragan Phosphate Project is:
Upgrade a significant portion of the current Indicated and Inferred Mineral Resources to the
Measured category by April 2015
Completion of a Feasibility Study by Dec 2015
Completion of construction in Q4 2017
Start-up of full scale production in Mid-2018.
German Project
The Company is earning a 55% interest in a company, East Exploration Pty Ltd (EE), which has applied for
exploration licences in the South Harz region of Germany, (Figure 2). The funding will complete the
licence applications and carry out an assessment of the extensive geological data on one of the exploration
applications, Kullstedt, (Figure 3).
3
Potash West NL – Quarterly Report
October 2014
The South Harz region has a long history of potash mining, dating back to the late 1890s. Extensive
exploration work and R&D was carried out in the period from the 1960s to the 1980s. This confirmed that
substantial potash deposits in the form of sylvinite (KCl/NaCl) and carnallite (KCl/MgCl) still remain in
this region.
EE has commissioned ERCOSPLAN Ingenieurgesellschaft Geotechnik und Bergbau mbH (ERCOSPLAN)
to identify areas that have strong potential to contain significant potash mineralization. ERCOSPLAN are a
leading global potash consultancy based in Erfurt, Germany. It employs about 200 people globally and has
consulted on the development of many world class potash projects worldwide.
Two areas, Kullstedt (246km2) and Graefentonna (216km2) have been applied for. Both have extensive
historical drilling that intersected potash mineralisation between 200m and 1000m below the surface. Both
areas are adjacent to properties that have had significant potash production over the last 100 years.
Ercosplan is currently in the process of recovering archival data from some 50 historical drill holes located
within the Kullstedt application area. When assembled and verified this historical data will be used to
estimate JORC compliant Exploration Targets and to plan for ongoing drill programs. Depending on the
quality and location of the data the Company is hoping that it will be possible to estimate Mineral
Resources for parts of the application area to better quantify the tonnes and grade of the contained potash
deposits.
Figure 2: Project Location
4
Potash West NL – Quarterly Report
October 2014
Figure 3: Kullstedt application
Corporate
The Company continued its marketing programme to potential investors, which culminated in a capital
raising in October. It has engaged with a number of investors who are potential strategic partners to assist
in progressing development activities on both the phosphate and K-Max projects, this work is ongoing.
Announcements
The following ASX announcements were made during the quarter:
Trading Halt (07 July 2014)
Completion of $800,000 Placement (9 July 2014)
S708A Notice & Appendix 3B (14 July 2014)
Information Required Under ASX Listing Rule 3.10.5A ( 14 July 2014)
Quarterly Activities and Cashflow reports (25 July 2014)
S708A Notice and Appendix 3B ((25 July 2014)
Information Required Under ASX Listing Rule 3.10.5A (25 July 2014)
PWN Farming into Potash Project in Germany (29 July 2014)
ABN Newswire Video (12 August 2014)
-Notice of General Meeting/Proxy Form (13 August 2014)
East Exploration Commissions Review of Geological Data
(18 August 2014)
Presentation (18 August 2014)
Change of Director's Interest Notice (27 August 2014)
Option Expiry (9 September 2014) Results of Meeting (12 September 2014)
PWN Acquires Additional Ground Within Dandaragan Project (20 August 2014) PWN MineLife Daily Resources Bulletin (26 September 2014) PWN Research (29September 2014)
Annual Report to shareholders (30 September 2014)The following announcements were made subsequent to 30 September, 2014:
Trading Halt (07 October 2014)
Suspension from Official Quotation (09 October 2014)5
Potash West NL – Quarterly Report
October 2014
Reinstatement To Official Quotation (10 October 2014)
Completion of $2,900,000 Placement (10 October 2014)
S708A Notice & Appendix 3B (20 October 2014)
Notice of Annual General Meeting/Proxy Form (27 October 2014)Presentation (30 October 2014)
Cash on Hand
At 30 September 2014, $0.3 million cash was available. $2.9 million before costs was raised subsequent to
period end.
Tenement Summary
The following information is provided in accordance with ASX Listing Rule 5.4.3:
Country
Tenement
Tenement
Interest held at
30 June 2014
WA
E70/3100
100%
WA
E70/3360
100%
WA
E70/3418
100%
(1)
100%
Tenement
Interest held at
30 September
2014
0%
(1)
N/A
100%
(1)
N/A
100%
(1)
N/A
100%
(1)
N/A
100%
(1)
N/A
100%
N/A
N/A
N/A
N/A
100%
N/A
Pending
100%
100%
100%
100%
Pending
WA
E70/3987
100%
WA
E70/3988
100%
WA
E70/3989
WA
WA
WA
WA
WA
WA
E70/4124
E70/4137
E70/4138
E70/4139
E70/4471
E70/4609
100%
Pending
100%
100%
100%
0%
Pending
Interest acquired
/ disposed of
during quarter
(1) Denotes Beneficial holding of the Mineral Rights to Glauconite & Phosphate, and any byproducts resulting
For further information contact:
Potash West NL:
Media:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Web: www.potashwest.com.au
Professional Public Relations
Colin Hay
Tel: +61 (08) 9388 0944
About Potash West
Potash West (ASX:PWN) is an exploration company focused on developing large greensand deposits in
West Australia’s Perth Basin. The Company aims to define a substantial resource base and investigate
how best to recover potash and other minerals from the Dandaragan Trough. The project is well situated
in relation to infrastructure, with close access to rail, power and gas. A successful commercial outcome
will allow the Company to become a major contributor to the potash and phosphate markets at a time of
heightened regional demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 2,600km2. Previous exploration indicates
glauconite sediments are widespread for more than 150km along strike and 30km in width. Current JORC
6
Potash West NL – Quarterly Report
October 2014
compliant Indicated Mineral Resources stand at 241Mt at 3.0% K2O, including 120Mt at 4.6% K2O
amenable to processing by the K-Max process and 120Mt at 2.8% P2O5 of phosphate mineralisation.
