Updated Investor Presentation
Outlining Enhanced Corporate Strategy
HIGHLIGHTS:
§ Updated Investor Presentation Outlining:
§ New Vision for Parkway following acquisition of CPC.
§ Details about leveraging the aMES™ technology platform.
§ Plans to commence PFS for the Karinga Lakes Potash Project.
§ Project Portfolio Rationalisation
§ Increased interest in the New Mexico Lithium Project to 70%.
§ Embarked on a prospective JV partner engagement program for
the Dandaragan Trough Project.
§ Decision not to renew Lake Seabrook to prioritise efforts.
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
4IP
CORPORATE
INFORMATION
As of 3 October 2019
§ 1,215M Ordinary shares
§ 245M Partly paid shares
§ 55M Unlisted options
BOARD OF DIRECTORS
Mr. Adrian Griffin
Non-Executive Chairman
Mr. Patrick McManus
Managing Director
Mr. Bahay Ozcakmak
Executive Director
Mr. Patrick Power
Non-Executive Director
Parkway Minerals NL (ASX: PWN) (Parkway, PWN, or the Company) is pleased
to provide the following corporate update. Following the recent acquisition of
Consolidated Potash Corporation (CPC), the board of Parkway has continued to
review the expanded technology and project portfolio, to determine the most
suitable and prospective opportunities to pursue. In addition to progressing the
advanced stage Karinga Lakes Potash Project towards PFS, the Company has
determined that the opportunities resulting from the recently acquired aMES™
technology platform, provide significant near-term potential.
In the context of the revised corporate strategy, the Company has decided to
advance and rationalize the Parkway project portfolio, as follows:
New Mexico Lithium Project – NMLP (PWN: 70%)
The NMLP covers approximately 40km2 of BLM claims over the central region
of the Lordsburg Playa in south-west New Mexico, USA. The project is highly
prospective for lithium and to a lesser extent potassium enriched brines. Prior
to the completion of the acquisition of CPC, Parkway advanced funds for the
purposes of claim renewals and permitting, resulting in Parkway recently
increasing its interest in the project from 50% to 70%.
Dandaragan Trough Project – DTP (PWN: 100%)
The Company has recently embarked on a prospective JV partner engagement
program for the DTP, with the support of new major Parkway shareholders.
Lake Seabrook Project (PWN: 100%)
Notwithstanding encouraging brine sampling results announced earlier this
year, the Company has deemed the timelines and costs associated with
greenfield project exploration, not to be a priority for Parkway at this time. On
this basis, the Company has decided not to renew the exploration licences and
has commenced the relinquishment process for the Lake Seabrook project.
Updated Investor Presentation
Details about the enhanced corporate strategy and the New Vision for Parkway, together with additional
details about the expanded technology and project portfolio are outlined in a new Investor Presentation,
appended to this announcement.
Executive Director of Parkway Mr. Bahay Ozcakmak commented:
“The recently completed acquisition of CPC provides Parkway with a springboard into a number of highimpact and near-term opportunities. We’ve now commenced the formal PFS planning process with our JV
partner at the Karinga Lakes Potash Project, and pleased to move to a majority equity interest in the New
Mexico Lithium Project. Both these projects represent significant opportunities for Parkway, particularly in
the context of the aMES™ technology, which we believe will deliver substantial advantages for these
projects moving forward.
In addition to our own projects, we are also exploring a range of third-party brine projects, where there
may be an opportunity for Parkway to provide a brine processing solution, based on the aMES™ technology.
Importantly, some of these third-party projects are established operations, potentially providing Parkway
with the opportunity to create significant value, without necessarily taking on greenfield project related
risks.
We’ve provided additional details of our New Vision for Parkway in the attached presentation, and look
forward to providing further details of our progress, in the near future.”
For further information please contact Parkway at:
Mr. Bahay Ozcakmak
Executive Director
P: +61 8 9479 5386
M: +61 414 596 007
E: bahay@parkwayminerals.com.au
Mr. Patrick McManus
Managing Director
P: +61 8 9479 5386
M: +61 408 956 798
E: patrick.mcmanus@parkwayminerals.com.au
Parkway Minerals NL (ASX: PWN)
|
ASX ANNOUNCEMENT: 3 October 2019
2
the
new
the
new
Investor Presentation
October 2019
ASX:
PWN
FSE:
4IP
October 2019
www.parkwayminerals.com.au
www.parkwayminerals.com.au
Parkway Minerals (ASX: PWN)
|
Investor Presentation
1
the
new
Disclaimer
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitute an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation may not be
distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such
jurisdiction. This presentation does not constitute financial product advice and has been prepared without taking into account the recipients’ investment objectives, financial circumstances or particular needs, and the opinions and recommendations in this presentation are
not intended to represent recommendations to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate.
