MARCH 2018 QUARTERLY REPORT
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Parkway Minerals NL
Level 1, 675 Murray St.
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6872
W www.parkwayminerals.com.au
Parkway Minerals (“Parkway” or “The Company”) is pleased to provide an
update of activities for the March quarter.
HIGHLIGHTS
Lake Barlee Project
All approvals received for first drilling programme
Negotiations in progress with drilling companies
Strategic Investment
PWN owns 7.32 Million Lithium Australia shares
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
OTC PINK CODE
PWNNY
Davenport Resources (37.1 Million shares held, 34%)
Large JORC Inferred Resource confirmed at Ebeleben, 577 M tonnes at
12.1% K2O, comprising:
324 M tonnes Silvinite at 15.6% K2O, and
252 M tonnes of Carnallatite at 7.5% K2O
Historical resource confirmed at Mulhausen-Nohra, 1.1 B tonnes at
10.4% K2O
Milestone 1 shares received, after period end
CORPORATE
INFORMATION
24 April 2018
534M Ordinary shares
123M Partly paid shares
17M Listed Options
4M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Natalia Streltsova
(Non-Executive Director)
1
Parkway Minerals NL – Quarterly Report
March 2018
LAKE BARLEE PROJECT
The Lake Barlee Project consists of 11 Exploration Licences and 2 ELAs, covering 1939 sq km, (fig 1).
The lake is prospective for potash extraction from brine, with surface sampling indicating high potassium
values and geophysical surveys indicating the existence of deep palaeochannels (fig 2). All approvals for
drilling have been received. Discussions are in train with drilling companies. Drilling has been delayed by
the availability of the specialized drilling rigs required for work on salt lakes.
Figure 1 Lake Barlee Project area.
2
Parkway Minerals NL – Quarterly Report
March 2018
Figure 2 Lake Barlee : Seismic responses, interpreted palaeochannels and drill targets
Parkway has applied for additional exploration licences in the Lake Seabrook area, north of Southern Cross.
DANDARAGAN TROUGH PROJECT
Parkway has continued to hold the Dinner Hill Potash and Phosphate Deposit, located some 200km north
of Perth in Western Australia, (Figure 3). Dinner Hill forms part of the larger Dandaragan Trough Project
(DTP), where Parkway holds over 1,000km2 of exploration tenure. Sedimentary rocks within the trough
contain glauconite, a potash rich mica, and phosphate nodules. The objective is to produce phosphate and
potash fertilisers and a range of valuable by-products from the phosphate and glauconite present within
the sediments of the Dandaragan Trough. The Dinner Hill Project covers some +332 km2 within the DTP.
3
Parkway Minerals NL – Quarterly Report
March 2018
Figure 4: Location plan, Dandaragan Trough Project
The DTP has unique advantages of excellent connectivity to transport facilities, infrastructure and proximity
to local and regional markets. It is located within an easy drive from Perth, and is less than 200km from
two major bulk export ports, Kwinana and Geraldton. It is well situated in relation to major project
infrastructure, and significant local and regional markets for its products.
4
Parkway Minerals NL – Quarterly Report
March 2018
Dinner Hill Resource Statement
The resources for the Dinner Hill project were recalculated during September 2017 and reported to ASX on
26 September. The resources cover an area of approximately 52 km2, and are shown in table 1.
DINNER HILL RESOURCE
Table1 Dinner Hill Deposit: Resource Summary
Resource
Category
Phosphate
Indicated
Inferred
Total
Tonnes
(Mt)
160
470
630
Indicated
Inferred
Total
160
470
630
4.2
4.4
4.4
Potash Resource outside the
Phosphate Resource area
Indicated
Inferred
Total
50
230
280
2.65
2.6
2.6
Total Potash Resources
Indicated
Inferred
Totals
210
700
910
3.8
3.8
3.8
Potash
Potash Resources included within
the Phosphate Resource area
P2O5
(%)
2.45
1.7
1.85
K2O
(%)
Note: Totals may differ from sum of individual items due to rounding
DAVENPORT RESOURCES
Davenport Resources (DAV) is focused on the development of the South Harz potash field in Thuringia,
Central Germany. Davenport owns 2 exploration licences and 3 mining licences (figs 4 & 5). The mining
licences were purchased from the German Government in late 2017 (ASX release 25 October 2017) and are
perpetual, with no expenditure or royalty commitments. The mining licences were subject to detailed
drilling in 1960s and 80s, when the field was owned by the Government of East Germany. Data from over
100 drill holes is available. Review of the drill data is in progress and has allowed reporting significant
historic (Soviet era) resources (refer announcements 15 & 16 November 2017)
Due to the high quality of the drilling information it has been possible to use the historic data to estimate a
JORC inferred resource on the Ebeleben licence, after the period, (DAV ASX announcement 16 April 2018),
that resource includes 324 M tonnes of silivinite at a grade of 15.6% K2O. Work is now in progress to
evaluate other historical resources.
Confirming the Ebeleben resource triggered the Milestone 1 of the Vendors Agreement (refer DAV ASX
release 19 Jan 2017) and Parkway were issued a further 17.9 M Davenport shares. Parkway now owns 37.1
M shares.
5
Parkway Minerals NL – Quarterly Report
March 2018
Figure 4: South Harz Project Location
Figure 5: Location of mining and exploration licences
SHAREHOLDINGS
Parkway owns shares in the following ASX listed Companies:
Lithium Australia (ASX LIT)
7.32 M
Davenport (ASX:DAV)
37.1 M
6
Parkway Minerals NL – Quarterly Report
March 2018
Parkway owned 17.9 M milestone 2 Davenport shares that would have converted to shares on the decision
to mine being made by January 2022. Discussions with engineering groups and regulators indicated that
that timing was very ambitious and discussions with potential investors indicated that the milestone shares
were a disincentive to invest. Consequently the holders of the milestone 2 shares agreed to cancel them.
