SEPTEMBER 2018 QUARTERLY REPORT
COMPANY DETAILS
ABN: 62 147 346 334
PRINCIPAL AND
REGISTERED OFFICE
Parkway Minerals NL
Level 1, 675 Murray St.
West Perth WA 6005
POSTAL ADDRESS
PO Box 1088
West Perth WA 6872
Parkway Minerals (“PWN”,“Parkway” or “The Company”) is pleased to provide
an update of activities for the September 2018 quarter.
HIGHLIGHTS
Davenport Resources (44.3 million shares held, 32%)
• Inferred Resource of 1.1 billion tonnes announced on part of MülhausenNohra mining licence
• Total Inferred Resource now 1.7 billion tonnes @ 11.4% K2O
W www.parkwayminerals.com.au
E info@parkwayminerals.com.au
P +61 8 9479 5386
F +61 8 9475 0847
ASX CODE
PWN
FRANKFURT CODE
A1JH27
Dandaragan Trough Project
• Drilling at Dambadgee Prospect indicates potential to increase
Exploration Target
Strategic Investment
• PWN owns 7.32 million Lithium Australia shares
CORPORATE
INFORMATION
23 October 2018
595M Ordinary shares
123M Partly paid shares
18M Listed Options
68M Unlisted options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Natalia Streltsova
(Non-Executive Director)
1
Parkway Minerals NL – Quarterly Report
September 2018
DAVENPORT RESOURCES
Davenport Resources (DAV) is focused on the development of the South Harz potash field in Thuringia,
Central Germany. Parkway owns 44.2 million Davenport shares. Davenport owns 2 exploration and 3
mining licences (Figs 1 & 2). The mining licences were purchased from the German government in late 2017
(ASX release 25 October 2017) and are perpetual, with no expenditure or royalty commitments. The mining
licences were subject to detailed drilling in 1960s and 80s, when the field was owned by the government of
East Germany. Data from over 100 drill holes is available.
Review of the drill data is in progress and has allowed reporting of significant historic (Soviet era) resources.
The quality of the drilling information is high, and Davenport is working to update the resources to JORC
2012 compliance. To date Ebeleben review has been completed, and allowed the upgrading of 224 million
tonnes of historic resource to over 500 million tonnes of JORC Inferred Resource (refer DAV announcement
16 April 2018). Work is in progress on the Mulhausen-Nohra licence.
Subsequent to the period end, Davenport announced a JORC Inferred Resource on one part of the
Mulhausen-Nohra mining licence (ASX release 16 October 2018). This resource, 1.13 billion tonnes @ 11.1%
K2O, including 834 million tonnes sylvinite @ 12.1 % K2O is substantial, and increases the total Inferred
Resource within the project to 1.7 billion tonnes, with substantial historic resources still to be evaluated
and converted (if possible) to JORC compliant.
A capital raising, via a placement and a share purchase plan was completed during the period, raising $2.4
million.
Figure 1: South Harz Project location
2
Parkway Minerals NL – Quarterly Report
September 2018
Figure 2: Location of mining and exploration licences
DANDARAGAN TROUGH PROJECT
Parkway holds 100% the Dinner Hill Potash and Phosphate Deposit, located some 200km north of Perth in
Western Australia, (Figure 3). Dinner Hill forms part of the larger Dandaragan Trough Project (DTP), where
Parkway holds over 1,000km2 of exploration tenure. Sedimentary rocks within the trough contain
glauconite, a potash rich mica, and phosphate nodules. The objective is to produce phosphate and sulphate
of potash fertilisers and a range of valuable by-products from the phosphate and glauconite present within
the sediments of the Dandaragan Trough. The Dinner Hill Project covers some +332 km2 within the DTP.
Results from a drilling programme on the Dambadgee Prospect were released during the period. At
Dambadgee the greensand sequences are more extensive, seem much thicker, and have a flatter dip than
at Dinner Hill, (Figures 4 & 5). Thicker ore, and the relative depth would offer a significant reduction in
mining costs, and an enhancement in K-Max project value. The drilling also extends the deposit beyond the
previously assumed eastern deposit boundary. In due course this may lead to an increase in the combined
Dambadgee Potash Exploration Target of 3.2 to 4.25 billion tonnes (refer ASX announcement 28 th
September 2017).
3
Parkway Minerals NL – Quarterly Report
September 2018
Figure 3: Location plan, Dandaragan Trough Project
Figure 4: Cross-section through Dambadgee, Dandaragan Trough Project
4
Parkway Minerals NL – Quarterly Report
September 2018
Figure 5: Typical cross-section through Dinner Hill, Dandaragan Trough Project
The DTP has unique advantages of excellent connectivity to transport facilities, infrastructure and proximity
to local and regional markets. It is located within an easy drive from Perth, and is less than 200km from
two major bulk export ports, Kwinana and Geraldton. It is well situated in relation to major project
infrastructure, and significant local and regional markets for its products.
Dinner Hill Resource Statement
The resources for the Dinner Hill project were recalculated and reported to ASX on 26 September 2017.
The resources cover an area of approximately 52 km2 and are shown in Table 1.
