Quarterly Activities and Cashflow Reports
Released
Released
Announcement PDF
ASX Announcement
30 January 2015
_____________________________________________________________________________________
QUARTERLY REPORT
COMPANY DETAILS
ABN: 62 147 346 334
Highlights
PRINCIPAL
REGISTERED OFFICE
Potash West NL
Suite 3
23 Belgravia Street
Belmont WA 6104
POSTAL ADDRESS
PO Box 588
Belmont WA 6984
o
o
Scoping Study on Dinner Hill confirms NPV of +$650M
AND
Exploration Licences granted to East Exploration in South
Harz region of Germany.
During the quarter the Company completed a scoping study on developing the
phosphate and K-Max projects at Dinner Hill as a two stage project. Results were
announced in early January and show a strong project, with IRR of 30% , and a
low entry capital cost of $136M
W www.potashwest.com.au
The Kuellstedt and Grafentonna licences in Thuringia, Germany, were granted in
early January.
E info@potashwest.com.au
Dandaragan Trough Project
P +61 8 9479 5386
Potash West NL (“Potash West” or “the Company”) has continued to advance the
Dinner Hill project. In the quarter Base Line studies were carried out, results are
expected in early 2015. A new financial model of a combined phosphate & KMax operation was completed.
F +61 8 9475 0847
ASX CODE
PWN
OTC PINK CODE
PWNNY
CORPORATE
INFORMATION
(30 January 2015)
200M Ordinary shares
36M Partly paid shares
5M Unlisted options
8M Listed options
BOARD OF DIRECTORS
Adrian Griffin
(Non-Executive Chairman)
Patrick McManus
(Managing Director)
Chew Wai Chuen
(Non-Executive Director)
Gary Johnson
(Non-Executive Director)
The Dandaragan Trough project is focused on exploiting the large greensands
deposits, which commence less than 100km to the north of Perth, Western
Australia. The objective is to produce potash and single superphosphate fertilisers
and a range of valuable by-products from the glauconite and phosphate present
within the greensands.
The greensands within the Dandaragan Trough are widespread. The Dinner Hill
project area covers approximately 60 km2 in the north-west of the Trough ( figure
1). Within the project area PWN has established an exploration target of 1000Mt
to 1500Mt of fresh greensand at a grade of between 4.0% and 4.8% K 2O, 8% and
10% Al2O3, 12% and 14% Fe2O3, and 2.0% and 2.4% MgO. Included within the
Exploration Target is 300-600Mt of phosphate mineralisation at a grade of
between 1.5% and 3% P2O5. (refer ASX announcement 7 May 2013).
The potential quantity and grade of the target is conceptual in nature, as there has
been insufficient exploration to estimate a Mineral Resource over its area and as
it is uncertain if further exploration will result in the estimation of a Mineral
Resource.
1
Potash West NL – Quarterly Report
January 2015
An area of approximately 9 km2 within Dinner Hill has been drilled to establish Indicated and Inferred
Mineral Resources for potash (K-Max) and phosphate. The higher grade portion of the K-Max resource
occurs in the Molecap Greensand. Nodular phosphate mineralisation at Dinner Hill occurs within a chalk
unit, the Gingin Chalk and in upper and lower greensand units, the Poison Hill Greensand and the Molecap
Greensand.
Current resource figures are shown in table 1:
Phosphate Resource (All Indicated) (1)
Lower Cut-off
Million
Grade
Grade
Grade
Tonnes
(% P2O5) (% K2O)
(% P2O5)
2.15
120
2.79
3.10
K-Max Resource (2)
Unit
Category
Tonnes
K2O
(Mt)
%
Molecap
120
4.6
Greensand
Indicated
Inferred
2
4.4
Total
122
4.6
Grade
(% CaO)
8.17
P2O5
%
1.8
2.2
1.8
Table 1 Dinner Hill Resources
(1) Refer ASX release 20 March 2014)
(2) Refer ASX release 11 October 2012)
The Dandaragan Trough project has unique advantages of excellent connectivity to transport facilities,
infrastructure and proximity to local and regional markets. The Dinner Hill resource is located less than
200km from two major bulk export ports, Kwinana and Geraldton and is well situated in relation to major
project infrastructure.
