ASX Announcement
28 JULY 2022
JUNE 2022 – QUARTERLY REPORT
Highlights
PARKWAY PROCESS SOLUTIONS (PPS)
§
§
§
Industrial Product Range
§
Continued expansion of industrial water treatment related product range.
§
Progressed development of modular water treatment systems for rapid deployment.
Expanded Operations
§
PPS-Perth relocating to significantly larger facility, to support business growth.
§
PPS-Melbourne leased second warehouse, to be established as fabrication workshop.
Business Development
§
Continued success in securing new business from diverse range of companies, for the
provision of industrial water treatment related products, services, and solutions.
§
Designed, fabricated, installed, and commissioned an integrated membrane-based
water treatment plant for a major mining company to treat mine pit water.
PARKWAY PROCESS TECHNOLOGIES (PPT)
§
Continued progress in leveraging proprietary process technology platform to support existing
& emerging business development initiatives in a range of industrial applications.
§
Core Technologies:
§
Ongoing technoeconomic evaluations supporting aMES® commercialisation.
§
Awarded material contract by Shell for feasibility study based on iBC® technology.
§
Construction of scaled-up New iBC® Pilot Plant, with mechanical completion imminent.
§
Third-Party Technologies: performed piloting activities incorporating innovative technologies.
§
Commercialisation Activities: include ongoing technoeconomic evaluations to demonstrate the
substantial operational, financial and sustainability advantages of the technology portfolio.
PARKWAY CORPORATE (PCL, GROUP)
§
Increased ownership in the Karinga Lakes Potash Project (KLPP-JV) to 40% working interest.
§
Group sales increased to $1.2 million, with cash receipts of $0.9 million, underpinned by a
rapidly growing project backlog, with high likelihood of revenue conversion in the near term.
§
Strong balance sheet with $4.1 million in cash reserves as at 30 June 2022.
§
Cash balance excludes grant funds, R&D tax incentive rebate for FY22 and other receivables.
Parkway Corporate Limited (“Parkway” or the “Company”) (ASX: PWN) is pleased to report its activities
for the quarter ending 30 June 2022. This report is presented by operating division (strategic busines
unit), as follows:
§
Parkway Process Solutions (PPS)
§
Parkway Process Technologies (PPT)
§
Parkway Ventures (PV)
§
Corporate (Parkway Group)
PARKWAY PROCESS SOLUTIONS (PPS)
Parkway Process Solutions (Parkway Process Solutions Pty Ltd, PPS) is a wholly owned subsidiary
and the primary operating division of the Company.
Business & Corporate Development
Growth of PPS
Parkway continues to strategically expand the operations of PPS, by pursuing a range of commercial
opportunities relating to industrial water treatment, predominantly in Australia. With growing inhouse
engineering and technical services capabilities, an innovative product and services offering, and
established operations in Perth, Melbourne and Darwin, PPS is increasingly well placed to secure larger
industrial water treatment related opportunities moving forward. To support the ongoing growth of PPS,
particularly the planned expansion of fabrication, assembly and testing related capabilities, during the
reporting period, the Company secured leases for two additional warehouse facilities (additional details
outlined in the Activities Subsequent to Reporting Period, section of this report).
In addition to generating growing revenues through the provision of conventional water treatment
solutions, PPS is increasingly supporting the commercialisation of the Company’s next-generation
technology portfolio, including the delivery of highly differentiated integrated water treatment and
industrial process solutions.
Business Development
During the reporting period, PPS continued to improve its market penetration by securing new business
from a diverse range of companies, for the provision of industrial water treatment related products,
services, and solutions. Following the preliminary launch of PPS on 08 Jul 2021, PPS has rapidly
established a substantial client base, which includes large mining and energy companies, a diverse
range of industrial companies, as well as engineering services, government and municipal clients.
