Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
26 October 2023
SEPTEMBER 2023 – QUARTERLY REPORT
Highlights
PARKWAY PROCESS TECHNOLOGIES (PPT)
§
Queensland CSG Opportunity – Master Plan
§
Building Master Plan related capabilities, towards providing industry-wide solution.
§
Active progress in advancing major project, the subject of recent feasibility study.
§
Significant opportunity to provide near-term solutions based on upstream technology.
§
Strong regulatory and stakeholder support with engagement progressing positively.
§
Continued progress in leveraging proprietary process technology platform, to support business
development initiatives, in a range of industrial applications, including in the mining sector.
§
Commercialisation of ongoing R&D activities to be accelerated through Parkway Centre for
Brine Technologies, in support of Master Plan and other key strategic objectives.
PARKWAY PROCESS SOLUTIONS (PPS)
§
Business Development
§
§
Ongoing success in securing new business from a diverse range of clients, for the
provision of industrial water treatment related products, services and solutions.
Strategic Positioning
§
Continued focus on strategically important, particularly process technology focused
projects, with less focus on non-strategic short-term revenue generation.
§
Progressing development of modular water treatment systems incorporating PPT
technologies, with near term applications, including as part of Master Plan.
PARKWAY CORPORATE (PCL, GROUP)
§
Strong quarterly sales, with $1.29 million in revenue generated during the period.
§
Strong cash conversion, with quarterly cash receipts increasing to record $1.56 million.
§
Successful $4 million placement underpins investments in technology, plant & equipment.
§
As of 30 September 2023, the Company held $4.91 million in cash reserves. Reported cash
balance excludes grant funds, R&D tax incentive rebate for FY23 and other receivables.
§
Ongoing investment in inventory, with carrying value at end of period of $1.78 million.
Parkway Corporate Limited (“Parkway” or the “Company”) (ASX: PWN) is pleased to report its activities
for the quarter ending 30 September 2023.
PARKWAY PROCESS TECHNOLOGIES
During the reporting period Parkway Process Technologies (PPT) made significant progress in
leveraging its proprietary process technology platform to support a range of strategic business
development initiatives. Parkway continued to engage with a range of existing and prospective clients
requiring industrial process expertise, particularly in the field of processing complex and concentrated
brines.
Technology Development & Commercialisation
By leveraging the process engineering capabilities of Parkway, PPT continued to build a portfolio of
proprietary technologies, capable of providing highly integrated process solutions, for a range of
complex wastewater and process streams traditionally considered difficult to treat. PPT has also
developed innovative applications for these technologies, including applications resulting in
improvements in the processing and treatment of challenging industrial wastewater streams, particularly
for large scale energy and mining operations.
The development and commercialisation of proprietary technologies remains an important priority for
Parkway, with a range of ongoing activities including technoeconomic evaluations to demonstrate the
substantial operational, financial and sustainability advantages of the PPT technology portfolio.
Whilst coal seam gas (CSG) related wastewater applications are currently a priority for Parkway, recent
evaluations confirm the key process innovations developed by PPT, have broader applications in
treating industrial waste streams beyond the CSG industry, particularly in the mining industry.
Further details regarding PPT, including a recently released capability statement are available at:
https://pwnps.com/collections/parkway-process-technologies
Opportunities in the Mining Industry
Potential applications for the proprietary process technologies developed by PPT include, but are not
limited to, the treatment of a range of complex industrial wastewater streams including brines, as well
as acid and metalliferous drainage (AMD). Parkway is collaborating with a range of parties, in relation
to several mining related opportunities, involving the production of critical minerals, as well as the
potential treatment of complex wastewater streams, through proprietary process technologies
developed by PPT.
Centre for Brine Technologies
As a leading developer of innovative industrial brine processing technologies, Parkway has provided a
range of process technology development related services (process simulation, experimentation,
piloting and related studies) to a range of third parties. To further expand Parkway’s capabilities and
accelerate the commercialisation of PPT technologies, including Master Plan related opportunities and
support the requirements of third parties, Parkway is advancing plans to establish a Centre for Brine
Technologies.
