Quarterly Activities/Appendix 4C Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
27 APRIL 2022
MARCH 2022 – QUARTERLY REPORT
Highlights
PARKWAY PROCESS SOLUTIONS (PPS)
§
§
Business Development
§
Continued success in securing new business from a diverse range of companies, for
the provision of industrial water treatment related products, services, and solutions.
§
ISO certification is assisting Parkway achieve approved vendor status with key clients.
Product Development
§
§
Finalised the design and commenced fabrication of a high-performance, integrated
water treatment system based on a rapidly deployable modular design.
Group Sales of approximately $1.1 million, with cash receipts of $1.0 million, underpinned by a
rapidly growing project backlog with high likelihood of revenue conversion in the near term.
PARKWAY PROCESS TECHNOLOGIES (PPT)
§
Continued progress in leveraging proprietary process technology platform to support existing
& emerging business development initiatives. Expanded strategic relationship with Worley.
§
Core Technologies
§
Ongoing technoeconomic evaluations supporting aMES® commercialisation.
§
In April 2022, awarded material contract for feasibility study based on iBC® technology.
§
Construction of new scaled-up iBC® pilot plant on-track for completion in May 2022.
§
Third-Party Technologies: developing piloting capabilities for several innovative technologies.
§
Commercialisation Activities: include ongoing technoeconomic evaluations to demonstrate the
substantial operational, financial and sustainability advantages of the technology portfolio.
PARKWAY VENTURES (PV)
§
The KLPP-Joint Venture ownership advancing towards finalisation of 40% working interest.
CORPORATE
§
Strong balance sheet with $4.5 million in cash reserves as at 31 March 2022.
§
Cash balance excludes grant funds, R&D tax incentive rebate for FY21 and other receivables.
Parkway Corporate Limited (“Parkway” or the “Company”) (ASX: PWN) is pleased to report its activities
for the quarter ending 31 March 2022. This report is presented by operating division (strategic busines
unit), as follows:
§
Parkway Process Solutions (PPS)
§
Parkway Process Technologies (PPT)
§
Parkway Ventures (PV)
§
Corporate (Parkway group)
PARKWAY PROCESS SOLUTIONS (PPS)
Parkway Process Solutions (Parkway Process Solutions Pty Ltd, PPS) is a wholly owned subsidiary
and the main operating division of the Company.
Business & Corporate Development
Growth of PPS
Parkway continues to strategically expand the operations of PPS, by pursuing a range of commercial
opportunities relating to industrial water treatment, predominantly in Australia. In addition to generating
growing revenues through the provision of conventional water treatment solutions, PPS is increasingly
supporting the commercialisation of the Company’s next-generation technology portfolio, including the
delivery of highly differentiated integrated water treatment and industrial process solutions.
Business Development
During the reporting period, PPS continued to successfully secure new business from a range of
companies, for the provision of industrial water treatment related products, services, and solutions. PPS
continued to progress the development of a range of modular water treatment plants (see below), which
are successfully supporting various ongoing business development related efforts. PPS has recently
achieved first orders from a range of new customers, involving the provision of new products and
services, including the sale of several small, pre-packaged water treatment systems, which represent
additional international sales, by PPS.
The early-stage preliminary engineering study for a previously disclosed wastewater treatment plant
was completed during the reporting period, with the client soliciting a further proposal from PPS to
advance the project through the project evaluation process (refer to Activities Subsequent to Reporting
Period).
Additional business development opportunities including collaborations with several previously
foreshadowed companies, continues to progress positively, with several collaborative arrangements
agreed with various parties.
The Parkway Integrated Management System (further details provided in the Corporate – Parkway
Integrated Management System, section of this report) was independently certified during the reporting
period and continues to support the establishment of PPS as a qualified vendor and assist in a range
of business development related initiatives. With growing inhouse engineering and technical services
capabilities, an innovative product and services offering and operations in Perth, Melbourne and
Darwin, PPS is increasingly well placed to secure larger industrial water treatment related opportunities
moving forward.