In support of these new and existing business development activities, PPS continued to progress the
development of a modular water treatment capabilities, specifically designed for rapid deployment in a
range of high value applications. PPS continues to receive encouraging feedback regarding the
advantages of a modular system, including in relation to PPS’s design and post-sale support (service
and consumables) related capabilities, which is increasingly important for customers, particularly given
the supply chain challenges being experienced, globally.
Importantly, the growing inhouse product development capabilities, are also assisting PPS in designing,
fabricating, and delivering modular water treatment (and related process) plants, incorporating
technologies being commercialised by Parkway Process Technologies (PPT, see below).
In addition to the projects outlined below, PPS continues to progress a broad range of business
development opportunities, including collaborations with several previously foreshadowed companies.
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
2
Mine Pit Water Treatment Plant
The Company previously advised it had been awarded a project to design, build and supply an
integrated water treatment plant and related infrastructure (mine pit pump, mine pit hoses, tanks and
pipework) for a major global mining company. The integrated membrane-based water treatment plant
was designed to use mine pit water as the feedwater and produce treated water for a critical
downstream industrial process. During the quarter, the Company finalised the design, procurement,
fabrication, transport, installation, and commissioning of the mine pit water treatment plant, achieving
an extremely tight project delivery schedule, demonstrating the rapidly growing capabilities of the
Company. The extensive water treatment related product inventory held in stock by PPS, was pivotal
to the award and being able to deliver the project, in a timeframe which would ordinarily be considered
unachievable, particularly given current supply chain related challenges. This project is a good
illustration of how PPS is making solid progress in becoming a preferred water treatment related solution
provider, for key industrial customers that are strategically important to the Company.
Based on the successful delivery of the mine pit water treatment plant, the parties have also been
exploring the scope for a second containerised water treatment plant, which the Company anticipates
will be awarded, later this year.
In a separate scope of work in relation to the operations of the same major global mining company, the
Company also completed a preliminary water treatment plant design on behalf of an engineering
contractor, supporting a proposed expansion of the existing mine.
Wastewater Treatment Plant Study
PPS performed a range of piloting related activities, associated with an early-stage preliminary
engineering study, intended to assist a government entity to treat a problematic wastewater stream,
onsite. Based on the encouraging results from the piloting activities, the Company intends to use the
findings of the study, including the piloting related results, to potentially provide a toll treatment solution
for the customer, in partnership with an established collaboration partner specialised in the sector.
PARKWAY PROCESS TECHNOLOGIES (PPT)
Parkway Process Technologies (Parkway Process Technologies Pty Ltd, PPT) continued to make
progress in leveraging its proprietary (core) process technology platform to support existing and
emerging business development initiatives. PPT also continues to make progress with a range of thirdparty process technologies, that enable Parkway to provide a broader range of synergistic industrial
process technologies.
Many of the developments outlined in the Parkway Process Solutions (PPS) section, are being pursued,
as they also support the ongoing commercialisation of the PPT technology portfolio. PPT continues to
receive unsolicited enquiries from a range of prospective clients requiring sophisticated industrial
process expertise, particularly in the field of processing hypersaline brines, including but not limited to
potash and lithium containing brines.
The Company has previously disclosed, it is collaborating with a Middle Eastern EPC (engineeringprocurement-construction) company, to explore the feasibility of expanding the operations of a major
salt works project, to potentially include an integrated downstream chemical complex. Subject to
suitable contractual arrangements being finalised, Parkway expects to support (through a sub-contract
entered into with the EPC company in its capacity as contractor) the EPC company to provide a range
of services, including process expertise relating to the beneficial processing of hypersaline brines for
the recovery of saleable salt derived products. The EPC company and client are especially interested
in PPT’s range of proprietary technologies, particularly aMES®, in an effort to achieve the production of
a broader and higher value product mix from the brine resource. Given the prospect of the historical
salt works operations, potentially evolving into a large industrial chemical complex, and the Company’s
existing global strategic partnership with Worley to commercialise the aMES® technology, a broader
project consortium may be established, as the feasibility study proposal is evaluated by the client.