In coming weeks, Parkway expects to consolidate its warehouse footprint in Melbourne, which will
provide access to a suitable facility for the initial establishment of the Parkway Centre for Brine
Technologies. Ongoing discussions to expand the planned Parkway Centre for Brine Technologies to
the Werribee campus of Victoria University, are encouraging and highlight the strong alignment
between Parkway and longstanding strategic partner, Victoria University.
The proposed centre will be supported by Parkway’s existing strategic partners and based on
preliminary exploratory discussions, Parkway expects a proportion of funding required to establish the
centre, to be provided from external sources, including grant-based funding.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
2
Queensland CSG Opportunity – Master Plan
Over the life of currently operating coal seam gas (CSG) projects in Queensland, an estimated 6 million
tonnes of waste salts are expected to be produced. A significant proportion of these salts have already
been produced, in the form of waste brine and are currently being stored in waste brine storage ponds,
awaiting a viable long-term disposal (or processing) solution. The disposal of waste brine and salts, as
contemplated by the CSG industry, presents extensive environmental risks, and remains deeply
unpopular, with significant opposition from various stakeholders, including local farmers and regional
community groups.
Recognising these significant challenges, in recent years, Parkway has systematically developed a
portfolio of proprietary process technologies, to specifically address the waste brine and salt challenges
facing the CSG industry. These technologies have undergone extensive process optimisation, piloting
and technoeconomic evaluations, providing a high level of confidence in the value proposition
presented by these technologies, particularly in comparison to the industry’s planned approach.
Parkway has performed a range of studies based on PPT technologies, including a recently completed
comprehensive feasibility study for a major CSG company with whom Parkway has been collaborating
for several years. This CSG company (a global energy major), has recently issued a request for
proposal to Parkway, in order to further advance the project evaluated during the feasibility study.
Discussions are progressing positively, with Parkway being advised by the client that the next stage of
the project is likely to proceed under the existing contractual framework, providing a basis for the project
to progress in a timely manner.
In addition to the previously disclosed portfolio of proprietary process technologies, Parkway has
recently disclosed the development of a new upstream brine concentration and beneficiation
technology, which is the focus of near-term commercialisation efforts.
Development of New Upstream Brine Concentration & Beneficiation Technology
The transformational CSG brine processing technologies disclosed by Parkway to date, have been
predominantly based on innovative downstream system optimisations, specifically, replacement of
conventional brine concentrators and salt crystallisers with a proprietary process train, developed by
Parkway. Whilst this downstream system optimisation is applicable to all major CSG projects in
Queensland, and capable of delivering highly transformative outcomes, Parkway has previously
identified an opportunity to also develop a complementary upstream system optimisation.
Given the existing water treatment plants associated with 3 of the 4 major Queensland CSG projects
produce a relatively dilute waste brine (currently stored in brine ponds), the potential adoption of an
upstream brine concentration and beneficiation process, would provide significant benefits.
Parkway recently disclosed the successful development of a new upstream technology package which
incorporates several new innovations, as well as core iBC® and aMES® related intellectual property.
The new upstream technology package has already undergone process development, bench-scale
piloting, various engineering studies, and is in the process of being scaled-up, in preparation for nearterm commercialisation, as part of core Master Plan related objectives.
In addition to providing a pathway to subsequent downstream processing, the adoption of the new
upstream technology package, would reduce costs associated with building and maintaining brine
storage ponds, as well as provide a cost-effective brine dewatering option for industry.
Best Available Technology (BAT)
Despite investment of over $100 million by the CSG industry in Queensland over 15 years, no
sustainable option has been identified to address the significant industry-wide waste brine and salt
related challenges. Subject to successful commercial-scale project execution, Parkway’s proprietary
process technology package has the potential to be classified the best available technology (BAT) and
potentially provide a complete industry-wide solution. Parkway’s technology package has been
demonstrated to eliminate waste in line with circular economy principles, and is expected to achieve
significantly improved project economics, compared to the industry’s proposed salt encapsulation
approach.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
3
Master Plan Opportunity
In order to address the significant CSG derived waste brine and salt challenges in Queensland, Parkway
has recently developed Master Plan, an innovative, sustainability driven concept based on providing an
industry-wide solution, as outlined in a comprehensive presentation released on 22 June 2023.