By way of illustration, PPS was recently approached by a global mining company to provide a proposal
to supply and maintain water related process equipment for a major mine, with an indicative contract
value greater than $5 million over 3 years. PPS is increasingly fielding similarly large and complex
enquiries, which highlight the growing recognition of the capabilities of PPS, despite very limited
marketing efforts to date. Subsequent to the reporting period (refer to Activities Subsequent to
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
2
Reporting Period), another global mining company awarded PPS a contract to design, build and supply
a water treatment plant to treat mine pit water for a significant operating mine. Despite a range of welldocumented supply chain and Covid-19 related impacts, PPS expects to complete this project during
the current quarter, highlighting the operational capabilities rapidly being developed by the Company.
Based on the effective and successful engagement with the client, the Company expects there is a high
likelihood, that a subsequent water treatment plant project, will also be awarded by the same client to
PPS, later in the year.
PPS continues to field additional unsolicited enquiries from a range of prospective clients requiring
sophisticated industrial process expertise, particularly in the field of processing hypersaline brines. For
instance, during the quarter, PPS was engaged by a sulphate of potash (SOP) project developer,
seeking process expertise in developing and evaluating more efficient SOP processing routes.
Product Development
Parkway previously advised that it had identified significant opportunities for relatively small, rapidly
deployable, integrated water treatment plants based on a modular and reconfigurable design platform.
Parkway continues to progress the design of a range of these modular water treatment systems, and
has taken delivery of most components, including long-lead items, which will also become stocked items
for PPS. Parkway continues to receive very favourable feedback regarding the advantages of the
modular systems, including the pre-sale PPS design capabilities, and the post-sale support (service
and consumables), which is becoming increasingly important, given the significant supply chain
challenges being experienced, globally.
Importantly, the growing inhouse product development capabilities, is also assisting PPS in designing,
and eventually building and delivering modular water treatment (and related process) plants,
incorporating technologies being commercialised by Parkway Process Technologies.
Based on the encouraging market feedback, including in relation to several projects that have advanced
during and subsequent to the reporting period, Parkway has recently developed a strategy to further
expand its capacity to design and build a range of modular integrated water treatment systems.
Corporate Development
PPS continues to successfully secure access, including distributorships to high-value and specialty
industrial water treatment related products, from a range of leading global OEMs with additional
negotiations ongoing. Whilst these products represent attractive business opportunities (for either
resale or as part of a value-added conventional water treatment solution), in many instances, these
products also support the development and provision of more innovative solutions incorporating PPT
technologies.
Quarterly Sales
As a result of ordinary operations, PPS generated group sales of approximately $1.1 million, with cash
receipts of $1.0 million, underpinned by a rapidly growing project backlog with high likelihood of revenue
conversion in the near term.
Given the increasing levels of business development activities described above, the ramp-up period
associated with onboarding new projects and typical procurement cycles, there is a timing impact on
working capital, where cash receipts generally lag the corresponding sales and project activities during
the relevant period. Given the significant progress and corresponding investments in PPS to date,
including the growing project backlog, the Company remains optimistic about building a sustainable
and rapidly growing revenue base moving forward.
PARKWAY PROCESS TECHNOLOGIES (PPT)
Parkway Process Technologies (Parkway Process Technologies Pty Ltd, PPT) continued to make
progress in leveraging its proprietary (core) process technology platform to support existing and
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
3
emerging business development initiatives. PPT also continues to make progress with a range of thirdparty process technologies, that enable Parkway to provide a broader range of synergistic industrial
process technologies.
Many of the developments outlined in the Parkway Process Solutions (PPS) – Business Development
and Corporate Development sections, are being pursued, as they also support the ongoing
commercialisation of the PPT technology portfolio.
Expansion of Global Strategic Cooperation Agreement with Worley
On 10 February 2022, the Company advised that it had entered into an amendment agreement with
Worley to extend the term of the existing cooperation agreement from three years to five years. In
addition, the scope of the original Global Strategic Cooperation Agreement was expanded to
incorporate the iBC® technology, to further assist with the commercialisation of this promising
technology.