2
Potash West NL – Quarterly Report
January 2015
Figure 1 – Dandaragan Trough Project tenure plan
3
Potash West NL – Quarterly Report
January 2015
Dinner Hill Scoping Study
The Dinner Hill development plan was reviewed and re-estimated during the period and a report finalized
and released in Janaury (refer ASX release 13 January 2015). Previous studies had evaluated the phosphate
and K-Max projects as independent operations. The integrated project has recognized the synergies of
using a common mining and beneficiation plant and the lower operating costs associated with a larger scale
operation producing sulphuric acid from purchased sulphur.
The financial evaluation has been based upon mining at the rate of 4.2Mtpa. In Stage 1, for the first five
years only the phosphate rich part of the ore sequence is mined to produce single superphosphate (SSP).
The potassium rich glauconite layer will be exposed, but not mined initially. We have assumed that the KMax plant and an upgraded phosphate plant will be constructed after 5 years, as Stage 2. The benefits of
this are:
Lower Capital requirement, of $136M to start Stage 1
Commission mining and Beneficiation Plant at Stage 1 with lower capital spend, reducing risk.
Areas of exposed K-Max ore will allow low mining costs for first few years of Stage 2
Free cash flow from Stage 1 operations can contribute to equity component of Stage 2 capital
The key points of the modelling are:
Mine Life, on indicated resource
Stage 1 Capex
Stage 2 Capex
IRR (pre-tax, ungeared)
NPV (12%)
EBITDA Stage 1
EBITDA Stage 2
+20 years
$136M
$590M
30%
$652M
$61M pa
$261M pa
Project schedule
The current time frame for commercialisation of the Dandaragan Phosphate Project is:
Upgrade a significant portion of the current Indicated and Inferred Mineral Resources to the
Measured category by December 2015
Completion of a Feasibility Study by Dec 2015
Completion of construction in Q4 2017
Start-up of full scale production in Mid-2018.
This programme is under review at present.
German Project
The Company is earning a 55% interest in a company, East Exploration Pty Ltd (EE), which has applied for
exploration licences in the South Harz region of Germany, (Figure 2). The funding will complete the
licence applications and carry out an assessment of the extensive geological data on one of the exploration
applications, Kullstedt, (Figure 3).
The South Harz region has a long history of potash mining, dating back to the late 1890s. Extensive
exploration work and R&D was carried out in the period from the 1960s to the 1980s. This confirmed that
substantial potash deposits in the form of sylvinite (KCl/NaCl) and carnallite (KCl/MgCl) still remain in
this region.
4
Potash West NL – Quarterly Report
January 2015
Two areas, Kullstedt (246 sq km) and Graefentonna (216 sq km) have been applied for. Both have
extensive historical drilling that intersected potash mineralisation. Both areas are adjacent to properties that
have had significant potash production over the last 100 years.
The Company was notified in early January that both licences have been granted (refer ASX release
January 16 2015).
Review of the archived exploration data relating to historical drilling on Kuellstedt is in progress. A report
is expected within the first quarter of 2015. It is expected that the report will identify potash seams,
allowing estimation of exploration targets and location of drilling programs.
Fig 2: Project Location
5
Potash West NL – Quarterly Report
January 2015
Figure 3: Kuellstedt application
Corporate
Mr George Sakaladis resigned as Non-Executve director and was replaced by Mr Chew Wai Chuen. Mr
Chew is an experienced finaincial advisor, based in Singapore.
Announcements
The following ASX announcements were made during the quarter:
Trading Halt (October 07, 2014)
Suspension from Official Quotation (October 09, 2014)
Completion of $2,900,000 Placement (October 10, 2014)
Reinstatement To Official Quotation (October 10, 2014)
s708A Notice & Appendix 3B (October 20, 2014)
Notice of Annual General Meeting/Proxy Form (October 27, 2014)
Presentation (October 30, 2014)
Quarterly Activities and Cashflow Reports (October 30, 2014)
Company Secretary Appointment/Resignation (November 10, 2014)
Appendix 3B (November 10, 2014)
Director Resignation (November 14, 2014)
Becoming a substantial holder (November 20, 2014)
Analyst Coverage – Arrowhead Report (November 24, 2014)
AGM Presentation (November 26, 2014)
Results of Meeting (November 26, 2014)
Change of Directors (December 01, 2014)
Becoming a substantial holder (December 01, 2014)
Option Expiry (December 01, 2014)
6
Potash West NL – Quarterly Report
January 2015
The following announcements were made subsequent to 31 December, 2014:
Appendix 3B (January 07, 2015)
PWN Achieves Significantly Improved Economics for DinnerHill (January 13, 2015)
Potash West Question & Answer Session (January 14, 2015)
East Exploration granted exploration licences in Germany (January 16, 2015)
Cash on Hand
At 31 December 2014, $2.3 million cash was available.