The primary objective of Master Plan is to utilise the proprietary process technology packages
developed by Parkway, to convert all the CSG derived waste brine and salts produced in Queensland,
into saleable industrial products. This approach will put the CSG industry on a more sustainable footing,
by addressing community concerns, by providing a sustainable waste “disposal” (convert waste-toproducts) option, as well as generating substantial revenues from the sale of industrial chemical
products.
As part of Master Plan, in collaboration with a range of strategic partners, Parkway is pursuing a range
of significant opportunities to provide high-value solutions for the CSG industry in Queensland.
Master Plan Related Strategic Opportunities
§
Advanced Large-Scale Opportunity
o
§
Near-Term Upstream Opportunities
o
§
As outlined below, the upstream concentration and beneficiation of waste brine is a
potentially significant near-term opportunity, for providing the first stage of a larger
longer-term solution.
Integrated Waste Brine Processing Hubs
o
§
This option has recently been evaluated as part of a detailed feasibility study with a
major CSG company, with ongoing progress, as outlined above.
An opportunity to establish a series of integrated waste brine processing hubs, to
provide an industry-wide solution to addressing the waste brine and salt challenges
facing the Queensland CSG industry, based on BAT.
Other Opportunities
o
Whilst Parkway has outlined indicative pathways to commercialise its technologies as
part of Master Plan, the Company remains both collaborative and pragmatic in ensuring
optimal outcomes for all stakeholders.
o
As a result, various hybrid opportunities are emerging where the advanced opportunity
outlined above, could potentially evolve into a processing hub, or various other
combinations, on the basis that these pathways are expected to maximise value.
Given the scale of various Master Plan related strategic opportunities, Parkway has recently
incorporated Queensland Brine Solutions Pty Ltd, as a dedicated commercialisation entity, to advance
the objectives of Master Plan.
Go-To-Market Strategy – Near Term Upstream Opportunities
The advanced large-scale opportunity referred to above, provides a potential pathway to deliver a
complete brine treatment solution for one of the largest and most advanced CSG projects in
Queensland. During the last decade, this advanced project has made substantial investments in brine
concentration, however, the remaining 3 major Queensland CSG projects, continue to face a range of
upstream brine concentration challenges.
As a result, Parkway is advancing the potential adoption of an upstream brine concentration and
beneficiation process, that would provide the remaining three projects with significant near-term benefits
– including a smaller and more cost-effective brine storage options. The upstream concentration and
beneficiation of the waste brine would also enable further processing of the brine, with PPT’s
downstream process technologies, at a later stage, based on project specific requirements.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
4
In order to provide a viable near-term solution for the CSG industry in Queensland, Parkway is
developing standard designs incorporating modular equipment (Figure 1), based on Parkway’s
proprietary upstream brine concentration and beneficiation process. Preliminary internal evaluations
suggest QBS is likely to be able to provide a highly attractive brine concentration service (lower cost,
better outcome) to CSG companies on a toll-treatment basis. Given the calibre of potential
counterparties, the anticipated high rates of return, and the scale of the upstream plants, Parkway
expects to be able to build, own and operate (BOO) these projects, potentially with partner/s, depending
on project specific parameters.
The development of the standard designs and modular equipment referenced above, will also provide
Parkway with opportunities to deliver the PPT technologies, in applications beyond the Queensland
CSG industry.
Further details about the near-term upstream opportunities, was outlined by the Company in an updated
investor presentation on 3 August 2023, outlining near-term priorities. Additional details about the
presentation are outlined in the Activities Subsequent to Reporting Period, section of this report.
Figure 1: Schematic of QBS Upstream Brine Concentration Plant
Stakeholder Engagement
Following various announcements by Parkway, including the release of Master Plan, Parkway
continues to be approached by a range of stakeholders to explore various collaborative opportunities.