DINNER HILL RESOURCE
Table1 Dinner Hill Deposit: Resource Summary
Resource
Category
Phosphate
Indicated
Inferred
Total
Tonnes
(Mt)
160
470
630
Indicated
Inferred
Total
160
470
630
4.2
4.4
4.4
Potash Resource outside the
Phosphate Resource area
Indicated
Inferred
Total
50
230
280
2.65
2.6
2.6
Total Potash Resources
Indicated
Inferred
Totals
210
700
910
3.8
3.8
3.8
Potash
Potash Resources included within
the Phosphate Resource area
P2O5
(%)
2.45
1.7
1.85
K2O
(%)
Note: Totals may differ from sum of individual items due to rounding
5
Parkway Minerals NL – Quarterly Report
September 2018
LAKE SEABROOK PROJECT
Parkway has applied for exploration licences in the Lake Seabrook area, north of Southern Cross.
LAKE BARLEE PROJECT
Results from the Lake Barlee programme were disappointing, with the average potassium levels being circa
1600 mg/liter (refer ASX announcement 8/8/18). The Company has relinquished the exploration licences
covering this project.
SHAREHOLDINGS
Parkway owns shares in the following ASX listed Companies:
• Lithium Australia (ASX: LIT)
7.32 M
• Davenport (ASX: DAV)
44.3 M
Parkway participated in a Davenport capital raising, purchasing an additional 7.2 M shares at 7c.
CORPORATE
Parkway monitors activities and opportunities that may be relevant to the Company’s objectives. This may
include expanding or changing the scope of existing projects or engaging with third parties on other
projects. If a proposal advances, details would be announced in accordance with the Company’s continuous
disclosure obligations.
ANNOUNCEMENTS
The following ASX announcements were made during the quarter:
28/09/2018
28/09/2018
21/08/2018
21/08/2018
15/08/2018
8/08/2018
30/07/2018
24/07/2018
12/07/2018
10/07/2018
Appendix 4G
Annual Report to shareholders
Appendix 3B
Recent Dandaragan Trough Drilling
Results of Meeting
Lake Barlee Drilling Results
Quarterly Activities and Cashflow Report
Becoming a substantial holder
Notice of General Meeting/Proxy Form
Change in substantial holding for DAV
The following ASX announcements were made after the close of the period:
3/10/2018
16/10/2018
Director Resignation & Appendix 3Z
Significant Resource Upgrade for Davenport Resources
CASH ON HAND
At 30 September 2018, $0.67 million cash was available.
6
Parkway Minerals NL – Quarterly Report
September 2018
For further information contact:
Parkway Minerals NL:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Email: info@parkwayminerals.com.au
Web: www.parkwayminerals.com.au
Peter Nesveda
Investor Relations
+61 (0) 412 357 375
peter.nesveda@parkwayminerals.com.au
Competent Person’s Statement:
Dandaragan Trough Project
Information in this announcement that relate to Mineral Resources, are based on, and fairly represent, the
Mineral Resource and supporting documentation extracted from the reports which have been prepared by
a Competent Person in compliance with the JORC Code (2012) and released to ASX by the Company on 26
September 2017 and 28 September 2017. Parkway Minerals confirms that it is not aware of any new
information or data that materially affect the information included in the original announcements. All
material assumptions and technical parameters underpinning the Mineral Resource estimate in those
previous ASX releases continue to apply and have not materially changed. The Company further confirms
that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
Details of Mining Tenements at Quarter ended 30 September 2018 ASX Listing Rule 5.3.3
Australian Project
Tenement ID
Name
Location
State
Interest
E70/3987
Dinner Hill
Dandaragan
WA
100%
E70/4137
Jam Hill
Dandaragan
WA
100%
E70/4138
Bald Hill
Dandaragan
WA
100%
E70/4471
E70/4609
Watheroo
Dandaragan
Dandaragan
Dandaragan
WA
WA
100%
100%
E70/4687
Dandaragan
Dandaragan
WA
100%
E70/5102
Dandaragan
Dandaragan
WA
100%
7
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
Parkway Minerals NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
30 September 2018
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date
(03 months)
$A’000
-
-
(373)
(373)
(d) staff costs
(70)
(70)
(e) administration and corporate costs
(166)
(166)
3
3
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
70
70
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(536)
(536)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
-
-
(b) tenements (see item 10)
-
-
(c) investments
(d) other non-current assets
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(03 months)
$A’000
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
-
-
69
69
Other (Equity Raising Costs)
(22)
(22)
3.10
Net cash from / (used in) financing
activities
47
47
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,165
1,165
(536)
(536)
-
-
47
47
676
676
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing
activities (item 3.10 above)
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
455
745
5.2
Call deposits
221
420
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
676
1,165
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to these parties included in item 1.2
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
70
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation Contributions.
Current quarter
$A'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
75
9.5
Administration and corporate costs
150
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and location
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
E77/2347
E77/2409
E29/985
E77/2445
E77/2446
E77/2447
E29/1015
E77/2450
E77/2451
E77/2452
E57/1051
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
+ See chapter 19 for defined terms
1 September 2016
$A’000
80
305
Nature of interest
SURRENDER
Interest at
beginning
of quarter
Interest
at end of
quarter
100%
0%
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here:
Date: 23 October 2018
(Director/Company secretary)
Print name: Patrick McManus
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have been
financed for the past quarter and the effect on its cash position. An entity that wishes to disclose
additional information is encouraged to do so, in a note or notes included in or attached to this
report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources
and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been
prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule
19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.