Core Technologies – iBC®
The iBC® technology involves the pre-treatment of complex brines, particularly from the energy, mining
and other industrial sectors, to enable further downstream processing, to reduce wastewater volumes
and potentially recover a range of valuable chemical products.
The Company is exploring large-scale and high-value potential applications of the iBC® technology with
a range of industrial companies.
Ongoing testwork continues to provide encouragement that in addition to achieving significant
wastewater volume reductions, the application of the iBC® technology is likely to be able to achieve a
highly desirable zero-liquid discharge (ZLD) solution for certain applications. In addition to the
advantages of a ZLD approach, recent testwork continues to support the business case that an iBC®
based processing route, also has the potential to create a valuable revenue stream, through the sale of
industrial chemicals.
New iBC® Pilot Plant
Given the highly encouraging results from testwork performed to date, as well as positive industry
feedback, the Company recently finalised the design for a scaled-up iBC® pilot plant and has recently
commenced construction of a New iBC® Pilot Plant, which is scheduled for mechanical completion in
May 2022. The New iBC® Pilot Plant will assist the Company perform larger scale testwork and produce
product samples, for industry evaluation. The New iBC® Pilot Plant will also support a range of ongoing
commercial discussions with a range of key stakeholders, including prospective clients and partners.
Subsequent to the reporting period (refer to Activities Subsequent to Reporting Period), the Company
was awarded a feasibility study contract by QGC (a Shell Group company), which will incorporate
process piloting, including with the New iBC® Pilot.
Core Technologies – aMES®
The aMES® technology enables the processing of concentrated industrial process and wastewater
streams including brine solutions, to recover a range of valuable compounds, reagents, and fresh water.
In late 2020, the Company finalised the Karinga Lakes Potash Project – Pre-feasibility Study (KLPPPFS), which assisted the Company to demonstrate the significant advantages of the aMES® technology
in a sulphate of potash (SOP) related application. In conjunction with the PFS, a new state-of-the-art
aMES® pilot plant was commissioned, providing the Company with an important process demonstration,
optimisation and validation capability, an essential requirement for successful commercialisation of the
aMES® technology.
The performance data generated by the aMES® pilot plant, is providing important information that will
impact the engineering design of a commercial-scale modularised aMES® plant. During the reporting
period, the Company continued to perform a range of technoeconomic evaluations as well as engage
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
4
in discussions with several parties, to further advance a range of prospective commercial arrangements.
Core Technologies – Other
By leveraging the process engineering capabilities of the Company, PPT has been able to develop
innovative applications for a range of water treatment processes, to achieve improvements in the
processing and treatment of challenging industrial wastewater streams. In addition, the Company
continues to develop new technologies as well as identify additional applications for its portfolio of
proprietary process technologies, to solve high-value problems facing industry.
Third-Party Technologies – Various
As part of efforts to further expand the coverage of Parkway’s cutting-edge technology portfolio, the
Company is continually evaluating a range of prospective technology platforms. The most attractive
technology platforms are those that not only provide substantial efficiency, financial and sustainability
related advantages over conventional processes, but are also highly complementary with Parkway’s
existing technologies.
The Company recently disclosed that it had entered into a strategic partnership agreement with a
leading European membrane technology company. The innovative membrane-based technology
provides Parkway with a highly effective and selective pre-concentration technology, which enables
more dilute feedstocks including brine and/or wastewater to be concentrated, before treatment with
Parkway’s aMES® process technology platform. Parkway has recently developed a small scale inhouse
testing capability, to enable bench scale testing, including with a compact pilot plant incorporating the
innovative membrane-based technology.