PPS provided extensive support to the EPC company during the quarter to finalise a proposal to perform
the proposed feasibility study, with the proposal submitted to the client in late July.
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
3
Core Technologies – iBC®
The iBC® technology involves the pre-treatment of complex brines, particularly from the energy, mining
and other industrial sectors, enabling further downstream processing, to reduce wastewater volumes
and potentially recover a range of valuable chemical products.
Recent evaluations continue to provide encouragement that in addition to achieving significant
wastewater volume reductions, the application of the iBC® technology is likely to be able to achieve a
highly desirable zero-liquid discharge (ZLD) solution for certain applications. The advantages of a ZLD
approach, incorporating an iBC® based processing route, also has the potential to create a valuable
revenue stream, through the sale of industrial chemicals, particularly sodium hydroxide.
Following recent agreements centred on the iBC® technology with global engineering company Worley
(10 Feb 2022) and global energy company Shell (7 Apr 2022), the Company is also exploring several
large-scale and high-value applications of the iBC® technology with a range of industrial companies.
Discussions with a major global chemical company, have identified a significant opportunity for the iBC®
technology to treat various complex wastewater streams generated from an industrial process, at
operations in North America.
New iBC® Pilot Plant
In order to support the ongoing commercialisation of the iBC® technology, the Company has finalised
the fabrication of a New iBC® Pilot Plant, which is expected to achieve mechanical completion
imminently. The New iBC® Pilot Plant will assist the Company perform larger scale test work, further
optimise process conditions, and produce product samples, for industry evaluation. The New iBC® Pilot
Plant will also support a range of ongoing commercial discussions with a range of key stakeholders,
including prospective clients and partners.
The feasibility study contract recently awarded to the Company by QGC (a Shell Group company), will
incorporate a range of process piloting related activities, including with the New iBC® Pilot Plant, as
shown below (Figure 1).
Figure 1: New iBC® Pilot Plant, installed at Victoria University, Institute for Sustainable Industries & Liveable Cities (ISILC)
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
4
Feasibility Study Contract Awarded by Shell
On 7 Apr 2022, the Company announced it had been awarded a material contract, a feasibility study,
by QGC Pty Limited, a Shell Group company. The material contract is based on Parkway performing a
range of evaluations and assessing the feasibility of treating waste brine derived from two of QGC’s
coal seam gas (CSG) based, water treatment plants, with Parkway’s patented iBC® technology.
Immediately prior to announcing the feasibility study award, the Company provided an updated market
assessment, indicating that the potential market opportunity for the iBC® technology was in the order of
$307 million/yr, or up to $9.2 billion1 over the life of existing CSG projects operating in Queensland,
Australia. Further details regarding the potential market opportunity for the iBC® technology are outlined
in the 07 Apr 2022 announcement.
Immediately after executing the feasibility study contract, a multidisciplinary project team was
established with senior staff from Shell, Worley and Parkway, agreeing to a project charter, and
collaborating under the mantra of “one team”. The project team has been meeting regularly, to ensure
the investigations and outputs relating to the feasibility study are consistent with the agreed scope, are
of the highest quality, and align closely with the requirements of the client, Shell.
The feasibility study related activities are divided into five broad areas, which are associated with
respective payment milestones. As of the end of the reporting period, the Company had been paid for
the first milestone, completed and invoiced the second milestone, and had commenced activities
associated with the third milestone, the process experimentation and piloting phase. Additional
information about the ongoing iBC® feasibility study related experimentation, including recent findings
and upcoming piloting related activities, is outlined in the Activities Subsequent to Reporting Period,
section of this report.
In order to support the potential deliverability of a commercial-scale project, the project team has also
been evaluating the preferred project installation site proposed by Shell, an existing industrial QGC site
with extensive infrastructure, located proximal to the two wastewater treatment plants generating the
waste brine that is the subject of the iBC® based feasibility study.
Core Technologies – aMES®
The aMES® technology enables the processing of concentrated industrial process and wastewater
streams including brine solutions, to recover a range of valuable compounds, reagents, and fresh water.