Tenement Summary
The following information is provided in accordance with ASX Listing Rule 5.4.3:
Country Tenement
Tenement
Interest held at 1
October June
2014
Interest acquired
/ disposed of
during quarter
Tenement
Interest held at
31 December
2014
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
WA
100% (1)
100% (1)
100% (1)
100% (1)
100% (1)
Pending
100%
100%
100%
100%
Pending
Pending
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
100%
100%
100%
100%
100%
Pending
100%
100%
100%
100%
Pending
Pending
E70/3360
E70/3418
E70/3987
E70/3988
E70/3989
E70/4124
E70/4137
E70/4138
E70/4139
E70/4471
E70/4609
E70/4687
(1) Denotes Beneficial holding of the Mineral Rights to Glauconite & Phosphate, and any byproducts
resulting
For further information contact:
Potash West NL:
Media:
Patrick McManus
Managing Director
Tel: +61 (08) 9479 5386
Web: www.potashwest.com.au
Professional Public Relations
Colin Hay
Tel: +61 (08) 9388 0944
7
Potash West NL – Quarterly Report
January 2015
About Potash West
Potash West (ASX:PWN) is an exploration company focused on developing large greensand deposits in
West Australia’s Perth Basin. The Company aims to define a substantial resource base and investigate
how best to recover potash and other minerals from the Dandaragan Trough. The project is well situated
in relation to infrastructure, with close access to rail, power and gas. A successful commercial outcome
will allow the Company to become a major contributor to the potash and phosphate markets at a time of
heightened regional demand.
The Company has a major land holding over one of the world’s largest known glauconite deposits, with
exploration licenses and applications covering an area of over 2,100km2. Previous exploration indicates
glauconite sediments are widespread for more than 150km along strike and 30km in width. Current JORC
compliant Indicated Mineral Resources stand at 241Mt at 3.0% K2O, including 120Mt at 4.6% K2O
amenable to processing by the K-Max process and 120Mt at 2.8% P2O5 of phosphate mineralisation.
Forward Looking and Cautionary Statement:
The scoping study referred to in this report is based on low-level technical and economic assessments and
is insufficient to support any estimation of Ore Reserves or to provide assurance of an economic
development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be
realised.
The use of the word “ore” in the context of this report does not support the definition of “Ore Reserves” as
defined by the 2012 Edition of the ‘Australasian Code for reporting of Exploration Results, Mineral
Resources and Ore Reserves. The word ‘ore’ is used in this report to give an indication of quality and
quantity of mineralized material that would be fed to the processing plant and it is not to be assumed that
‘ore‘will provide assurance of an economic development case at this stage, or to provide certainty that the
conclusions of the scoping study will be realized.
Certain statements contained in this announcement, including information as to the future financial or
operating performance of Potash West and its projects, are forward-looking statements. Such forwardlooking statements are necessarily based upon a number of estimates and assumptions that, whilst
considered reasonable by Potash West, are inherently subject to significant technical, business, economic,
competitive, political and social uncertainties and contingencies; involve known and unknown risks and
uncertainties that could cause actual events or results to differ materially from estimated or anticipated
events or results reflected in such forward-looking statements; and may include, among other things,
statements regarding targets, estimates and assumptions in respect of potash and phosphate production
and prices, operating costs and results, capital expenditures, ore reserves and mineral resources and
anticipated grades and recovery rates, and are or may be based on assumptions and estimates related to
future technical, economic, market, political, social and other conditions.
Forward-looking statements are necessarily based upon a number of estimates and assumptions related to
future business, economic, market, political, social and other conditions that, while considered reasonable
by Potash West, are inherently subject to significant uncertainties and contingencies
Potash West disclaims any intent or obligation to update publicly any forward-looking statements, whether
as a result of new information, future events or results or otherwise. The words “believe”, “expect”,
“anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”,
“may”, “will”, “schedule” and other similar expressions identify forward-looking statements. All
forward-looking statements made in this announcement are qualified by the foregoing cautionary
statements. Investors are cautioned that forward looking statements are not guarantees of future
performance and accordingly investors are cautioned not to put undue reliance on forward-looking
statements due to the inherent uncertainty therein.