All securities transactions involve risks which include, among others, the risk of adverse or unanticipated market, financial or political developments.
Certain statements contained in this presentation, including information as to the future financial or operating performance of Parkway Minerals NL (‘Parkway Minerals’ or ‘the Company’) and its projects and technologies, are forward-looking statements. Such forwardlooking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Parkway Minerals, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and
contingencies, involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward-looking statements, and may include, among other things, statements
regarding targets, estimates and assumptions in respect of potash and phosphate production and prices, operating costs and results, capital expenditures, ore reserves and mineral resources and anticipated grades and recovery rates, and are or may be based on
assumptions and estimates related to future technical, economic, market, political, social and other conditions including the satisfactory performance of certain technologies developed and/or acquired by Parkway Minerals. Parkway Minerals disclaims any intent or
obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise. The words ‘believe’, ‘expect’, ‘anticipate’, ‘indicate’, ‘contemplate’, ‘target’, ‘plan’, ‘intends’, ‘continue’, ‘budget’, ‘estimate’, ‘may’,
‘will’, ‘schedule’ and other, similar expressions identify forward-looking statements. All forward-looking statements made in this presentation are qualified by the foregoing cautionary statements. Investors are cautioned that forward-looking statements are not guarantees
of future performance and, accordingly, investors are cautioned not to place undue reliance on forward-looking statements due to the inherent uncertainty therein. Many known and unknown factors could cause actual events or results to differ materially from estimated or
anticipated events or results reflected in such forward-looking statements. Such factors include but are not limited to: competition; mineral prices; ability to meet additional funding requirements; exploration, development and operating risks; new technology related risks;
uninsurable risks; uncertainties inherent in ore reserve and resource estimates; dependence on third-party smelting facilities; factors associated with foreign operations and related regulatory risks; environmental regulation and liability; currency risks; effects of inflation on
results of operations; factors relating to title to properties; native title and Aboriginal heritage issues; dependence on key personnel, and share price volatility. They also include unanticipated and unusual events, many of which it is beyond the Company’s ability to control
or predict.
DINNER HILL RESOURCE STATEMENT
Information in the presentation that relates to the Mineral Resource estimate for Dinner Hill is fully described in the ASX release of 26 September 2017. The Company is not aware of any new information or data that materially affects the information included in this
presentation. All material assumptions and technical parameters underpinning the Mineral Resource estimates and Exploration Target in this presentation continue to apply and have not materially changed. The K-Max Scoping Study referred to in this presentation was
fully described in the ASX release of 10 January 2013, while the Phosphate Scoping Study was released on 19 September 2013 and updated on 30 September 2015. Both are based on low-level technical and economic assessments and are insufficient to support an
estimation of Ore Reserves, provide assurance of an economic development case at this stage or provide certainty that the conclusions of the Scoping Study will be realised. All material assumptions and technical parameters used in the Scoping Study and included in
this presentation continue to apply and have not materially changed. Parkway Minerals has concluded that it has a reasonable basis for including the forward-looking statements provided in this presentation.
Competent persons’ statements
The information in this report that relates to the estimation of Exploration Targets and Mineral Resources is based on and fairly represents information and supporting documentation prepared by J.J.G. Doepel, a member of the Australasian Institute of Mining and
Metallurgy. Mr Doepel, principal geologist of the independent consultancy Continental Resource Management Pty Ltd, has sufficient experience relevant to the style of mineralisation and type of deposit under consideration. He is qualified as a Competent Person, as
defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. This report is issued with Mr Doepel’s consent as to the form and context in which the Mineral Resource appears. The information in this
report that relates to reporting of Exploration Results is based on and fairly represents information and supporting documentation prepared by James Guy, a member of the Australian Institute of Mining and Metallurgy. Mr Guy is a consultant to the mineral industry and
has sufficient experience relevant to the style of mineralisation and type of deposit under consideration. He is qualified as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr Guy consents to the inclusion in this report of the matters based on information in the form and context in which it appears. The metallurgical information in this report is based on and fairly represents information and supporting documentation compiled by
Gary Johnson, a Member of the Australasian Institute of Mining and Metallurgy. Mr Johnson has sufficient experience relevant to the activity being undertaken to qualify as a Competent Person as defined in the 20012 edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Johnson is managing director of Strategic Metallurgy Pty Ltd. This report is issued with Mr Johnson’s consent as to the form and context in which the results appear.