These interactions include discussions with potential partners, strategic investors, potential product
offtakers, as well as several government bodies, interested in ensuring any long-term solution to treating
CSG derived brines in Queensland is sustainable and consistent with the waste prioritisation hierarchy
for managing saline wastes.
During the quarter, Parkway presented to a panel of senior Queensland Government officials including
the respective director general, of several government departments responsible for regulating CSG
operations in Queensland. These highly encouraging meetings confirmed Parkway’s assessment of not
only the regulatory environment, but also the commitment of the Queensland Government to a range
of policies, that promote the development of sustainable industries, which are key priorities for the
Master Plan presented by Parkway.
Parkway has also been engaged in constructive discussions with both the Australian Energy Producers
association (formerly APPEA) and the University of Queensland regarding several opportunities
presented by Master Plan.
In addition, Parkway is in discussions with various commercial interests, including potential partners,
strategic investors, potential product offtakers and other industry players. Discussions with one of these
parties, a leading developer of renewable energy projects in Central Queensland (with a strategic
interest in the development of green chemicals related supply chains), is likely to result in a
memorandum of understanding (MOU), in the near term.
The swiftness with which Parkway has been able to engage and align interests with various
stakeholders, highlights the intrinsically attractive nature of the Master Plan, and provides confidence
that support for the plan will continue to grow as industry engagement continues to advance.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
5
PARKWAY PROCESS SOLUTIONS
Parkway Process Solutions (PPS) is the primary operating division and a wholly owned subsidiary of
the Company.
Business & Corporate Development
Parkway continues to strategically expand the operations of PPS, by pursuing a range of commercial
opportunities relating to industrial water and wastewater treatment, predominantly in Australia. In
addition to generating sales through the provision of conventional water and wastewater treatment
solutions, PPS is also supporting the commercialisation of Parkway’s next-generation technology
portfolio, including the development of highly differentiated integrated water treatment and industrial
process solutions.
Business Development
During the reporting period, PPS continued to improve its market penetration by securing new business
from a diverse range of clients, for the provision of industrial water treatment related products, services,
and solutions. PPS continues to grow its client base, which includes large mining and energy
companies, a diverse range of industrial companies, as well as engineering services, government, and
municipal clients, amongst others. The growing client base is anticipated to provide a strong foundation
and support future sales growth as these commercial relationships mature.
The industrial capabilities within PPS, are highlighted by the successful finalisation of a large-scale
water infrastructure project for a major mining company (Figure 2), during quarter.
Figure 2: Industrial Diesel Pump Sets Supplied by PPS Undergoing Upgrades & Testing at PPS-Darwin
PPS is also currently working with several other industrial companies for the provision of a range of
industrial water treatment related engineered solutions.
Strategic Positioning
Notwithstanding the encouraging operating performance of PPS, during the reporting period, Parkway
continues to focus on strategically important, particularly technology focused projects, with less focus
on non-strategic short-term revenue generation.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
6
Parkway remains focused on the development of more innovative industrial water treatment solutions,
based on the proprietary process technologies being commercialised by Parkway Process
Technologies (PPT). These efforts involve the design of modular water treatment (and related process)
systems, incorporating PPT technologies, with near-term applications, including as part of the upstream
sector outlined in the recently released Master Plan.
On this basis, during the current (December 2023) quarter, PPS is making strategic investments in
plant, equipment and inventory, with an emphasis on capability development, over short-term revenue
generation. These strategic investments are critical in ensuring Parkway has the capabilities required
to deliver larger scale, technology based engineered solutions, as the PPT portfolio approaches key
commercialisation milestones.
PARKWAY VENTURES
Parkway Ventures (PV) holds resource project and royalty related interests owned by Parkway.
Karinga Lakes Potash Project (KLPP, 40% working interest)
Parkway currently holds an equity interest in the Karinga Lakes Potash Project (KLPP), through
Parkway Ventures. The KLPP is a joint venture between Verdant Minerals Pty Ltd and Consolidated
Potash Corporation Pty Ltd (a wholly owned subsidiary of Parkway), which is administered through
Territory Potash Pty Ltd (JV Operator).