8
Potash West NL – Quarterly Report
January 2015
The Company is of the opinion that it has reasonable basis for providing the forward looking statements
included in this announcement, including with respect to production targets, based on the information
contained in this announcement and in particular the JORC 2012 Mineral Resource for Dinner Hill as of
March 2014. This estimate was compiled by Continental Resource Management Pty Ltd. Additional
independent metallurgical studies, determination of mining inventory, mine design and scheduling, external
commodity price and operating cost data were undertaken by industry consultants.
Competent Person’s Statement:
The production targets and other information in this announcement that relate to Mineral Resources are
based on, and fairly represent, the Mineral Resource and information and supporting documentation
extracted from the report which was prepared by a Competent Person in compliance with the JORC Code
(2012) and released to ASX by the Company on 20 March 2014. Potash West confirms that it is not aware
of any new information or data that materially affect the information included in the original
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimate in that previous ASX release continue to apply and have not materially changed.
9
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
Potash West NL
ABN
Quarter ended (“current quarter”)
62 147 346 334
31 December 2014
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration & evaluation
(b) development
(c) production
(d) administration
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (Government grant and R&D refund)
Net Operating Cash Flows
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 1
Current quarter
$A’000
Year to date
(6 months)
$A’000
(245)
(443)
(354)
(813)
9
11
(590)
(1,245)
(50)
(100)
(640)
(1,345)
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
1.13
(640)
(1,345)
2,830
3,721
(193)
2,637
(248)
3,473
Net increase (decrease) in cash held
1,997
2,128
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
295
164
1.22
Cash at end of quarter
2,292
2,292
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (Equity Raising Costs)
Net financing cash flows
Payments to directors of the entity, associates of the directors,
related entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
1.24
Aggregate amount of loans to the parties included in item 1.10
1.25
Explanation necessary for an understanding of the transactions
161
Item 1.23 relates to Directors Remuneration, Directors Fees and Superannuation Contributions.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available
$A’000
3.1
Loan facilities
3.2
Credit standby arrangements
Amount used
$A’000
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluation
400
4.2
Development
4.3
Production
4.4
Administration
300
Total
700
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows)
to the related items in the accounts is as follows.
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 3
Current quarter
$A’000
Previous quarter
$A’000
2,292
295
2,292
295
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
Tenement
reference
and
location
6.1
6.2
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
Interests in mining
tenements and
petroleum tenements
acquired or increased
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
NIL
N/A
N/A
N/A
E70/4687
APPLICATION
0%
100%
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks
+Convertible
debt
securities
(description)
Number quoted
Issue price per
security (see
note 3) (cents)
Amount paid up
per security (see
note 3) (cents)
197,914,005
35,960,024
197,914,005
35,960,024
$0.001
$0.049
59,250,000
1,250,000
59,250,000
1,250,000
$0.050
$0.035
$0.050
$0.035
+ See chapter 19 for defined terms.
Appendix 5B Page 4
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised
during quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
100,000
100,000
1,350,000
8,221,457
1,000,000
500,000
1,992,188
1,992,188
8,221,457
-
Exercise price
$0.400
$0.600
$0.355
$0.300
$0.130
$0.150
$0.087
$0.087
Expiry date
8 September 2016
8 September 2016
13 November 2015
15 March 2015
25 October 2015
7 February 2017
6 November 2017
6 November 2017
1,250,000
-
$0.280
30 November 2014
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards
acceptable to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Sign here:
Patrick McManus
30 January 2015
............................................................ Date: ............................
(Director)
Print name:
Patrick McManus
.........................................................
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash
position. An entity wanting to disclose additional information is encouraged to
do so, in a note or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of
interests in mining tenements and petroleum tenements acquired, exercised or
lapsed during the reporting period. If the entity is involved in a joint venture
agreement and there are conditions precedent which will change its percentage
interest in a mining tenement or petroleum tenement, it should disclose the
change of percentage interest and conditions precedent in the list required for
items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not
required in items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied
with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6
01/05/2013
Share your feedback
Discover