Lake Seabrook Project Returns Encouraging Potash Values
Released
Released
Announcement PDF
ASX Announcement
11 June 2019
____________________________________________________________________________________
PARKWAY MINERALS (ASX:PWN) LAKE SEABROOK PROJECT RETURNS
COMPANY DETAILS
ENCOURAGING POTASH VALUES
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Parkway Minerals NL
Level 1
675 Murray St
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6872
W
www.parkwayminerals.com.au
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
CORPORATE
INFORMATION
11 June 2019
608M Ordinary shares
123M Partly paid shares
68M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Natalia Streltsova
(Non-Executive Director)
HIGHLIGHTS:
Initial field brine sampling program completed
Solution assays up to 4209 mg/l potassium returned from near
surface water samples
Fertiliser feedstock explorer Parkway Minerals (ASX: PWN), (PWN, Parkway
or The Company) is pleased to announce the results of its initial sampling
program on it’s 100% owned Lake Seabrook Potash Brine Project.
The Lake Seabrook Project is located approximately 450 km northeast of
Perth and approximately 80 km north east of Southern Cross in the Yilgarn
region of Western Australia (Figures 1 and 2). A field crew has recently
carried out a water sampling program along one of the lakes within the
project area.
Parkways Managing Director, Patrick McManus, said “This sampling
program covers less than half the project area but has returned some
relatively high near surface potassium in brine. Follow up work will
investigate the extent of paleochannels and deeper brine values”
Parkway Minerals NL: Lake Seabrook
June 2019
FIgure 1: Lake Seabrook Location
BACKGROUND
The Lake Seabrook project is a salt lake in the Wheatbelt region of Western Australia, northeast of Southern
Cross, very close to the Perth-Kalgoorlie rail line. The Company has approximately 101 square kilometres
of granted tenure over the lake surface.
The Company’s principal exploration target will be paleochannels within the lake that may contain high
concentrations of potassium mineralisation. This is a similar exploration model to other salt lake potash
explorers within Western Australia. Should the Company’s exploration be successful, the Lake Seabrook
Project holds significant infrastructure advantages that could significantly reduce costs to any future
operation.
Lake Seabrook is a large paleovalley salt lake that overlies a basement of granite and greenstone rocks of
Archaean age.
A field crew using quad bikes completed a traverse through the centre of Lake Seabrook. Samples were
collected approximately 500m apart (Figure 2). The samples were collected from shallow pits dug on the
surface of the lake. No water seepage was returned from 5 of the holes. The holes that returned a brine
sample samples were assayed by Nagrom Laboratories Pty Ltd for Ca, K, Li, Mg ,Na, P, U, SO4, pH, TDS. A
full table of the sample results is presented as table 1.
Parkway Minerals NL: Lake Seabrook
June 2019
FIgure 2: Lake Seabrook Sample Plan
The potassium sample results ranged from 1012 mg/l to 4209mg/l. In the central part of the lake system
three brine samples returned potassium concentrations of 2521 mg/l, 2616mg/l and 4209 mg/l which is
considered encouraging.
The current program did not test the primary target which is deeper alluvial channel sands within the lake.
However the programme cinfrims that potassium in solution is present in high concentrations in the near
surface brine.
NEXT STEPS
These results are encouraging, the company has only completed sampling over approximately half of the
project area. Parkway intends to complete further surface sampling on the remaining parts of the project
area as well as ground seismic surveys to define paleochannels to drill test. For further details please
contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Mob:+61 408 956 798
Email:patrick.mcmanus@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
Parkway Minerals NL: Lake Seabrook
June 2019
About Parkway Minerals
Parkway Minerals (ASX:PWN) is an exploration company focused on developing large greensand deposits
in West Australia’s Perth Basin. The Company aims to define a substantial resource base and investigate
how best to recover phosphate, potash and other minerals from the Dandaragan Trough. The project is well
situated in relation to infrastructure, with close access to rail, power and gas. A successful commercial
outcome will allow the Company to become a major contributor to the potash and phosphate markets at a
time of heightened regional demand.
The Company has a major land holding over the Dandaragan Trough, one of the world’s largest known
glauconite deposits. Previous exploration indicates glauconite sediments are widespread for more than
150km along strike and 30km in width. Current JORC compliant Indicated Mineral Resources stand at 250Mt
at 2.9% P2O5 of phosphate mineralisation and 175Mt at 4.2% K2O, amenable to processing by the K-Max
process (ASX release:3 June 2015).
The Company owns 44.2 M shares in Davenport Resources (ASX :DAV), focused on potash exploration in the
South Harz region of central Germany, and 6.8M shares in Lithium Australia NL(ASX:LIT,) focused on lithium
technology.
Competent Persons Statement
The information that relates to the sampling and geochemical analysis has been collected and compiled by
Mr James Guy. Mr Guy is a consultant engaged by the company and is a member of the Australian Institute
of Metallurgy. Mr Guy has sufficient experience in the style of mineralisation and the activites under
consideration to qualify as a competent person as defined in the 2012 Edition of the Australisian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Guy consents to the inclusion in
this report of the matters based on his information in the form and context in which it appears.