In late 2020, the Company finalised the Karinga Lakes Potash Project – Pre-feasibility Study (KLPPPFS), which assisted the Company to demonstrate the significant advantages of the aMES® technology
in a sulphate of potash (SOP) related application. In conjunction with the KLPP-PFS, a new state-ofthe-art aMES® pilot plant was commissioned, providing the Company with an important process
demonstration, optimisation and validation capability, an essential requirement for successful
commercialisation of the aMES® technology.
The performance data generated by the aMES® pilot plant, is providing important information that will
impact the engineering design of a commercial-scale modularised aMES® plant.
An important advantage of the aMES® technology that is of increasing interest in SOP production, is
that the aMES® technology incorporates a direct induced crystallisation approach, which avoids the
requirement for flotation-based processing. Recent experiences with flotation by various SOP projects
under development in Australia, highlight the challenges associated with flotation-based flow sheets,
particularly when processing feed salts of varying quality, which invariably occurs, when dealing with
natural evaporation derived mixed (KTMS type) salts.
In relation to the aMES® technology, during the reporting period, the Company continued to perform a
range of technoeconomic evaluations as well as engage in discussions with several parties, to further
advance a range of prospective commercial arrangements.
Additional details regarding a proposed feasibility study for a salt works project, which may incorporate
the aMES® technology, are outlined above.
1 Estimates based on evaluations performed by the Company, incorporating information from a range of public and internal sources. These estimates are provided for illustrative purposes
only and should not be relied on for any investment related purposes. All estimates are subject to review, and may be revised or withdrawn, without notice.
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
5
Core Technologies – Other
By leveraging the process engineering capabilities of the Company, PPT has been able to develop
innovative applications for a range of water treatment processes, to achieve improvements in the
processing and treatment of challenging industrial wastewater streams. The Company continues to
make progress with several innovative technologies, addressing a range of industrial applications,
particularly complex wastewater streams, associated with large scale energy and mining operations.
Additional target applications include the removal and/or recovery of organic compounds and/or
nutrients from a range of industrial waste streams. In order to advance technology development and
commercialisation targeting this market segment, the Company will shortly commence a new project
titled, “An integrated water treatment process for valuable nutrient recovery and purification from
industrial waste streams”. This project is supported by Australian Research Council (ARC) funding, with
additional details provided in the Research Grant Funding section of this report.
In addition, the Company continues to develop new technologies as well as identify additional
applications for its portfolio of proprietary process technologies, to solve high-value problems facing
industry.
Third-Party Technologies – Various
As part of efforts to further expand the coverage of Parkway’s cutting-edge technology portfolio, the
Company is continually evaluating a range of prospective technology platforms. The most attractive
technology platforms are those that not only provide substantial efficiency, financial and sustainability
related advantages over conventional processes, but are also highly complementary with Parkway’s
existing (core) technologies.
During the reporting period, PPT continued to develop and assess the feasibility of a variety of
innovative industrial water treatment related technologies. This process typically incorporates a range
of desktop, experimental and piloting related activities. Results to date have demonstrated
improvements in the treatment of complex wastewater streams containing both organic and inorganic
substances, including the removal of emerging and highly problematic contaminants, such as PFAS.
Encouragingly, the Company continues to make strong progress in building a portfolio of technologies,
capable of providing a highly integrated process solution, for a range of wastewater and process
streams traditionally considered difficult to treat. Potential applications for these emerging technologies
include, but are not limited to, the treatment of a range of complex industrial wastewater streams, acid
and metalliferous drainage (AMD), municipal waste streams including landfill leachate.
As part of PPS’s growing modular product development capabilities, the Company continues to invest
in developing capabilities to build modular systems based on commercial scale equipment, including
incorporation of a range of technologies, an innovative membrane-based technology as well as
advanced oxidation technology.