The Company has also recently developed capabilities in relation to an advanced oxidation technology,
which is expected to provide a more efficient, cost-effective and sustainable (chemical free) wastewater
treatment process, to deal with a range of problematic, particularly biological parameters. During the
reporting period, the Company procured a range of process equipment, to support the development of
an inhouse pilot plant, expected to be operational in the current quarter. The Company has already
received interest from several existing and prospective customers to evaluate the effectiveness of the
advanced oxidation technology in a number of applications. Encouragingly, the Company continues to
make strong progress in building a portfolio of technologies, capable of providing a highly integrated
process solution, for a range of wastewater and process streams traditionally considered difficult to
treat.
As part of PPS’s growing modular product development capabilities, the Company continues to invest
in developing capabilities to build modular systems based on commercial scale equipment, including
incorporation of a range of technologies, such as the innovative membrane-based technology as well
as the advanced oxidation technology.
Commercialisation Activities
Parkway continues to perform a range of evaluations to demonstrate the substantial operational,
financial and sustainability advantages of the technology portfolio, incorporating both the core and thirdparty technologies.
PARKWAY VENTURES (PV)
Parkway Ventures (Parkway Ventures Pty Ltd, PV) holds all resource project and royalty related
interests owned by the Company.
Karinga Lakes Potash Project (KLPP, 15% interest, earning 40%)
Parkway currently holds an equity interest in the Karinga Lakes Potash Project (KLPP), through
Parkway Ventures. As a result of a recently finalised tenement rationalisation process, during the
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
5
quarter, no substantive mining exploration activities occurred in relation to this project.
The KLPP is a joint venture between Verdant Minerals Pty Ltd and Consolidated Potash Corporation
Pty Ltd (a wholly owned subsidiary of the Company), which is administered through Territory Potash
Pty Ltd (JV Operator).
On 05 Nov 2020, the Company announced completion of the KLPP-PFS, a pre-feasibility study based
on the strategic application of the aMES® technology. The Company notes the recent strength in
commodity markets, is supporting elevated fertiliser prices, with the primary target product from the
KLPP, sulphate of potash (SOP), trading significantly higher than the prices assumed by the Company
in the KLPP-PFS.
Following finalisation of joint venture accounting processes that are nearing completion, the Company
anticipates satisfying the earn-in requirements to have acquired a 40% working interest in the project.
As at 31 March 2022, exploration tenure for the KLPP project area was held in the three newly granted
exploration licences, details of which are outlined in the Tenement Interests section of this Quarterly
Report, outlined below.
Mineral Resources
The Mineral Resource Estimate underpinning the KLPP-PFS is summarised below.
Lake
Mineralisation
Contained in Drainable
Porosity
Indicated Mineral
Resource contained in
Total Porosity that meets
reasonable prospects of
economic extraction
Potassium Tonnage
Potassium Tonnage
Potassium Tonnage
(kt)
(kt)
(kT)
580
430
Production
Lakes included in the mine plan (x8)
Sub Total
300
Remaining Lakes (x16)
Sub total
220
430
Totals
520
1000
430
The Mineral Resource estimate underpinning the production targets in this announcement were
prepared by a competent person in accordance with the requirements of the JORC Code 2012.
COMPETENT PERSONS STATEMENT
Parkway reported the Mineral Resource estimate for the Karinga Lakes Potash Project in accordance
with Listing Rule 5.8 in its ASX announcement dated 5 November 2020. Parkway confirms that it is not
aware of any new information or data that materially affects the information included in the
announcement of 5 November 2020 and that all material assumptions and technical parameters
underpinning the estimates in the announcement of 5 November 2020 continue to apply and have not
materially changed.
Other Resource Projects
During the quarter, the Company continued to consider potential involvement in a number of additional
resource projects, whereby the Company may contribute its proprietary process technologies, in
exchange for the Company receiving agreed equity interests and/or royalties in the respective project/s.
In the event the Company is successful in adopting this strategy, the Company intends to leverage its
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
6
technology portfolio to gain economic exposure to additional resources project/s (including, amongst
others, lithium brine projects), without necessarily incurring material balance sheet exposure. For the
avoidance of doubt, this technology commercialisation strategy is similar and consistent with the
previously disclosed innovative business model, being pursued by the Company.