KARINGA LAKES POTASH PROJECT (KLPP) – RESOURCE DESCRIPTION
RESOURCE STATUS
On 20 February 2014, Verdant Minerals reported an in-situ SOP resource (in accordance with the 2012 JORC Code) for the Karinga Lakes Potash Project (KLPP). The 2014 resource is calculated using total porosity (total brine content) of the host rock. Subsequent to
this resource estimate, in April 2019, the reporting requirements for brine resources under JORC have been updated, with a new set of requirements, which have been outlined in an AMEC (Association of Mining and Exploration Companies) publication titled, Guidelines
for Resource and Reservice Estimation of Brines.
The updated brine reporting guidelines can be downloaded from the AMEC website:
https://www.amec.org.au/Public/Media/AMEC_Publications/AMEC_Brine_Guidelines.aspx
The guidelines recommend the use of drainable porosity of the host rock (brine content that can be drained by gravity). The 2014 resource is not consistent with the new guidelines in this regard. Revision of the resource estimate to be consistent with the guidelines will
result in a reduction of the total reported resource. The 2014 resource estimate is comparable to other brine potash resources reported in accordance with the JORC Code 2012, that are calculated based on total porosity. During the transition to the new guidelines it has
been common for companies to report both estimates calculated on total porosity and calculated on Drainable Porosity.
ADDITIONAL INFORMATION
Detailed hydrogeological studies at the KLPP have been based on significant datasets including drill hole, trench, production tests and monitoring data over several years provide confidence in the project. In collaboration with CPC’s joint venture partner Verdant
Minerals, the KLPP joint venture will determine an appropriate work program, (as part of a feasibility study) to to revise the resource estimate for the KLPP. As a result, investors are cautioned not to make investment decisions based on the presently reported and publicly
available mineral resource for the KLPP.
October 2019
Parkway Minerals (ASX: PWN)
|
Investor Presentation
2
the
new
Presentation Overview
Overview
Corporate Snapshot
Acquisition of CPC – Transformational Transaction
Parkway Minerals – Our Vision
Mining Industry – Brine Processing Opportunities
aMES™ – Solving Problems & Creating Value
Proprietary aMES™ Technology Platform
Fertilisers are of Global Strategic Importance
Sulphate of Potash (SOP) – Industry Cost Curve
SOP – Challenges & Opportunities by Segment
Opportunities for SOP Production through aMES™
4
5
6
7
8
9
10
11
12
13
Projects
§ Karinga Lakes Potash Project (KLPP)
§ Overview
§ Project Appraisal
§ Forward Plan
§ New Mexico Lithium Project (NMLP)
§ Dandaragan Trough Project (DTP)
§ Davenport Resources (ASX: DAV)
14
15
16
17
18
19
Appendices
§ aMES™ - Key Technological Innovations
§ aMES™ - Value Creation Strategy
§ Board of Directors
20
21
22
FLAGSHIP PROJECT
§
§
§
§
§
§
§
§
§
§
The
Karinga Lakes
Potash Project (KLPP)
§ Extensive investigative
studies performed.
§ aMES™ technology
provides advantages over
conventional project
development route.
§ High-purity MOP and
SOP produced through
aMES™ technology.
