COMPLETION OF KARINGA LAKES POTASH PROJECT
PRE-FEASIBILITY STUDY (KLPP-PFS)
Highlights
PRE-FEASIBILITY STUDY
•
The KLPP-PFS confirms the KLPP as a potentially attractive producer of high-quality,
soluble grade, sulphate of potash (SOP) targeting key horticulture markets.
•
Innovative aMES™ based flow sheet demonstrates potential (major improvement
over scoping study), even for a relatively small-scale operation targeting annual SOP
production of 40,000 tonnes, over an initial mine life of 20 years.
•
aMES™ based development concept demonstrates highly efficient use of water.
•
KEY FINANCIAL METRICS
o
Initial capital cost (CAPEX) of $80.0 million, inclusive of all non-process
infrastructure and indirect costs (which includes a contingency of $6.7 million).
o
Production cost (OPEX) of $293/tonne of SOP, ex-mine gate.
o
Strong cash generation potential, with estimated EBITDA margin of 54.4%,
resulting in annual EBITDA of $18.6 million.
o
Ungeared development of the KLPP would result in:
Project payback in approximately 5.5 years from first SOP production.
Post-Tax NPV8% of $80.15 million with an IRR of 20.4%.
•
Significant additional opportunities to improve the financial performance of the project
were identified, particularly in relation to non-process infrastructure.
•
KLPP-PFS prepared by owners’ team, supported by leading industry consultants, with
Worley as study manager, through existing Global Strategic Cooperation Agreement.
MINERAL RESOURCE ESTIMATE
•
Reporting Indicated Mineral Resource of 1,000,000 tonnes of potassium, with 580,000
tonnes of potassium hosted within eight lakes that are incorporated into the mine plan.
•
The mine plan includes production of 430,000 tonnes of potassium, which is sufficient
to underpin an initial mine life of 20 years, based on a scheduled production rate of
40,000 tonnes per annum of SOP.
Parkway Minerals NL (ASX: PWN) (“Parkway Minerals” or the “Company”) is pleased to
provide the following update, incorporating the release of two major reports:
1. The Karinga Lakes Potash Project – Pre-Feasibility Study (KLPP-PFS), Summary
Report, which incorporates the below report, as Appendix A;
2. The Karinga Lakes Potash Project – Sulphate of Potash Resource and Production
Plan (KLPP-SOPRPP).
1.
Karinga Lakes Potash Project – Pre-Feasibility Study (KLPP-PFS)
Summary Report
The generalised development concept for the KLPP is outlined in Figure 1.
Figure 1:
Generalised Development Concept Outlined in the KLPP-PFS
UPSTREAM
OPERATIONS
DOWNSTREAM
OPERATIONS
The attached KLPP-PFS Summary Report should be read in conjunction with the rest of this
announcement, with particular attention given to the Important Information.
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 2
Karinga Lakes Potash Project – Sulphate of Potash Resource and
Production Plan (KLPP-SOPRPP)
2.
The resource utilisation plan for the KLPP underpinning the KLPP-PFS is outlined in Figure 2.
Figure 2:
KLPP Mineral Resource Estimate - Resource Utilisation in Mine Plan
Mineralisation Contained
in Drainable Porosity
Indicated Mineral Resource
contained in Total Porosity
that meets reasonable
prospects of economic
extraction
Production
Potassium Tonnage
Potassium Tonnage
Potassium Tonnage
(kt)
(kt)
(kT)
300
580
430
Sub total
220
430
Totals
520
1000
Lake
Lakes included in the mine plan (x8)
Sub Total
Remaining Lakes (x16)
430
The attached KLPP - Sulphate of Potash Resource and Production Plan should be read in
conjunction with the rest of this announcement, with particular attention given to the Important
Information.
The Mineral Resource estimate underpinning the production targets in this announcement
were prepared by a competent person in accordance with the requirements of the JORC Code
2012.
Important Information
This announcement, including the, (1) KLPP-PFS Summary Report and the, (2) KLPPSOPRPP, should be read in its entirety, with particularly consideration given to each of
the following sections:
•
Important Note
•
Cautionary Statements, Risk Factors and Disclaimer
•
Competent Persons Statement
•
Forward Looking Statements
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 3
Commentary
Parkway Minerals – Managing Director, Bahay Ozcakmak commented:
“Completion of the KLPP-PFS represents a significant milestone for Parkway Minerals, as this
study confirms our long-held belief, that our aMES™ technology, has the potential to transform
the high-grade, but relatively small-scale potash resource at the KLPP, into a viable project.