CORPORATE
Parkway Integrated Management System (PIMS)
The Company is committed to achieving high quality environmental, social & governance (ESG)
outcomes, including achieving and maintaining high levels of compliance. As part of the Company’s
commitment to industry best practices and continuous improvement, the Company has recently
developed an Integrated Management System, to facilitate the certification and ongoing compliance in
relation to:
§
ISO9001:2015, Quality Management System;
§
ISO14001:2015, Environmental Management System; and
§
ISO 45001:2018, Occupational Health & Safety Management System.
Based on an independent audit and site evaluation performed in January 2022, on 04 February 2022,
the Company announced that it had achieved certifications for all the relevant standards.
Funding
During the quarter, the Company experienced moderate cash outflows ($0.4 million), largely as a result
of ongoing investment in the technology portfolio, expanding the operations of Parkway Process
Solutions, as well as funding work in progress, including the associated build-up of significant inventory.
Notwithstanding the ongoing investment in a range of strategic initiatives including the expansion of
operations, as at 31 March 2022, the Company held cash reserves of $4.5 million, excluding i) grant
funds, ii) R&D rebate, and iii) other receivables. The strong cash position means the Company is well
funded to execute the CY2022 business plan, including the continued roll-out of PPS, to the point where
it is anticipated to make an increasingly significant revenue contribution to the group.
Grant Funds
The Company has a strong track-record in securing a range of grants, including from the Australian
Research Council (ARC), to support innovative research and development (R&D) and associated
commercialisation related activities. The Company has recently been invited to participate in several
research grant schemes designed to fund innovative research, which the Company intends to pursue,
where research interests align, and commercial arrangements are consistent with the Company’s
requirements. During the reporting period, the Company was offered, and agreed in-principle, to
participate in an ARC supported research hub focused on the circular economy. The project budget for
activities to be directed by the Company, is in the order of $0.6 million (excluding in-kind contributions)
to be invested into various research activities over a period of 4 years, where the Company will make
an annual contribution in the order of $60,000 for the duration of the project. The balance of project
funding will be provided by the ARC and Victoria University, leveraging Parkway’s contribution to
provide a larger project budget.
A proportion of the R&D activities performed at Victoria University in collaboration with the Company,
including the construction, testing and operation of state-of-the-art aMES® and iBC® pilot plants, is
funded by previously awarded grant funding. The Company is also in the process of establishing a small
inhouse piloting capability which will provide further operational advantages.
The Company acknowledges the financial support of the Australian Government.
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
7
R&D Rebate
As a result of research and development activities performed and/or funded by the Company during
FY21, the Company anticipates receiving an Australian Government research and development tax
incentive (R&DTI) payment in the order of $0.25 million for eligible activities, in May 2022. The Company
continued to fund eligible activities during the reporting period, and expects to receive an additional
R&DTI payment for these activities, as part of an application covering FY22, at a later date.
Other Receivables
The Company has a growing receivables profile made up predominantly of trade receivables generated
through ordinary operations, where the commercial terms result in a delay in receiving certain payments
for works already performed and/or in progress. In addition, as a result of certain post-acquisition related
accounting adjustments, the Company also expects to receive a credit adjustment from a vendor. As a
result, the Company has accumulated net receivables in the order of $0.5 million, which it expects to
be able to realise in the near term.
Cash on Hand
As at 31 March 2022, the company held $4.5 million in cash reserves. As outlined above, it should be
noted that the reported cash balance excludes, i) undrawn grant funds, ii) the anticipated R&D rebate,
and iii) other receivables.
COVID-19 Impacts
The Company continued to experience a range of disruptions during the quarter, including significant
delays in the transportation of products and restrictions impacting the movement of staff to support
various project and business development related activities. The delay in the transportation of key
products and parts, is an industry wide phenomenon, and has significantly delayed the completion of
several awarded works, and the corresponding recognition of revenues during the period.