KLPP – PFS: Planning Underway with Verdant Minerals
October 2019
Parkway Minerals (ASX: PWN)
|
Investor Presentation
3
the
new
Corporate Snapshot
Capital Structure
Current
Ordinary Shares (PWN) on issue
1,214,906,085
12-month Trading Range
$0.003 - $0.010
Market Capitalisation (at $0.006)
$7.2 million
Partly Paid Securities (PWNCA)
245,158,677
Unlisted Options ($0.02, 17 Aug 2020)
55,126,000
Major Shareholders
CPC
™
CONSOLIDATED
Potash Corporation
Transformational
Acquisition
Percentage
Lions Bay Capital (CPC vendor)
18.4%
Activated Logic (CPC vendor, ED)
16.8%
Citicorp Nominees (HNW)
4.3%
Horn Resources (CFO)
3.1%
Rhodes Mining (CPC vendor)
2.8%
Patrick McManus (MD)
2.6%
Other Top 20
19.5%
Top 20
67.5%
Marketable Securities
Value ($A)
34,300,000 units ASX:DAV @ $0.05
$1.65 million
7,142,850 units ASX: DAVO $0.005
$0.04 million
5,600,000 units ASX: LIT $0.05
$0.28 million
Total
~$2 million
October 2019
Parkway Minerals (PWN) – 3 Year Share Price Chart
Directors & Management
Stock Symbols
Adrian Griffin – Non-Executive Chairman
Patrick McManus – Managing Director
Bahay Ozcakmak – Executive Director
ASX:
PWN
Patrick Power – Non-Executive Director
Robert van der Laan – Chief Financial Officer
Amanda Wilton-Heald – Company Secretary
Parkway Minerals (ASX: PWN)
|
Investor Presentation
Frankfurt:
4IP
4
the
Acquisition of CPC – Transformational Transaction
new
1(a) CPC Transaction Timeline
2(a) Growth Platform
Consolidated Potash Corp (CPC) is an unlisted Australian company.
§ The acquisition of CPC provides Parkway with a pathway to create
substantial value by focusing on the:
§ 05 Aug 2019 – Parkway agreed to acquire CPC.
§ 27 Aug 2019 – Parkway raised $450,000 (condition precedent).
§ KLPP and NMLP projects
§ 13 Sep 2019 – Parkway shareholders approved acquisition of CPC.
§ aMES™ technology platform
§ 17 Sep 2019 – Parkway completes acquisition (98.83% of CPC shares).
§ A deep organic business development pipeline - based on aMES™
1(b) Assets Acquired Through CPC
2(b) Execute Business Plan
Attractive Projects
§ Parkway is focused on advancing near-term, high-impact opportunities.
§ The acquisition of CPC, provides Parkway with direct ownership
interests in two highly prospective brine projects:
Leverage Technology Platform
§ Karinga Lakes Potash Project (KLPP)
§ Initial 15% interest, increasing to 40% (refer page 14)
§ New Mexico Lithium Project (NMLP, Central Lordsburg Playa)
§ 70% interest, increasing to 100% (refer page 17)
Disruptive Technology Platform
§ The acquisition of CPC, also provides Parkway with direct ownership of
the aMES™ technology platform, suitable for a range of brine
processing applications, including the production of potash and lithium.
§ Commercialisation of aMES™ – advance potential opportunities to apply
the technology, particularly to operating assets in the potash sector.
Key Project Priorities
§ KLPP – scale-up aMES™ testwork and advance towards PFS.
§ NMLP – farm-out for free carry, and/or shallow drill to define resource.
Davenport Resources (Parkway owns 20.8% of ASX: DAV)
§ Establish partnership to explore collaborative opportunities and support
Davenport Resources strategic activities in Germany.
1(c) Corporate Synergies
2(c) Legacy Parkway Project Platform
§ Complementary projects and technology, provide Parkway with
substantial strategic and operational synergies.
§ Dandaragan Trough – historical expenditure in the order of $12 million.
§ Enlarged project and technology portfolio together with an expanded
board provide Parkway with critical-mass to execute & unlock value.
§ Lake Seabrook – initially encouraging SOP exploration results.
October 2019
§ Soliciting interest from prospective JV partners or acquirers.
Parkway Minerals (ASX: PWN)
§ Parkway intends to divest the project to focus on key priorities.
|
Investor Presentation
5
the
the
new
new
Parkway Minerals – Our Vision
“
To transform
global brine processing methods,
through innovative technology
thereby improving sustainability,
and creating value.
“
Economic Value
- Improved mineral recovery
- Recycling of water & reagents
- Monetisation of byproducts
Environmental Value
- Reduced environmental footprint
- More sustainable operations
October 2019
aMES™
KEY APPLICATIONS
Desalination
Mining Brines
Social Value
- Meeting community expectations
Potash – SOP
Parkway
PWN)
| Investor Presentation
- Minerals
Securing (ASX:
Licence
to Operate
6
the
Mining Industry – Brine Processing Opportunities
new
1) Desalination Waste Brinei
Waste Brine
- chemicals
- salt
- water
Seawater Desal (SWRO)
§ For every litre of freshwater output, desalination plants
produce on average 1.5 litres of brine.
§ World’s ~16,000 desalination plants discharge 142
million m³/day of brine daily.
1
Desalination Plant
i – Adapted from: “UN Warns of Rising Levels
of Toxic Brine as Desalination Plants Meet
Growing Water Needs”, UNU-INWEH Study
(14 Jan 2019).