Notwithstanding the inherent challenges of developing a small-scale greenfield project in
Central Australia, including the development of necessary non-process infrastructure (NPI)
such as an access road and power station, the KLPP-PFS also highlights the many
advantages of the aMES™ technology. The ability of the aMES™ based flow sheet to produce
the intermediate product sylvite (MOP), in order to synthesise SOP, is an inherent advantage
over SOP projects that need (or plan) to, purchase MOP as a process input. The KLPP-PFS
also highlights the merits of our highly water efficient development concept, as a result of the
aMES™ based process plant. Additionally, it also achieves very high potassium recoveries,
representing a significant improvement over conventional technologies.”
“With these outstanding PFS results in hand, we will continue to engage with our JV partner,
to determine the appropriate next steps for the KLPP. In addition to the KLPP, the KLPP-PFS
provides Parkway Minerals with a strong foundation from which to progress commercial
opportunities with other project developers/operators. In particular, those with existing
operations which would benefit from the strategic application of the aMES™ technology. We
have previously investigated the potential application of aMES™ technology for a range of
projects, predominantly, in the energy and mining sectors. With the completion of the KLPPPFS, we look forward to providing further details, as evaluations of these projects progress.
On behalf of Parkway Minerals, I’d like to take this opportunity to thank the entire project team
for delivering this breakthrough study, particularly our colleagues at Worley, for their continued
support in assisting us unlock significant value from our innovative aMES™ technology.”
On behalf of Parkway Minerals NL.
Bahay Ozcakmak
Managing Director
This announcement and the attached reports have been authorised for release by
Bahay Ozcakmak (MD) on behalf of the Board of Parkway Minerals NL.
Additional Information
For further information contact:
Bahay Ozcakmak
Managing Director
T: +61 414 596 007
E: bahay@parkwayminerals.com.au
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 4
Important Information
This announcement, including the, (1) KLPP-PFS Summary Report and the, (2) KLPPSOPRPP, should be read in its entirety, with particularly consideration given to each of
the following sections:
•
Important Note
•
Cautionary Statements, Risk Factors and Disclaimer
•
Competent Persons Statement
•
Forward Looking Statements
Important Note
Please refer to the assumptions, sensitivities, cautionary statements, risk factors and
disclaimer in this announcement, as well as the relevant details in each of the KLPP-PFS
Summary Report and KLPP-SOPRPP, as these may adversely impact upon the information,
conclusions and forecasts outlined in this announcement.
Cautionary Statements, Risk Factors and Disclaimer
Certain statements in this study include estimates or future events that are forward-looking
statements. They include indications of, and guidance on, future earnings, cash flow, costs
and financial performance. Such forward-looking statements are provided as a general guide
only and should not be relied on as a guarantee of future performance. When used in this
report, words such as, but are not limited to, “could”, “planned”, “estimated”, “expect”, “intend”,
“may”, “potential”, “should”, “projected”, “scheduled”, “anticipates”, “believes”, "predict",
"foresee", "proposed", "aim", "target", "opportunity”, “nominal”, “conceptual” and similar
expressions are forward-looking statements. Although the expectations reflected in these
forward-looking statements are believed to be reasonable, such statements involve risks and
uncertainties, and no assurance can be given that actual results will be consistent with these
forward-looking statements. Forward-looking statements are provided as a general guide only
and should not be relied on as a guarantee of future performance as they may be affected by
a range of variables that could cause actual results to differ from estimated results and may
cause actual performance and financial results in future periods to materially differ from any
projections of future performance or results expressed or implied by such forward-looking
statements. There can be no assurance that actual outcomes will not materially differ from
these forward-looking statements.