Investor Relations
The Parkway group managing director & CEO, Bahay Ozcakmak, is scheduled to provide a number of
interviews, to provide an operational update as well as provide an outlook on near-term activities.
Other Items
During the quarter, no exploration and evaluation related expenditures were incurred in relation to the
Karinga Lakes Potash Project (following the recent resolution of the Native Title Objection), pending
finalisation of joint venture accounts, which the Company anticipates will satisfy the earn-in
requirements to have acquired a 40% working interest in the project.
During the same period, $0.55 million was incurred in relation to staff costs, $0.33 million in
administration and corporate costs, and $0.50 million for cost of goods sold and additional inventory.
As the Company entered into additional commercial arrangements, the net inventory available for sale
during the quarter increased further to approximately $1.70 million.
Additional details are provided in the attached Appendix 5B.
Payments to Related Parties
As outlined in the attached Appendix 5B (section 6.1), during the quarter approximately $0.15 million in
payments were made to related parties and their associates for director salaries, consultancy fees,
superannuation, and other related costs.
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
8
Tenement Interests
As at 31 March 2022 the Company held an interest in the following Mineral Exploration Licences
(ELs) held through the KLPP-JV:
Australian Projects – Karinga Lakes Potash Project
Tenement ID
EL32249
EL32250
EL32251
Location
Karinga Lakes
Karinga Lakes
Karinga Lakes
State
NT
NT
NT
Interest
15%
15%
15%
Activities Subsequent to Reporting Period
Water Treatment Plant Contract
The Company has recently been awarded a project to design, build and supply an integrated water
treatment plant and related infrastructure for a major global mining company. The water treatment plant
will use mine pit water as the feedwater. The design of the water treatment plant is approaching
completion with procurement well underway. The primary scope to be delivered by the Company,
including the supply of the integrated water treatment plant, is anticipated to be finalised in the current
quarter. The parties have also been exploring the scope for a second containerised water treatment
plant, which the Company expects to be awarded, later this year.
Wastewater Treatment Plant Contract
In January 2022, the Company was awarded a contract to perform an early-stage preliminary
engineering study to assist a government entity assess options for treating a problematic wastewater
source through potential onsite treatment. Following successful completion of the project scope during
the quarter, the Company has been awarded a contract to perform a process piloting program, as well
as engage with the EPA, in relation to the potential for an on-site demonstration, which may lead to a
commercial deployment.
Feasibility Study Contract Awarded by QGC
On 7 April 2022, the Company announced it had been awarded a material contract, a feasibility study,
by QGC Pty Limited, a Shell Group company. The material contract is based on Parkway performing a
range of evaluations and assessing the feasibility of treating waste brine derived from QGC’s coal seam
gas water treatment plants, using Parkway’s iBC® technology.
Subsequent to the contract award, the Company has recently received a purchase order from QGC for
the contracted amount of approximately $0.56 million (exclusive of GST).
The Company has commenced a range of activities in relation to the feasibility study related work
program, and has additionally identified a potential offtake party that could conceivably procure the
entire forecast production of the primary product (sodium hydroxide) from a potential wastewater
treatment plant incorporating the iBC® technology. Whilst initial discussions are highly encouraging as
they potentially provide a practical path-to-market for the primary recovered product, as discussions are
preliminary in nature, these will be explored further during the feasibility study process, during the
course of the year.
Immediately prior to announcing the feasibility study award, the Company provided an updated market
assessment, indicating that the potential market opportunity for the iBC® technology was in the order of
www.parkway-corp.com
MARCH 2022
|
QUARTERLY REPORT
|
9
$307 million/yr, or up to $9.2 billion1 over the life of existing CSG projects operating in Queensland,
Australia. Further details regarding the potential market opportunity for the iBC® technology are outlined
in the 07 April 2022 announcement.
Major Chemical Complex Feasibility Study
The Company has been collaborating with an EPC company that has been in discussions with a
national govern