Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
ASX Announcement
30 July 2018
___________________________________________________________________________________________
COMPANY DETAILS
JUNE 2018 QUARTERLY REPORT
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Parkway Minerals NL
Level 1, 675 Murray St.
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6872
W www.parkwayminerals.com.au
E info@parkwayminerals.com.au
P +61 8 9479 5386
Parkway Minerals (“Parkway” or “The Company”) is pleased to provide an
update of activities for the June 2018 quarter.
HIGHLIGHTS
Dandaragan Trough Project
• Drilling confirms significant thickness of Molecap greensands at
Dambadgee.
Davenport Resources (44.3 Million shares held, 33%)
• Historic Resource reported for 3rd mining licence, Ohmgebirge
o 149 Mt at 13.5% K2O, predominantly Silvinite
• $2.1 M raised.
F +61 8 9475 0847
Strategic Investment
• PWN owns 7.32 Million Lithium Australia shares
ASX CODE
PWN
FRANKFURT CODE
A1JH27
Lake Barlee Project
• Drill programme completed.
CORPORATE
INFORMATION
30 July 2018
594M Ordinary shares
123M Partly paid shares
17M Listed Options
13M Unlisted options
Fertiliser Markets
• Potash prices are firming, with MOP and SOP 20 to 30% above historic
lows
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director)
1
Parkway Minerals NL – Quarterly Report
June 2018
LAKE BARLEE PROJECT
A proof of concept drilling programme was carried out at Lake Barlee. 9 holes were drilled for a total of
728 metres. The drilling confirmed the existence of the deep palaeochannels predicted by prior geophysical
survey. Assays were received in late July and are still being reviewed.
LAKE SEABROOK PROJECT
Parkway has applied for exploration licences in the Lake Seabrook area, north of Southern Cross.
DANDARAGAN TROUGH PROJECT
Parkway holds 100% the Dinner Hill Potash and Phosphate Deposit, located some 200km north of Perth in
Western Australia, (Figure 1). Dinner Hill forms part of the larger Dandaragan Trough Project (DTP), where
Parkway holds over 1,000km2 of exploration tenure. Sedimentary rocks within the trough contain
glauconite, a potash rich mica, and phosphate nodules. The objective is to produce phosphate and potash
fertilisers and a range of valuable by-products from the phosphate and glauconite present within the
sediments of the Dandaragan Trough. The Dinner Hill Project covers some +332 km2 within the DTP.
A drilling programme was completed on the Dambadgee prospect and the Dinner Hill South area. 40 Holes
were drilled for a total of 1788 metres. Several intersections exceeding 40 metre thicknesses of Molecap
Greensands were recorded at Dambadgee. Assay results for all the samples are awaited.
2
Parkway Minerals NL – Quarterly Report
June 2018
Figure 1: Location plan, Dandaragan Trough Project
The DTP has unique advantages of excellent connectivity to transport facilities, infrastructure and proximity
to local and regional markets. It is located within an easy drive from Perth, and is less than 200km from
two major bulk export ports, Kwinana and Geraldton. It is well situated in relation to major project
infrastructure, and significant local and regional markets for its products.
3
Parkway Minerals NL – Quarterly Report
June 2018
Dinner Hill Resource Statement
The resources for the Dinner Hill project were recalculated during September 2017 and reported to ASX on
26 September. The resources cover an area of approximately 52 km2 and are shown in table 1.
DINNER HILL RESOURCE
Table1 Dinner Hill Deposit: Resource Summary
Resource
Category
Phosphate
Indicated
Inferred
Total
Tonnes
(Mt)
160
470
630
Indicated
Inferred
Total
160
470
630
4.2
4.4
4.4
Potash Resource outside the
Phosphate Resource area
Indicated
Inferred
Total
50
230
280
2.65
2.6
2.6
Total Potash Resources
Indicated
Inferred
Totals
210
700
910
3.8
3.8
3.8
Potash
Potash Resources included within
the Phosphate Resource area
P2O5
(%)
2.45
1.7
1.85
K2O
(%)
Note: Totals may differ from sum of individual items due to rounding
DAVENPORT RESOURCES
Davenport Resources (DAV) is focused on the development of the South Harz potash field in Thuringia,
Central Germany. Davenport owns 2 exploration licences and 3 mining licences (figs 2 & 3). The mining
licences were purchased from the German Government in late 2017 (ASX release 25 October 2017) and are
perpetual, with no expenditure or royalty commitments. The mining licences were subject to detailed
drilling in 1960s and 80s, when the field was owned by the Government of East Germany. Data from over
100 drill holes is available. Review of the drill data is in progress and has allowed reporting of significant
historic (Soviet era) resources. Historic Resources were reported on the Ohmgebirge licence (refer ASX
Announcement 18 June 2018). This has added to the Historic Resource inventory on the Mülhausen-Nohra
and Ebeleben Licences
Review of Ebeleben drilling data has allowed the estimation of a JORC Inferred Resource of 324 M tonnes
of Silvinite at 15.6% K2O, with additional Carnallatite resources present. A similar programme is in progress
for Mülhausen-Nohra.