Process Water
§ Brine management can represent up to 33% of a
desalination plant’s cost and ranks among the biggest
constraints to more widespread development.
§ Almost 22 million m³/day of brine is produced at a distance
of greater than 50km from the nearest coastline. Despite
the large volume of brine produced in these areas, very few
economically viable and environmentally sound brine
management options exist.
2) Mineral Brine Feedstock
Brine Feedstock
- minerals
- salt
- water
Brine/Solution Mining
§ Primary brine projects include playa hosted brines for the
production predominantly potash and lithium Key opportunity
2
Mining Operations
§ Solution mining (ISL/ISR) techniques are also utilised to
produce potash and other valuable mineral products.
3) Tailings Waste Streams
Waste Stream
- minerals
- reagents
- water
§ Typically have a large footprint and represent substantial
environmental risks including community concerns.
3
Tailings Storage (TSF)
October 2019
Parkway Minerals (ASX: PWN)
|
§ Tailings storage facility (TSF) construction, operation and
maintenance represent significant costs and risks.
§ Treatment of tailings solutions is a high growth sector.
Investor Presentation
7
the
aMES™ - Solving Problems & Creating Value
new
aMES™ - Advantages
Waste Brine
- chemicals
- salt
- water
§ Improvements in mineral recovery and product quality.
1
a
MES™
§ Opportunity for substantial project capex & opex savings.
§ Highly efficient use of energy and produces pure water as a by-product.
§ Improved project footprint and environmental sustainability.
The Process
§ Novel integration of proven technologies, combined with;
Brine Feedstock
- minerals
- salt
- water
Waste Stream
- minerals
- reagents
- water
October 2019
§ Innovative process based on proprietary IP incorporating patents,
expertise and knowhow ensures aMES™ is an effective technology with
substantial advantages over conventional brine processing.
What is aMES™?
2
3
§ Next-generation (activated) Mineral
Extraction System - aMES™.
Mineral Products
- Potash (MOP/SOP)
- Lithium minerals
CREATING VALUE
§ Technology is suitable for recovery of
minerals, reagents and water from
aqueous solutions including desalination,
industrial and mining waste streams.
By-Products
- Magnesium Chloride
- Leonite/Sodium Sulphate
Economic Value
- Improved mineral recovery
- Recycling of water & reagents
- Monetisation of byproducts
§ Mineral extraction is facilitated by
systematically concentrating minerals in
brines through a proprietary multi-staged
process incorporating the novel use of
innovative membranes.
Reagents
- Mineral processing acids
- Ammonia base
Environmental Value
- Reduced environmental footprint
- More sustainable operations
Pure Water
- Demineralized water
- Extremely high purity
Parkway Minerals (ASX: PWN)
|
Investor Presentation
Social Value
- Meeting community expectations
- Securing license to operate
8
the
new
Proprietary aMES™ Technology Platform
High-Value Technology Platform
World-Leading R&D
Through the acquisition of CPC, Parkway has acquired Activated Water
Technologies (AWT), the owner of the aMES™ technology platform.
§ Subsidiaries recently acquired by Parkway, primarily AWT, are at the
forefront of innovative brine processing related R&D.
AWT has a strategic collaboration and technology licencing
agreement in place with VU. The partnership has been successful
in securing prestigious Australian Research Council (ARC) grants to
deliver R&D programs with budget exceeding $1 million.
Through aMES™, AWT has developed:
§ An efficient system to process concentrated brines to recover valuable minerals.
§ Flexibility to optimise flowsheet to extract maximum value from a given feedstock.
AWT is a founding member of ARC-EESep, a world-class team of
scientists from 8 Australian universities, CSIRO, 3 Intl. universities,
and includes 20 industry partners, with total funding of >$10 million.
§ A novel brine processing platform, with substantial barriers to entry.
Novel Concept Design
§
The aMES™ technology:
§
§
Is based on innovative
system designs,
including (patented)
designs which provide
significant advantages
Incorporates a range
of proprietary
modifications and
integrations to
established process
designs & equipment
October 2019
R&D Technical Partner
§
Strategic partnership and
technology licensing agreement
with Victoria University (VU).