By way of background, on 05 November 2020, Parkway announced completion of the KLPP-PFS, a
pre-feasibility study based on the strategic application of the aMES® technology. As of 30 September
2023, exploration tenure for the KLPP project area was held in three granted exploration licences,
details of which are outlined in the Tenement Interests section of this report, outlined below.
During the quarter, no substantive mining exploration activities occurred in relation to the KLPP, due to
a range of challenges. As outlined in the Activities Subsequent to Reporting Period, section of this
report, the KLPP JV Operator has recently advised the Company that due to a range of factors, including
challenging market conditions for sulphate of potash (SOP) projects in Australia, Verdant Minerals Pty
Ltd intends to surrender the KLPP Tenement Interests.
CORPORATE
Quarterly Sales
During the reporting period, Parkway generated group revenues of approximately $1.29 million, and
achieved strong cash conversion, with record quarterly cash receipts of $1.56 million.
Funding
Capital Raising
On 23 August 2023, Parkway announced the Company had raised $4 million (before costs) via a
placement of 285,714,286 shares at $0.014, to local and overseas institutions, professional and
sophisticated investors. Evolution Capital acted as the Lead Manager for the placement.
The placement was strongly supported by existing major shareholders, resulting in a further
consolidation in the ownership of the Company, with ownership of the top 20 shareholders increasing
to approximately 50% of shares on issue as of the date of this report.
R&D Rebate
As a technology focused company, Parkway continues to invest in a range of commercially oriented,
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
7
industrial research and development related initiatives. As a result of these ongoing activities, Parkway
is eligible for certain, Australian Government research and development tax incentive (R&DTI) related
reimbursements.
Due to ongoing improvements in internal finance related processes, moving forward, Parkway expects
to finalise its R&DTI related submissions much closer to the end of the corresponding financial year,
leading to enhanced working capital efficiency.
Cash on Hand
As of 30 September 2023, the company held $4.91 million in cash reserves. As outlined above, it should
be noted that the reported cash balance excludes, i) undrawn grant funds, ii) the anticipated R&D rebate
for FY23, and iii) other receivables.
Before accounting for the recent capital raising, Parkway experienced net cash outflows during the
quarter, as a result of ongoing investment in the technology portfolio, expansion of Parkway Process
Solutions operations, including funding of work in progress, and general corporate costs.
The ongoing operations of Parkway are also supported by diverse product inventory (stock on hand)
across the PPS operations, with the carrying value of inventory at end of the period of approximately
$1.78 million.
Investor Relations
Investor Presentations
Following the recent release of Master Plan by Parkway, on 3 August 2023, the Company released an
updated investor presentation outlining near-term priorities for Parkway.
As part of the upcoming 2023 Parkway Corporate Annual General Meeting (AGM), Parkway Group
Managing Director & CEO, Bahay Ozcakmak, will deliver a presentation to shareholders outlining key
achievements and upcoming milestones.
Other Items
During the quarter, no substantive mining exploration related activities occurred in relation to the KLPP,
due to a range of challenges.
During the same period, $0.52 million was incurred in relation to staff costs, $0.56 million in
administration and corporate costs, and $1.16 million for cost of goods sold and accumulated inventory.
Additional details are provided in the attached Appendix 5B.
Payments to Related Parties
As outlined in the attached Appendix 5B (section 6.1), during the quarter approximately $0.22 million in
payments were made to related parties and their associates for director and key management
personnel salaries, consultancy fees, superannuation, and other related costs.