Commercialisation Activities
Parkway continues to perform a range of evaluations to demonstrate the substantial operational,
financial and sustainability advantages of the technology portfolio, incorporating both the core and thirdparty technologies, as outlined above.
PARKWAY VENTURES (PV)
Parkway Ventures (Parkway Ventures Pty Ltd, PV) holds all resource project and royalty related
interests owned by the Company.
Karinga Lakes Potash Project (KLPP, 40% working interest)
Parkway currently holds an equity interest in the Karinga Lakes Potash Project (KLPP), through
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
6
Parkway Ventures. The KLPP is a joint venture between Verdant Minerals Pty Ltd and Consolidated
Potash Corporation Pty Ltd (a wholly owned subsidiary of the Company), which is administered through
Territory Potash Pty Ltd (JV Operator).
By way of background, on 05 Nov 2020, the Company announced completion of the KLPP-PFS, a prefeasibility study based on the strategic application of the aMES® technology. The Company notes the
recent strength in agricultural commodity markets, is supporting elevated fertiliser prices, with the
primary target product from the KLPP, sulphate of potash (SOP), trading significantly higher than the
prices assumed by the Company in the KLPP-PFS.
Following completion of the KLPP-PFS, a previously disclosed tenement rationalisation process, and
the recent finalisation of joint venture accounting processes, on 24 Jun 2022, the Company announced
it had satisfied the requisite earn-in requirements, resulting in the Company increasing its interest in the
KLPP from 15% to 40%.
As at 30 June 2022, exploration tenure for the KLPP project area was held in the three newly granted
exploration licences, details of which are outlined in the Tenement Interests section of this Quarterly
Report, outlined below.
As a result of a joint venture administration related procedures outlined above, during the quarter, no
substantive mining exploration activities occurred in relation to this project.
Mineral Resources
The Mineral Resource Estimate underpinning the KLPP-PFS is summarised below.
Lake
Mineralisation
Contained in Drainable
Porosity
Indicated Mineral
Resource contained in
Total Porosity that meets
reasonable prospects of
economic extraction
Potassium Tonnage
Potassium Tonnage
Potassium Tonnage
(kt)
(kt)
(kT)
580
430
Production
Lakes included in the mine plan (x8)
Sub Total
300
Remaining Lakes (x16)
Sub total
220
430
Totals
520
1000
430
The Mineral Resource estimate underpinning the production targets in this announcement was
prepared by a competent person in accordance with the requirements of the JORC Code 2012.
COMPETENT PERSONS STATEMENT
Parkway reported the Mineral Resource estimate for the Karinga Lakes Potash Project in accordance
with Listing Rule 5.8 in its ASX announcement dated 5 November 2020. Parkway confirms that it is not
aware of any new information or data that materially affects the information included in the
announcement of 5 November 2020 and that all material assumptions and technical parameters
underpinning the estimates in the announcement of 5 November 2020 continue to apply and have not
materially changed.
Other Resource Projects
During the quarter, the Company continued to consider potential involvement in a number of additional
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
7
resource projects, whereby the Company may contribute its proprietary process technologies related
capabilities, in exchange for the Company receiving agreed equity interests and/or royalties in the
respective project/s. In the event the Company is successful in adopting this strategy, the Company
intends to leverage its technology portfolio to gain economic exposure to additional resources project/s
(including, amongst others, lithium brine projects), without necessarily incurring material balance sheet
exposure. For the avoidance of doubt, this technology commercialisation strategy is consistent with the
previously disclosed innovative business model, being pursued by the Company.
CORPORATE
Quarterly Sales
As a result of ordinary operations, the Company generated group sales of approximately $1.2 million,
with cash receipts of $0.9 million, underpinned by a growing project backlog with high likelihood of
revenue conversion in the near term.
Given the increasing levels of business development activities described above, the ramp-up period
associated with onboarding new projects and typical procurement cycles, there is a timing impact on
working capital, where cash receipts generally lag the corresponding sales and project activities during
the relevant period. Given the significant progress and corresponding investments in PPS and PPT to
date, including the growing project backlog, the Company remains optimistic about building a
sustainable and growing revenue base moving forward.