§
Based on more than a decade of
water sector research (>$10M), has
developed significant R&D
expertise knowhow relating to:
§
Novel system designs
§
Robust operation of
pilot plant facilities
§
State-of the-art R&D
Pilot Plant Facilities
§
High Performance
A broad range of aMES™ pilot plant
equipment and facilities suitable for:
§
§
§
Performing cutting-edge
in-situ studies including
crystallization kinetics
§
The design of each aMES™ project
application is intended to achieve a
material step-change in project
performance as a results of:
Investigating key process
parameters and providing
proof-of-concept for each
feedstock
Validating performance
and performing range of
optimization studies
§
Proprietary system
design & operation
§
Integrated heatexchanger (patented) to
improve energy intensity
§
Utilising CHP principles
to increase system
efficiency
Leading Partnerships
§
Established relationships with key
partners essential for successful
project delivery including:
§
Technical process
development expertise
§
OEM suppliers,
particularly plant and
BOP system related
§
EPC contractors
§
Specialised consultants
§
Project proponents
aMES™ Pilot Plant
aMES™ Operations
aMES™ Products
Innovative aMES™ pilot
plant built and operated,
with specialised
equipment; options to
significantly scale-up
brine processing
capacity as required.
Proprietary brine
extraction, preparation
and processing
capabilities based on the
innovative aMES™
technology platform,
support testing operations.
Extensive testwork based
on proprietary aMES™
flowsheets has produced
high-grade potash related
products, including sylvite
(MOP), leonite (KMS),
sulphate of potash (SOP).
Parkway Minerals (ASX: PWN)
|
Investor Presentation
9
the
Fertilisers are of Global Strategic Importance
new
Mission Critical
§ Modern agricultural food production requires fertilisers.
Major Crops in China (by area, Million ha)
The Importance of NPK
§ N-P-K are the Major Nutrients in agricultural fertilisers.
§ Each of these nutrients, are essential for plant growth.
§ Each of these nutrients, are non-substitutable.
Major Nutrients
Minor Nutrients
Micro Nutrients
§ Nitrogen (N)
§ Calcium (Ca)
§ Mg, Zn, Fe,
§ Phosphorus (P)
§ Magnesium (Mg)
§ B, Cu, Mo, Cl
§ Potassium (K)
§ Sulphur (S)
§ and several others
Potassium & Potash
§ Potassium (K) stimulates plant growth, provides disease
resistance and drought tolerance, and improves flavour,
colour and shelf-life of fruits and vegetables.
SOP is the most suitable source
of potash for these crops
§ Potash is a general term to describe compounds containing
water soluble potassium suitable for plant growth.
Long-Term Growth in Demand
§ Muriate of Potash (MOP) – KCl, is suitable for many crops.
§ Population growth is driving demand for food, water and natural resources.
§ Sulphate of Potash (SOP) – K2SO4 is superior for Cl sensitive
crops and generally trades at a US$200+ premium to MOP.
§ To satisfy the increased demand for food requires intensification of
agriculture, which in turn requires fertilisers to improve productivity.
Potash – Concentrated Production Profile
§ Production of higher value protein (meat) requires significantly more
feedstock (grain), often 4 - 10x more grain to produce the equivalent meat.
§ Global potash production is dominated (92%) by a small
number of countries, including: Canada (35%), Belarus (19%),
Russia (17%), China (12%), Israel (6%) and Germany (4%).
§ Improving diets in developing countries is increasing demand for tree nuts,
fruits and vegetables, which are typically chloride intolerant (see chart),
therefore MOP is unsuitable as a source of potash, and SOP is required.
October 2019
Parkway Minerals (ASX: PWN)
|
Investor Presentation
10
the
new
Sulphate of Potash (SOP) – Industry Cost Curve
Recent Industry Developments
§ The high-quality and low-cost segments of the SOP market are steadily growing, with the opportunity to displace high-cost and low-quality SOP production;
§ Whilst there is excess production capacity for MOP, the transition to precision agriculture is increasing demand for higher quality fertilisers (SOP).
Costs of SOP lower-end
Proponents upper-end
Cash Cost (US$/t FOB)
600
500
SQM
Australia
Bindi
SDIC
K+S
Migao
Asia
Europe
Asian – exc-China
Americas
Tessenderlo EU Compass
Other
Recent SOP Pricing
~US$233/t
400
300
Existing
Production
Recent MOP Pricing
Mannheim
“MOP to SOP Conversion”
Production
200
100
§ Lightly shaded section of bars represent in-land transportation cost to nearest port
-
October 2019
§ Dark section of bars represent site costs
Cumulative Annual Production (Total
Share your feedback
Discover