The contents of this study are also subject to significant risks and uncertainties that include
but are not limited those inherent in technology commercialisation, mine development and
production, geological, mining, metallurgical and processing technical problems, the inability
to obtain and maintain mine licenses, permits and other regulatory approvals required in
connection with mining and processing operations, competition for among other things,
capital, acquisitions of reserves, undeveloped lands and skilled personnel, incorrect
assessments of the value of projects and acquisitions, changes in commodity prices and
exchange rate, currency and interest rate fluctuations and other adverse economic conditions,
the potential inability to market and sell products, various events which could disrupt
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 5
operations and/or the transportation of mineral products, including labour stoppages and
severe weather conditions, the demand for and availability of transportation services,
environmental, native title, heritage, taxation and other legal problems, the potential inability
to secure adequate financing and management's potential inability to anticipate and manage
the foregoing factors and risks. There can be no assurance that forward-looking statements
will prove to be correct. Where the KLPP-JV partners, directors, officers, employees and/or
consultants express or imply an expectation or belief as to future events or results, such
expectation or belief is expressed in good faith and on a reasonable basis. No representation
or warranty, express or implied, is made that the matters stated in this study will in fact be
achieved or prove to be correct.
Competent Persons Statement
The information in this announcement that relates to Exploration Results and Mineral
Resources for the Karinga Lakes Potash Project is based on, and fairly represents, information
compiled by Mr Ben Jeuken, who is a member of the Australian Institute of Mining and
Metallurgy and a member of the International Association of Hydrogeologists. Mr Jeuken is
employed by Groundwater Science Pty Ltd, an independent consulting company. Mr Jeuken
has sufficient experience, which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity, which they are undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Jeuken consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
Forward Looking Statements
As outlined above in the Cautionary Statements, Risk Factors and Disclaimer section, and on
page 8 of this ASX announcement.
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 6
aMES™ Technology
The activated Mineral Extraction System, or aMES™
is an innovative process technology that enables the
treatment of concentrated brine solutions to recover a
range of valuable compounds, reagents and fresh
water. The technology utilises a proprietary multistaged process incorporating novel membrane
technology and is based on proprietary IP,
incorporating patents, expertise and know-how
acquired over more than a decade of intense process
development.
Advantages of the aMES™ technology include:
•
improvements in mineral recovery and
product quality,
•
opportunity for substantial project capex &
opex savings,
•
efficient use of energy and produces pure
water as a by-product, and
•
improved project footprint and environmental
sustainability.
Ongoing collaboration with a number of brine project
developers and operators has confirmed there are
many applications where the aMES™ technology has
the potential to deliver substantial value by enhancing
existing flowsheets, in order to improve overall project
performance.
aMES™
Brine Processing Technology
Key Industries (Applications)
•
Mining natural brine (salt lakes)
•
Solution mining brine (potash)
•
Refinery & industrial waste brine
•
Wastewater treatment brine
Target Products (Produced)
•
Potash (MOP/SOP/KMS)
•
Lithium and magnesium salts
•
Range of byproducts (B, Br, Ca,
Co, Cu, I, Na, Ni, REE, Si, Sr)
•
Reagents
•
Water
Additional Information
www.parkwayminerals.com.au/ames-technology
iBC™ Technology
The integrated Brine Causticization, or iBC™ is a
patented process technology that simultaneously
removes common impurities from waste brine streams
and converts sodium carbonates and bicarbonates
commonly found in coal seam gas (CSG) brines, into
more soluble sodium hydroxide.
As a result of the causticization step, the iBC™
technology produces a purified brine suitable for
downstream processing, including with the aMES™
technology, for the production of various salt products
and industrial-grade sodium hydroxide.
iBC™
Brine Pre-Treatment Technology
Key Industries (Applications)
•
Oil & gas waste brine (CSG)
•
Wastewater treatment brine
Target Products (Produced)
•
Sodium hydroxide concentrate
Additional Information
•
Sodium chloride
https://www.parkwayminerals.com.au/ibc-technology
•
Byproducts (Ca, Mg, Si)
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 7
About Parkway Minerals
In October 2019, Parkway Minerals (ASX: PWN) completed a transformational transaction by acquiring
an Australian unlisted public company, Consolidated Potash Corporation (CPC). Through CPC,
Parkway Minerals acquired a minority interest in the Karinga Lakes Potash Project (KLPP) in NT
Australia. The CPC transaction, also resulted in Parkway Minerals acquiring the innovative aMES™
technology, which has been developed to process a range of challenging brine streams from the mining
industry, in order to recover valuable minerals, reagents as well as produce fresh water.