2023 Annual General Meeting
The Company recently advised that the Parkway Corporate Limited 2023 Annual General Meeting
(AGM) will be held at 12:00pm on Thursday 30 November 2023. Further details regarding the AGM will
be released to the ASX and provided to shareholders shortly.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
8
Tenement Interests
As of 30 September 2023, Parkway held an interest in the following Mineral Exploration Licences (ELs)
held through the KLPP-JV:
Australian Projects – Karinga Lakes Potash Project
Tenement ID
EL32249
EL32250
EL32251
Location
Karinga Lakes
Karinga Lakes
Karinga Lakes
Interest1
40%
40%
40%
State
NT
NT
NT
Activities Subsequent to Reporting Period
Karinga Lakes Potash Project
The Company has recently been advised by the KLPP JV Operator that due to a range of factors,
including challenging market conditions for sulphate of potash (SOP) projects in Australia, Verdant
Minerals Pty Ltd intends to surrender the KLPP Tenement Interests. The KLPP JV Operator intends to
complete the tenement relinquishment process, including minor site rehabilitation related activities, in
coming months. Parkway expects its equity share of rehabilitation related costs to be immaterial, and
ultimately to be offset against environmental bonds provided by the KLPP-JV.
All of Parkway’s equity share of all KLPP-JV related costs, including earn-in, exploration, appraisal and
maintenance related costs have been expensed. On this basis, the pending relinquishment of the KLPP
Tenement Interests, will not have any impact on the balance sheet of the Company, and on completion
will represent a finalisation of the KLPP-JV. The Company does not expect to make further
announcements in relation to the KLPP, unless required by the Listing Rules.
On behalf of Parkway Corporate Limited.
Bahay Ozcakmak
Group Managing Director & CEO
The attached Appendix 5B has been authorised for release by Bahay Ozcakmak (Group MD &
CEO) and Robert Van der Laan (Group CFO).
ADDITIONAL INFORMATION
For further information or investor enquiries, please contact:
Bahay Ozcakmak
General Enquiries
Group Managing Director & CEO
1300 7275929
solutions@pwnps.com
1300 PARKWAY
1 As part of the anticipated KLPP-JV tenure relinquishment process, the Company expects the Tenement Interests to be surrendered during the December 2023 quarter.
www.
pwnps.com
SEPTEMBER 2023
|
QUARTERLY REPORT
|
9
PARKWAY INVESTOR HUB
To stay up to date with the latest news, access additional investor related resources including research reports and
interact with Parkway by posting questions and feedback through a Q&A function, we encourage investors to signup to the Parkway Investor Hub.
How to sign-up to the Parkway Investor Hub
1.
navigate to https://investorhub.pwnps.com/welcome
2.
follow the prompts to sign up for an Investor Hub account.
3.
complete your account profile.
or Scan QR Code to visit the Parkway Investor Hub.
ABOUT PARKWAY CORPORATE LIMITED
Parkway Corporate Limited is an Australian cleantech company focused on developing and implementing,
industrial-scale innovative water treatment solutions. Parkway is listed on the Australian Securities Exchange
(ASX: PWN) and is emerging as an innovative player in water related sustainability solutions. With significant
inhouse technical expertise and established partnerships, Parkway is well-placed to deliver the next generation of
wastewater treatment plants, incorporating the company’s portfolio of world-class technologies.
Parkway operates through four (4) core business units, comprising:
•
Parkway Process Solutions (PPS) – Parkway’s primary operating division and an emerging provider of
industrial water treatment products, services, solutions and associated technology to customers
throughout Australia. PPS has recently established commercial relationships with key water industry
participants, including globally recognised OEMs;
•
Parkway Process Technologies (PPT) – Parkway’s technology development, acquisition, and
commercialisation division. PPT owns a portfolio of industrial wastewater treatment technologies,
including the patented aMES® and iBC® process technologies. PPT has global aspirations and is
supported by a network of strategic partners, including global engineering company Worley;
•
Queensland Brine Solutions (QBS) – is a recently established commercialisation entity, focused on
advancing the objectives of Master Plan, a plan developed by Parkway to address the significant coal
seam gas derived waste brine and salt challenges in Queensland, through the adoption of proprietary
process technologies, developed by Parkway; and
•
Parkway Ventures (PV) – holds a portfolio of project equity interests, including interests relating to
Parkway’s Karinga Lakes Potash Project in the Northern Territory of Australia.
Additional information regarding Parkway, including an overview of the corporate structure of Parkway and the
companies in its corporate group, can be found at: www.pwnps.com
FORWARD-LOOKING STATEMENTS
This