Forward Looking and Cautionary Statement:
The scoping study referred to in this report is based on low-level technical and economic assessments and
is insufficient to support any estimation of Ore Reserves or to provide assurance of an economic
development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be
realised.
The use of the word “ore” in the context of this report does not support the definition of “Ore Reserves” as
defined by the 2012 Edition of the ‘Australasian Code for reporting of Exploration Results, Mineral
Resources and Ore Reserves. The word ‘ore’ is used in this report to give an indication of quality and
quantity of mineralized material that would be fed to the processing plant and it is not to be assumed that
‘ore‘will provide assurance of an economic development case at this stage, or to provide certainty that the
conclusions of the scoping study will be realized.
Certain statements contained in this announcement, including information as to the future financial or
operating performance of Potash West and its projects, are forward-looking statements. Such forwardlooking statements are necessarily based upon a number of estimates and assumptions that, whilst
considered reasonable by Potash West, are inherently subject to significant technical, business, economic,
competitive, political and social uncertainties and contingencies; involve known and unknown risks and
uncertainties that could cause actual events or results to differ materially from estimated or anticipated
events or results reflected in such forward-looking statements; and may include, among other things,
statements regarding targets, estimates and assumptions in respect of potash and phosphate production
and prices, operating costs and results, capital expenditures, ore reserves and mineral resources and
anticipated grades and recovery rates, and are or may be based on assumptions and estimates related to
future technical, economic, market, political, social and other conditions.
Forward-looking statements are necessarily based upon a number of estimates and assumptions related to
future business, economic, market, political, social and other conditions that, while considered reasonable
by Potash West, are inherently subject to significant uncertainties and contingencies
Potash West disclaims any intent or obligation to update publicly any forward-looking statements, whether
as a result of new information, future events or results or otherwise. The words “believe”, “expect”,
“anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”,
“may”, “will”, “schedule” and other similar expressions identify forward-looking statements. All
forward-looking statements made in this announcement are qualified by the foregoing cautionary
statements. Investors are cautioned that forward looking statements are not guarantees of future
performance and accordingly investors are cautioned not to put undue reliance on forward-looking
statements due to the inherent uncertainty therein.
The Company is of the opinion that it has reasonable basis for providing the forward looking statements
included in this announcement, including with respect to production targets, based on the information
contained in this announcement and in particular the JORC 2012 Mineral Resource for Dinner Hill as of
March 2014. This estimate was compiled by Continental Resource Management Pty Ltd. Additional
independent metallurgical studies, determination of mining inventory, mine design and scheduling, external
commodity price and operating cost data were undertaken by industry consultants.
Competent Person’s Statement:
The production targets and other information in this announcement that relate to Mineral Resources are
based on, and fairly represent, the Mineral Resource and information and supporting documentation
extracted from the report which was prepared by a Competent Person in compliance with the JORC Code
(2012) and released to ASX by the Company on 20 March 2014. Potash West confirms that it is not aware
of any new information or data that materially affect the information included in the original
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimate in that previous ASX release continue to apply and have not materially changed.
7
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
Potash West NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
30 September 2014
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
Receipts from product sales and related
debtors
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (Government grant and R&D refund)
Net Operating Cash Flows
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 1
Current quarter
$A’000
Year to date
(3 months)
$A’000
(113)
(113)
(544)
(544)
2
2
(655)
(655)
(50)
(50)
(705)
(705)
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
1.13
(705)
(705)
891
891
(55)
836
(55)
836
Net increase (decrease) in cash held
131
131
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
164
164
1.22
Cash at end of quarter
295
295
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (Equity Raising Costs)
Net financing cash flows
Payments to directors of the entity, associates of the directors,
related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
155
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation
Contributions.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available
$A’000
3.1
Loan facilities
3.2
Credit standby arrangements
Amount used
$A’000
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluation
300
4.2
Development
-
4.3
Production
-
4.4
Administration
200
Total
500
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 3
Current quarter
$A’000
Previous quarter
$A’000
295
164
295
164
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
Tenement
reference
and
location
6.1
6.2
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
Interests in mining
tenements and
petroleum tenements
acquired or increased
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
E70/3100
-
100%
nil
E70/4471
-
nil
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks
+Convertible
debt
securities
(description)
Number quoted
137,414,005
35,960,024
137,414,005
35,960,024
23,607,857
23,607,857
Issue price per
security (see
note 3) (cents)
$0.001
Amount paid up
per security (see
note 3) (cents)
$0.049
+ See chapter 19 for defined terms.
Appendix 5B Page 4
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised
during quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
100,000
100,000
1,250,000
1,350,000
8,221,457
1,000,000
500,000
8,221,457
-
Exercise price
$0.400
$0.600
$0.280
$0.355
$0.300
$0.130
$0.150
Expiry date
8 September 2016
8 September 2016
30 November 2014
13 November 2015
15 March 2015
25 October 2015
7 February 2017
500,000
-
$0.300
8 September 2014
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
30 October 2014
............................................................ Date: ............................
(Director/Company secretary)
Print name:
Patrick McManus
.........................................................
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements and petroleum tenements acquired, exercised or
lapsed during the reporting period. If the entity is involved in a joint venture
agreement and there are conditions precedent which will change its percentage
interest in a mining tenement or petroleum tenement, it should disclose the
change of percentage interest and conditions precedent in the list required for
items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6