Given the significant market opportunities, Parkway Minerals is focused on commercialising a worldclass technology portfolio to provide long-term sustainable solutions for processing complex brines, in
the energy, mining and wastewater industries. In order to achieve this objective, Parkway Minerals is
partnering with leading industry participants to provide, BPaaS – Brine Processing as a Solution™.
Strategic Investment
Parkway Minerals holds a strategic investment in Davenport Resources (ASX: DAV), which has
successfully delineated a globally significant in-situ potash resource (in excess of 550 million tonnes of
contained potash), at its South Harz project in Central Germany. Recently completed scoping studies
have delivered excellent technical and economic results and provide Davenport Resources with an
attractive opportunity to create and unlock substantial value.
Parkway Minerals is commercialising a world-class technology portfolio to provide long-term
sustainable solutions for processing complex brines, in the energy, mining and wastewater
industries.
Our mission is to collaborate with leading strategic partners to deliver:
BPaaS – Brine Processing as a Solution™.
Forward-Looking Statements
This ASX Release may contain certain “forward-looking statements” which may be based on forward-looking information that are
subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially
from those presented here. Where the Company expresses or implies an expectation or belief as to future events or results, such
expectation or belief is expressed in good faith and believed to have a reasonable basis. Forward-looking information includes
exchange rates; proposed or projected project or transaction timelines; uncertainties and risks associated with the advantages
and/or performance of the Company’s projects and/or technologies; uncertainties and risks regarding the estimated capital and
operating costs; uncertainties and risks regarding any envisaged timelines in relations to any results, milestones, partnerships,
including but not limited to any milestones which may require obtaining approvals from third parties.
For a more detailed discussion of such risks and other factors, see the Company’s other ASX Releases. Readers should not
place undue reliance on forward-looking information. The Company does not undertake any obligation to release publicly any
revisions to any forward-looking statement to reflect events or circumstances after the date of this ASX Release, or to reflect the
occurrence of unanticipated events, except as may be required under applicable securities laws.
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 8
Report 1
Karinga Lakes Potash Project
Pre-Feasibility Study (KLPP-PFS)
Summary Report
05 November 2020
|
KLPP Pre-Feasibility Study Completion - ASX Announcement
| 9
Karinga Lakes Potash Project
PRE-FEASIBILITY STUDY
KLPP-PFS
KLPP – JOINT VENTURE
SUMMARY REPORT
4 November 2020
SUMMARY REPORT
Synopsis
The Karinga Lakes Potash Project (KLPP) located in Central Australia (N.T.), is owned through an unincorporated joint
venture (KLPP-JV) between Verdant Minerals Ltd and Parkway Minerals NL (ASX: PWN). The KLPP has undergone
extensive resource exploration and appraisal over a number of years, which has resulted in the delineation of a potassium
resource potentially suitable for potash production. This pre-feasibility study (KLPP-PFS) outlines an innovative (aMES™
based) processing route which may be suitable for developing the KLPP. The KLPP development concept involves the
processing of naturally occurring hypersaline brines from a series of salt lakes, in order to produce 40,000 tonnes per
annum (tpa) of high-purity sulphate of potash (SOP), over an initial mine life of 20 years. The aMES™ technology is owned
by Parkway Minerals NL, which also holds a 1% royalty (NSR) interest over the KLPP.
KLPP-PFS Basis of Preparation
On 8 May 2020, Parkway Minerals signed a Global Strategic Cooperation Agreement with Worley Services Pty Ltd
(hereafter “Worley”) to commercialise the aMES™ technology. On 11 May 2020, Parkway Minerals announced the
commencement of the KLPP-PFS, through collaboration with Worley as study manager and supported by leading industry
consultants and a range of key equipment vendors.
ROLE IN KLPP-PFS
Study Manager
Preparation of Summary Report
KLPP – Joint Venture Partner
Mineral Resource Estimate and Production Plan
Review of Land Tenure and Environmental Studies, Social Impact & Permitting
KLPP-PFS – Summary Report
This report represents a summary of the KLPP-PFS
Disclaimer
This report is provided on the basis that neither Parkway Minerals NL (the “Company) nor its respective directors, officers,
employees, representatives, partners, consultants and advisers, and its related bodies corporate, make any
representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material
contained in this report. Nothing contained in this report is, or may be relied upon, as a promise, representation or
warranty, whether as to the past or the future. Except for statutory liability, the Company hereby excludes, to the full
extent of the law, all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any
person as a consequence of any information in this announcement or any error or omission there from. This report
should be read in conjunction with Chapter 15 (Risks - Cautionary Statements, Risk Factors and Disclaimer).