4
Parkway Minerals NL – Quarterly Report
June 2018
Figure 2: South Harz Project Location
Figure 3: Location of mining and exploration licences
5
Parkway Minerals NL – Quarterly Report
June 2018
SHAREHOLDINGS
Parkway owns shares in the following ASX listed Companies:
• Lithium Australia (ASX: LIT)
7.32 M
• Davenport (ASX: DAV)
44.3 M
Parkway participating in a Davenport capital raising, purchasing an additional 7.2 M shares at 7c.
CORPORATE
Parkway completed a $500K capital raising, used to maintain our shareholding in Davenport Resources.
Parkway monitors activities and opportunities that may be relevant to the Company’s objectives. This may
include expanding or changing the scope of existing projects or engaging with third parties on other
projects. If a proposal advances, details would be announced in accordance with the Company’s continuous
disclosure obligations.
ANNOUNCEMENTS
The following ASX announcements were made during the quarter:
29/06/2018
s708A Notice, Appendix 3B & Appendix 3Y's
25/06/2018
Reinstatement to Official Quotation
25/06/2018
Parkway Minerals Completes Private Placement
21/06/2018
Suspension from Official Quotation
19/06/2018
Proactive Investors Parkway Minerals Interview
19/06/2018
Trading Halt
06/06/2018
PWN Announces Commencement of Brine Drilling on Lake Barlee
31/05/2018
Potassium Recovery Patent Granted for Parkway Minerals
The following ASX announcements were made after the close of the period:
24/07/2018
12/07/2018
10/07/2018
Becoming a substantial holder
Notice of General Meeting/Proxy Form
Change in substantial holding for DAV
CASH ON HAND
At 30 June 2018, $1.16 million cash was available.
6
Parkway Minerals NL – Quarterly Report
June 2018
For further information contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Email: info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
Peter Nesveda
Investor Relations
+61 (0) 412 357 375
peter.nesveda@parkwayminerals.com.au
About Parkway Minerals
Parkway Minerals (ASX: PWN) is a company focused on developing fertiliser feedstock projects. The
Company holds 1,900km2 of exploration licenses and applications over Lake Barlee, where it is exploring a
sulphate of potash project from the brines in the lake, north of Southern Cross in Western Australia.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 1,050km2 in the greensand deposits of the
Dandaragan Trough, in Western Australia’s Perth Basin. The area is prospective for both phosphate and
potash. Previous exploration indicates glauconite sediments are widespread for more than 150km along
strike and 30km in width. The project is well situated in relation to infrastructure, with close access to rail,
power and gas. A successful commercial outcome will allow the Company to become a major contributor
to the potash and phosphate markets at a time of heightened regional demand.
The Company owns 44.3M shares (33%) of Davenport Resources, which owns a potash exploration project
in the South Harz region of Thuringia, in Central Germany. The region has been a potash producing area for
over 100 years.
Competent Person’s Statement:
Dandaragan Trough Project
Information in this announcement that relate to Mineral Resources, are based on, and fairly represent, the
Mineral Resource and supporting documentation extracted from the reports which have been prepared by a
Competent Person in compliance with the JORC Code (2012) and released to ASX by the Company on 26
September 2017 and 28 September 2017. Parkway Minerals confirms that it is not aware of any new
information or data that materially affect the information included in the original announcements. All
material assumptions and technical parameters underpinning the Mineral Resource estimate in those
previous ASX releases continue to apply and have not materially changed. The Company further confirms
that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
7
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Parkway Minerals NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
30 June 2018
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date
(12 months)
$A’000
(18)
13
(323)
(776)
(d) staff costs
(79)
(431)
(e) administration and corporate costs
(88)
(765)
13
21
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
88
1.9
Net cash from / (used in) operating
activities
(495)
(1,850)
2.
Cash flows from investing activities
2.1
Payments to acquire:
-
(98)
(500)
(500)
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
(500)
(598)
431
1,808
Other (Equity Raising Costs)
(53)
(76)
3.10
Net cash from / (used in) financing
activities
378
1,732
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,782
1,881
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(495)
(1,850)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(500)
(598)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
378
1,732
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
1,165
1,165
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
745
132
5.2
Call deposits
420
1,650
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,165
1,782
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
79
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation Contributions.
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
108
9.5
Administration and corporate costs
71
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and location
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
-
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E29/1003
E29/1027
E70/5102
E77/2529
E77/2532
E77/2533
E77/2537
+ See chapter 19 for defined terms
1 September 2016
$A’000
333
512
Interest at
beginning
of quarter
Interest
at end of
quarter
-
-
-
Application
0%
0%
Nature of interest
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here:
Date: 30 July 2018
(Director/Company secretary)
Print name: Patrick McManus
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have been
financed for the past quarter and the effect on its cash position. An entity that wishes to disclose
additional information is encouraged to do so, in a note or notes included in or attached to this
report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources
and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been
prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule
19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5
Share your feedback
Discover