Parkway Minerals NL: Lake Seabrook
June 2019
Solutions
Sample ID
Sample
Type
East
North
Depth
Comment
Ca
K
Li
Mg
NA
P
Th
U
SO4
pH
TDS
mg/L
mg/l
mg/L
mg/L
mg/L
mg/L
m/g/l
mg/L
mg/l
1492
-1
8863
105229
4
-0.5
-0.5
12186
6.9
397
-1
8787
105084
3
-0.5
-0.5
12321
6.7
354
-1
9668
107257
2
-0.5
-0.5
13341
6.7
346
-1
10186
97379
2
-0.5
-0.5
13611
6.6
335
g/l
LSW001
Water
750467
6568700
0.3
570
LSW002
Water
750825
6569634
0.3
538
LSW003
Water
751235
6570540
0.3
498
LSW006
Water
752377
6573296
0.3
583
LSW007
Water
752785
6574212
0.3
568
1552
2
9976
102568
3
-0.5
-0.5
12555
6.5
350
LSW009
Water
753590
6576033
0.3
532
1834
-1
11288
97918
2
-0.5
-0.5
14397
6.6
348
LSW010
Water
753472
6577025
0.3
224
27044
80212
3
-0.5
-0.5
32784
6.5
378
LSW011
Water
753382
6578017
0.3
396
2521
16371
92607
20292
6.6
376
754251
6576783
754977
6577465
396
2616
-1
17485
88907
4
-0.5
-0.5
21660
6.5
440
LSW014
755750
6578107
0.4
No seepage
LSW015
756530
6578743
0.4
No seepage
LSW016
757258
6579418
0.4
No seepage
LSW017
578046
6580037
0.4
No seepage
LSW018
758804
6580697
0.4
No seepage
LSW012
LSW013
Water
0.4
1432
1478
1614
4209
-1
1
3
-0.5
-0.5
No seepage
0.3
LSW019
Water
755180
6580898
0.3
669
1196
-1
8533
93107
2
-0.5
-0.5
13359
6.3
315
LSW020
Water
754306
6580301
0.3
697
1012
-1
8590
88074
5
-0.5
-0.5
13611
6.3
305
Table 1: Solution assays
Appendix 1 JORC Tables
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Brine samples were collected from shallow holes dug into the surface of
the lake.
Drilling
techniques
Drill sample
recovery
Logging
6
Not Appliciable
Not Appliciabe
Samples were not geologically logged. The results of the current
sampling will not be used for resource estimation purposes .
Criteria
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
JORC Code explanation
Commentary
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
7
No field standard or duplicates were collected.
Brine water was collected into a 500m clean plastic screwtop bottle.
Clay /mud was suspended in the brine which settled during storage.
Due to the remote field location brine samples were not refrigerated
but were stored away from direct sunlight and submitted to the
laboratory within 3 days of collection.
The brine sample volume is small but is adequate to give a
reasonable indication of the chemical properties of the fluids.
All samples were sent to Nagrom Laboratories Pty Ltd , Perth.
Solutions were analysed for Na,Ca, K,Mg,P,SO4, and V by
Inductively Coupled Plasma Optical Emission Spectometry and Li
and U by Inductively Coupled Plasma Mass Spectometry. TDS by
gravimetric, Cl- and NO3 were analysed colourmetrically
Standard laboratory QA/QC procedures were followed by the
analytical laboratory .
Due to the preliminary nature of the sampling program, there has
been no independent verification of the results
The location of the auger holes was by hand held GPS with an
accuracy of between 2- 3 m.
The datum was GDA 94 zone 50.
Criteria
JORC Code explanation
Commentary
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
The current sampling program was reconnaissance in nature. With
samples sites located approximately 500 m apart The results of the
current work will not be used in future resource calculations
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
The results of any audits or reviews of sampling techniques and data.
Due to the large areal extent of the lake surface within the project
area the current sampling is not considered representative of the
project area.
Samples were collected and stored on site before being transported
and delivered to the laboratory by field personnel involved in
collecting the samples
No audits or reviews of the sampling technique or results has been
completed
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and land
tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a license to operate in the area.
Exploration
done by
other parties
Acknowledgment and appraisal of exploration by other parties.
Geology
Deposit type, geological setting and style of mineralisation.
Tenements forming the companies Lake Seabrook Project are
E77/2592,E 77/2532,E 77/2533, E77/2537,E77/2563
Tenements are all granted.
All tenements are held 100% by Parkway Minerals NL
There is no registered native title claim over the project area .
There are currently no recorded national parks or reserves within the
area of the tenements.
No exploration weork for potash has been undertaken on the lake
in the past.
Previous work has explored the area for gold, iron ore, tungsten ,
copper but little work appears to have been completed on the
surface of the lake
The principal commodity being explored for is potassium within arid
salt lakes. Two types of deposit models are being used. Near
8
Criteria
Drill hole
Information
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
JORC Code explanation
Commentary
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
9
surface enrichment of potassium in brines that can be concentrated
and extracted by surface trenching, and potassium rich brines within
deeper channel sands that are believed to be developed and the
base and within the lake profile.
Details of the location of the samples reported is provided in the
body of the report
Sample results are presented as reported by the laboratory, no
weighting, or application of high grade or low grade cuts have been
applied.
The lake sediments hosting the potential mineralisation within the
lake sediments or brines are flat lying, There is likely to be both
vertical and horizontial zonation withn the deposit .
No down hole intervals of mineralisation have been reported.
Appropriate plans and maps are provided in the body of the report
Criteria
JORC Code explanation
Commentary
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
All results have been included.
Other
substantive
exploration
data
Further work
10
Exploration work completed on the project at this stage is preliminary
in nature. Other work completed by the Company has included open
file search and acquisition and reprocessing of open file and
government geophysical datasets
The Company intends to undertake additional surface sampling and
mapping. This work will be followed by surface geophysical surveys
including passive seismic and gravity to locate channels followed by
aircore drill testing.
Share your feedback
Discover