KLPP Pre-Feasibility Study (KLPP-PFS) | Summary Report
ii
SUMMARY REPORT
Table of Contents
1.
Executive Summary ...................................................................................................................... 11
1.1
Introduction ................................................................................................................................. 11
1.2
Mineral Resource Estimate.......................................................................................................... 11
1.3
Development Concept ................................................................................................................. 13
1.4
Key Financial Metrics ................................................................................................................... 14
2.
Introduction ................................................................................................................................. 16
2.1
History .......................................................................................................................................... 16
2.2
Project Description ...................................................................................................................... 16
2.3
Reliance on Other Experts ........................................................................................................... 18
3.
Climate, Weather and Site Conditions ........................................................................................... 19
3.1
Climate Data ................................................................................................................................ 19
3.2
Rainfall ......................................................................................................................................... 20
3.3
Evaporation.................................................................................................................................. 20
3.4
Geotechnical Assessment ............................................................................................................ 21
4.
Mineral Resource Estimate ........................................................................................................... 23
4.1
Project Description ...................................................................................................................... 23
4.2
Sampling Techniques and Data ................................................................................................... 24
4.3
Estimation and Reporting of Mineral Resources ......................................................................... 26
5.
Production Plan ............................................................................................................................ 34
5.1
Production Trench Design ........................................................................................................... 34
5.2
Brine Production Simulation ........................................................................................................ 34
5.3
Production Plan and Schedule ..................................................................................................... 37
6.
Metallurgical Test Work Program .................................................................................................. 41
6.1
Metallurgical Test Work Program................................................................................................ 41
6.2
Validation of the aMES™ Model .................................................................................................. 48
6.3
Validation of the Process Model ................................................................................................. 50
7.
Pond Design ................................................................................................................................. 51
7.1
Design Standards ......................................................................................................................... 51
7.2
Pond Design Parameters ............................................................................................................. 51
7.3
Pond Walls Design ....................................................................................................................... 52
7.4
Construction Materials ................................................................................................................ 55
8.
Process Plant Design ..................................................................................................................... 56
8.1
Overview & Basis of Design (BOD)............................................................................................... 56
8.2
Process Flow Diagram .................................................................................................................. 59
8.3
Mass Balance ............................................................................................................................... 60
8.4
Energy Balance............................................................................................................................. 61
8.5
Water Balance ............................................................................................................................. 62
9.
Non-Process Infrastructure (NPI)................................................................................................... 63
9.1
Buildings, Amenities and Accommodation .................................................................................. 63
KLPP Pre-Feasibility Study (KLPP-PFS) | Summary Report
iii
SUMMARY REPORT
9.2
9.3
9.4
9.5
9.6
9.7
9.8
General Site Layout...................................................................................................................... 67
Transport and Site Services ......................................................................................................... 69
Mobile Plant and Equipment ....................................................................................................... 70
Power ........................................................................................................................................... 75
Fuel .............................................................................................................................................. 76
Water ........................................................................................................................................... 77
Wastewater Treatment and Reticulation .................................................................................... 77
10. Marketing Studies ........................................................................................................................ 79
10.1 Product Specification ................................................................................................................... 79
10.2 General Marketing Strategy ........................................................................................................ 79
11. Economic Evaluation .................................................................................................................... 83
11.1 Capital Cost Estimate ................................................................................................................... 83
11.2 Operating Cost Estimate .............................................................................................................. 85
11.3 Financial Analysis ......................................................................................................................... 86
11.4 Next Steps & Funding .................................................................................................................. 89
12. Land Tenure ................................................................................................................................. 90
12.1 Overview ...................................................................................................................................... 90
12.2 Tenement Consolidation Process ................................................................................................ 90
12.3 Tenement Status in Relation to Mine Plan .................................................................................. 91
13. Environmental Studies, Social Impact and Permitting .................................................................... 93
13.1 Introduction ................................................................................................................................. 93
13.2 Environmental Impact Assessment Requirements ..................................................................... 93
13.3 Heritage & Exclusion Areas .......................................................................................................... 94
13.4 Licence & Permits
Share your feedback
Discover