This was achieved on 10 April 2018 (refer DAV: ASX release 10 April 2018).
CORPORATE
During January 2018 Parkway entered into a Controlled Placement Agreement (CPA) with Acuity Capital.
The CPA will provide PWN with up to $3 million of standby equity capital over the coming 3 years. PWN
retains full control of all aspects of the placement process: having sole discretion as to whether or not to
utilize the CPA, the quantum of issued shares the minimum issue price of shares and the timing of each
placement tranche, if any. There are no requirements for PWN to utilize the CPA and PWN may terminate
the CPA at any time, without cost or penalty. Acuity Capital and the CPA do not place any restrictions, at
any time, on PWN raising capital through other methods. If PWN utilizes the CPA, PWN is able to set a floor
price ( at its sole discretion) and the final issue price will be calculated as the greater of that floor price, set
by PWN, and a 10% discount to a Volume weighted Average Price (VWAP) over a period of PWN’s choosing
( at the sole discretion of PWN).
As collateral for the CPA, PWN has agreed to place 24 million shares from its LR7.1 capacity at nil
consideration to Acuity Capital (collateral shares). PWN may, at any time, cancel the CPA and buy back the
Collateral Shares for nil consideration (subject to shareholder approval). Refer to PWN ASX release 19
January 2018
Parkway monitors activities and opportunities that may be relevant to the Company’s objectives. This may
include expanding or changing the scope of existing projects or engaging with third parties on other
projects. If a proposal advances, details would be announced in accordance with the Company’s continuous
disclosure obligations.
ANNOUNCEMENTS
The following ASX announcements were made during the quarter:
16/03/2018
Half Year Accounts
07/03/2018
Company Secretary Appointment/Resignation
06/03/2018
Proactive Investors Note on Parkway Minerals
27/02/2018
Appendix 3B
21/02/2018
Presentation to Wholesale Investors Conference February 2018
19/01/2018
Change of Directors Interest Notices
19/01/2018
Quarterly Activities and Cashflow Report
19/01/2018
Appendix 3B
The following ASX announcements were made after the close of the period:
17/04/2018
Large Increase in Historic Resources at South Harz
05/04/2018
Change in substantial holding for DAV
04/04/2018
Parkway Issued a Further 17.9M Davenport Shares
03/04/2018
Clarification- JORC Compliant Resource at South Harz Project
03/04/2018
JORC Compliant Resource Established at South Harz Project
CASH ON HAND
At 31 March 2018, $1.78 million cash was available.
7
Parkway Minerals NL – Quarterly Report
March 2018
For further information contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Email: info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
About Parkway Minerals
Parkway Minerals (ASX: PWN) is a company focused on developing fertiliser feedstock projects. The
Company holds 1,900km2 of exploration licenses and applications over Lake Barlee, where it is exploring a
sulphate of potash project from the brines in the lake, north of Southern Cross in Western Australia.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 1,050km2 in the greensand deposits of the
Dandaragan Trough, in Western Australia’s Perth Basin. The area is prospective for both phosphate and
potash. Previous exploration indicates glauconite sediments are widespread for more than 150km along
strike and 30km in width. A pre-feasibility study is in progress for stage 1, production of phosphate
fertilisers. The project is well situated in relation to infrastructure, with close access to rail, power and gas.
A successful commercial outcome will allow the Company to become a major contributor to the potash and
phosphate markets at a time of heightened regional demand.
The Company owns 37.1M shares (34%) of Davenport Resources, which owns a potash exploration project
in the South Harz region of Thuringia, in Central Germany. The region has been a potash producing area for
over 100 years.
Competent Person’s Statement:
Dandaragan Trough Project
Information in this announcement that relate to Mineral Resources, are based on, and fairly represent, the
Mineral Resource and supporting documentation extracted from the reports which have been prepared by a
Competent Person in compliance with the JORC Code (2012) and released to ASX by the Company on 26
September 2017 and 28 September 2017. Parkway Minerals confirms that it is not aware of any new
information or data that materially affect the information included in the original announcements. All
material assumptions and technical parameters underpinning the Mineral Resource estimate in those
previous ASX releases continue to apply and have not materially changed. The Company further confirms
that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
8
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Parkway Minerals NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
31 March 2018
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date
(9 months)
$A’000
11
31
(123)
(453)
(d) staff costs
(140)
(352)
(e) administration and corporate costs
(125)
(677)
5
8
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
88
1.9
Net cash from / (used in) operating
activities
(372)
(1,355)
2.
Cash flows from investing activities
2.1
Payments to acquire:
-
(98)
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (Equity Raising Costs)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
(98)
1,377
(23)
-
1,354
2,154
1,881
(372)
(1,355)
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(98)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
1,354
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
1,782
1,782
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
132
354
5.2
Call deposits
1,650
1,800
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,782
2,154
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
140
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation Contributions.
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
145
9.5
Administration and corporate costs
148
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and location
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
-
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
E29/1003
E29/1027
E70/5102
E77/2529
+ See chapter 19 for defined terms
1 September 2016
$A’000
400
693
Nature of interest
Interest at
beginning
of quarter
Interest
at end of
quarter
-
-
-
Application
0%
0%
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here:
Date: 24 April 2018
(Director/Company secretary)
Print name: Patrick McManus
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity that wishes to
disclose additional information is encouraged to do so, in a note or notes included in or attached
to this report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5
Share your feedback
Discover