Funding
During the quarter, the Company experienced moderate cash outflows ($0.4 million), largely as a result
of ongoing investment in the technology portfolio, expanding the operations of Parkway Process
Solutions, as well as funding work in progress, including the associated build-up of inventory.
Notwithstanding the ongoing investment in a range of strategic initiatives including the expansion of
operations, as at 30 June 2022, the Company held cash reserves of $4.1 million, excluding i) undrawn
grant funds, ii) R&D rebate for FY22, and iii) other receivables. The strong cash position means the
Company is well funded to execute the CY2022 business plan, including the continued roll-out of PPS,
to the point where it is anticipated to make an increasingly significant revenue contribution to the group.
Research Grant Funding
The Company has a strong track-record in securing a range of grants, including from the Australian
Research Council (ARC), to support innovative research and development (R&D) and associated
commercialisation related activities. The Company is frequently invited to participate in several research
grant schemes designed to fund innovative research, which the Company intends to pursue, where
research interests align, and commercial arrangements are consistent with the Company’s
requirements.
The Company continues to make progress with several innovative technologies with potential
applications in removal and/or recovery of organic compounds and/or nutrients from a range of
industrial waste streams.
In order to assist in funding these R&D related activities, the Company advised in the most recent
quarterly report, that the Company had applied for (and was subsequently offered) an opportunity to
participate in an ARC supported research hub focused on the circular economy. The Company has
subsequently developed a project titled, “An integrated water treatment process for valuable nutrient
recovery and purification from industrial waste streams”. The overall budget for the project developed
by the Company, is in the order of $1,140,000 (excluding in-kind contributions), over a period of 4 years,
where the Company will be required to make an annual contribution in the order of $125,000, for the
duration of the project. The balance of project funding ($640,000) will be provided by the ARC and the
Company’s longstanding research partner Victoria University, leveraging Parkway’s contribution to
www.parkway-corp.com
JUNE 2022
|
QUARTERLY REPORT
|
8
provide a larger project budget. The Company expects to formally execute the relevant project
agreements imminently.
A proportion of the R&D activities performed at Victoria University in collaboration with the Company,
including the construction, testing and operation of state-of-the-art aMES® and iBC® pilot plants, is
funded by previously awarded grant funding.
The Company acknowledges the financial support of the Australian Government through the Australian
Research Council.
R&D Rebate
As a result of research and development activities performed and/or funded by the Company during
FY21, during the quarter, the Company received an Australian Government research and development
tax incentive (R&DTI) payment in the order of $0.2 million for eligible activities. The Company continues
to fund eligible activities during the reporting period and expects to receive a more significant R&DTI
payment for these activities, as part of an application covering FY22, at a later date.
Other Receivables
The Company has a growing receivables profile made up predominantly of trade receivables generated
through ordinary operations, where the commercial terms result in a delay in receiving certain payments
for works already performed and/or in progress. In addition, as a result of certain post-acquisition related
accounting adjustments, the Company also expects to receive a credit adjustment from a vendor. As a
result, the Company has accumulated net receivables in the order of $0.7 million, which it expects to
be able to realise in the near term.
Cash on Hand
As at 30 June 2022, the company held $4.1 million in cash reserves. As outlined above, it should be
noted that the reported cash balance excludes, i) undrawn grant funds, ii) the anticipated R&D rebate
for FY22, and iii) other receivables.
COVID-19 Impacts
The Company continued to experience a range of disruptions during the quarter, including significant
delays in the transportation of products and restrictions impacting the movement of staff to support
various project and business development related activities. The delay in the transportation of key
products including parts, is an industry wide phenomenon, and has significantly delayed the completion
of several awarded works, and the corresponding recognition of revenues during the period.
Investor Relations
The Parkway group managing director & CEO, Bahay Ozcakmak, provided a number of interviews
during the re